Flexible supply · Your drawings, your scope

Your design. Our shop. Shipped to your US port.

Already have stamped drawings? World Steel USA checks them, fabricates exactly what they show in its IAS AC472 plant and ships the steel to a US port. Need less, or more? Pick frame only, shell or a complete package, and choose which stages we carry.

Your drawings
Built to the stamped set, with no silent redesign
Your scope
Frame only · Shell · Complete package
Your role
Dealers, erectors, GCs, owners, engineers
One plant
IAS AC472 Part A fabrication · Part C design

Buy only the stages you need

Pick the stages we carry

Every order passes through the same four stages. The difference is who owns each one. Choose the model closest to your team, or describe your own split and we put it in the contract.

Supply model Consult Design Fabricate Deliver
Featured on this page Build to your drawings

Your engineer has designed the structure. You need it detailed, fabricated and shipped.

How it works →
Consult World Steel Drawing check and RFIs
Design You Your Engineer of Record. We prepare shop drawings
Fabricate World Steel Frame only, shell or complete package
Deliver World Steel Packed and shipped to a US port
All four stages Total solution

You have a site and a program, and want one accountable supplier from design to delivery.

See the total solution →
Consult World Steel Framing system and scope letter
Design World Steel IBC 2024, ASCE 7-22, AISC 360, AISI S100
Fabricate World Steel The complete metal building
Deliver World Steel Packed and shipped to a US port
Your logistics Fabricate for your freight

You import steel already and want the package ready for your own forwarder and broker.

Vietnam to USA logistics →
Consult World Steel Drawing check and RFIs
Design You Your design, or ours on request
Fabricate World Steel To your approved drawings
Deliver You Your forwarder, under the agreed Incoterm
Decide later Engineering review first

The design is still moving, or the steel number came in higher than budget.

Value Engineering →
Consult World Steel Engineering check of your set or sketch
Design World Steel Value Engineering options for your engineer
Fabricate Later When you are ready
Deliver Later When you are ready

World Steel USA handles it Your firm or your consultants Open until you decide

Build to your drawings

We fabricate what your engineer designed

Here the design stays with your Engineer of Record. Our role is to turn the issued drawings into steel that bolts up on site: we check the set for gaps, detail each member and connection in Tekla Structures, fabricate in our own plant in Vietnam and ship the pieces bundled in the order your erector will set them.

We do not redesign your structure. Questions go to your engineer as numbered RFIs, and nothing on the drawings changes without written approval. Where we spot a way to save steel, it arrives as an optional Value Engineering proposal that your engineer is free to accept or decline.

Pick your starting point

Design drawings and calculations

You send the engineer’s set. We detail shop drawings in Tekla Structures and submit them for approval before any steel is cut.

Detailing already done

Your detailer has finished shop drawings or an IFC fabrication model. We check them against our shop standards and build to them.

Welder looking over the stiffeners and end plate of a heavy column Photo
PEB Studio: member digital passport, demonstration data Demonstration data

What you send

  • Structural drawings issued for construction, or your latest set
  • Connection details, or the design forces to detail them from
  • Specification: steel grades, bolts, welding and coating
  • IFC model, DWG or PDF, plus a takeoff if you have one
  • Jobsite address, preferred US port and your required-on-site date

What comes back

  • A drawing check with a numbered RFI log
  • A scope letter naming inclusions, exclusions, the Incoterm and the importer of record
  • Shop and erection drawings for your approval
  • Members fabricated to the approved drawings, each with a QR piece mark
  • Mill test reports, inspection records and a locked packing list

Step by step

How an order to your drawings runs

A build-to-print order moves through six gates. None closes until a document you can read is issued, and your project manager logs each one in PEB Studio so you can follow from the US.

  1. Send your set

    You
    Upload drawings, model and specification
    World Steel
    An engineer logs the package and confirms what arrived

    Receipt and document list

  2. Check and RFIs

    You
    Your engineer answers the RFIs
    World Steel
    Review for missing data, clashes and shop issues

    RFI log

  3. Scope and price

    You
    You confirm scope, Incoterm and importer of record
    World Steel
    Scope letter by item, with exclusions named

    Scope letter and quotation

  4. Shop drawings

    You
    Signed off by you or your EOR
    World Steel
    Tekla detailing, piece marks, bolt and weld lists

    Approved shop drawings

  5. Fabrication and inspection

    You
    Witness on site, by your inspector or by video
    World Steel
    Fabrication, AWS D1.1 welding, coating, QC release per member

    Inspection records

  6. Packing and shipping

    You
    Your erector or broker receives the cargo
    World Steel
    Erection-order packing, loading photos, export documents

    Locked packing list

Who we supply

Same plant, a different scope for each buyer

Your role decides how much of the job you keep in house. These are the models each group picks most often.

Owners and developers

What you are after: One accountable supplier and a clear scope instead of coordinating four vendors.

What we take on: Choose the total solution, or bring your own architect and engineer and have us supply frame only, a shell or a complete package to their drawings.

Typical pick

Public works contractors

What you are after: Steel built to the agency’s design and specification, with records for the project file.

What we take on: We fabricate to the issued documents and keep mill test reports and inspection records per member. Federal buyers confirm foreign-steel rules with the contracting officer before ordering.

Typical pick

Clear lines

Who carries which responsibility

On an order to your drawings, the line between design and fabrication is written into the contract. This is the usual division.

ItemWorld SteelYou or your engineer
Structural design and calculationsChecks the drawings for fabrication and raises RFIsYour Engineer of Record designs and seals
Connection designDetails connections as shown; designs them only when delegated in writingShows the connections, or the forces to design them for
Shop and erection drawingsPrepares them in Tekla StructuresApproves them before fabrication
MaterialsUses the grades on the drawings, with mill test reports by heat numberApproves any substitution in writing
Fabrication, welding and coatingOwn plant, AWS D1.1 welding, coating to your specificationMay witness on site, by an inspector or by video
Packing, loading and export documentsPacks in erection order and issues export documentsApproves the shipment
Ocean freight, customs entry and dutiesPer the Incoterm and importer of record on the quotePer the Incoterm; inland trucking coordinated with you
Foundations, erection and permitsErection drawings and remote supportYour general contractor, erector and engineer

Rather hand us the design too? Compare the split on an end-to-end order →

Asked by US GCs and engineers

Fabricating to your drawings: questions

Can you fabricate to drawings our engineer already stamped?

Yes. Send the structural set and specification. We check it, prepare shop drawings for approval, fabricate to them and ship the steel to a West, Gulf or East Coast port.

Can we buy only the frame, or just a shell?

Yes. You can order primary and secondary framing only, a shell with roof and wall panels, or a complete package with doors, windows, insulation and accessories.

Will you change our design?

No. Questions go to your engineer as RFIs and nothing changes without written approval. Value Engineering ideas are offered as options only.

Who carries design responsibility?

Your Engineer of Record keeps responsibility for the design. World Steel USA is responsible for fabricating to the approved shop drawings and for its quality records. We take on connection design only if your contract assigns it to us in writing.

Which file formats can we upload?

Drawings as PDF, DWG or DXF; models as IFC; schedules as XLSX, XLS or CSV; specs as DOCX; plus ZIP archives and photos. A Tekla or IFC model helps, but a drawing set is enough to start.

Can we use our own forwarder and customs broker?

Yes. We hand the cargo over as the agreed Incoterm sets out and your forwarder takes it from there, or we arrange ocean freight to your chosen US port. The quote states who is importer of record.

Holding a stamped set for a US job?

Upload it as it stands. One of our engineers reads the drawings and comes back with RFIs or a priced scope for just the stages you want us to carry.