Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

North Carolina · Aerospace and aviation

Long-span steel for North Carolina aerospace

North Carolina builds aircraft and aircraft parts at the Piedmont Triad airport in Greensboro, the Global TransPark in Kinston and around Charlotte, and maintains defense and commercial fleets across the state. Assembly halls and hangars need wide, column-free spans, crane-served bays and huge door openings. Their steel is long-span, heavy and closely coordinated with the doors.

Market
Greensboro, Kinston, Charlotte, the coast
Spans
Wide, column-free halls and hangars
Openings
Hangar doors framed for door loads
Cranes
Bridge cranes in assembly bays

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to Wilmington, Norfolk or Charleston.

Curved long-span trusses being set during erection
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

Why it matters

The door drives the frame

An aircraft hangar or assembly hall is defined by its door: an opening as wide as the building, with no column in the middle. The header over it carries the roof, the door’s own weight and its wind reactions across the full span, and it must deflect little enough for the door to run.

Assembly halls add bridge cranes and heavy equipment, and some add mezzanines for offices and stores along the walls. We fabricate trusses, deep built-up members and crane runway beams to the Engineer of Record’s design and the door and crane suppliers’ loads.

What we fabricate

Steel for aerospace buildings

Long-span frames and trusses

Clear spans for hangars and assembly halls, sized for the aircraft they house.

Hangar door headers

Deep trusses or girders over the door, designed for door weight, wind and deflection limits.

Crane bays

Crane runway beams and columns for bridge cranes in assembly bays.

Mezzanines and shops

Mezzanine frames for offices, tool cribs and stores along the walls.

Support buildings

Parts warehouses and shops on the same campus.

Offices and training

Multi-story steel frames for offices and training centers.

What we do not claim

We name no aerospace or airline company as a World Steel customer and claim no FAA approval for a building. Hangar door, fire protection and airfield requirements are set by the owner and the authority; we fabricate the steel to the approved design.

North Carolina ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · North Carolina contractors

North Carolina contractors: let’s win the next project together

If your next bid involves aerospace and aviation, World Steel wants to be your long-term, win-win steel partner in North Carolina. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your North Carolina project is cut, welded, inspected and packed.

Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Space-truss roof being erected over a large food processing hall
Space-truss roof under erection on a World Steel job in southern Vietnam.
Red curved roof of a steel building, photographed from the air
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.

Q&A

What North Carolina buyers ask

Can you fabricate hangar door headers?

Yes. We fabricate deep trusses and built-up girders over hangar doors to the Engineer of Record’s design, including the door supplier’s loads and deflection limits.

Do you supply the hangar doors?

We frame the opening for the door your design specifies. Hangar doors are usually supplied by specialist US door manufacturers.

Can a hangar be expanded later?

Yes, if planned. End walls and connections can be designed so another bay can be added without rebuilding the first.

Official sources: Economic Development Partnership of North Carolina: aerospace

North Carolina solutions

Every North Carolina guide

Related pages

Code facts on this page summarize North Carolina rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in North Carolina?

Send the drawings or the site address, size and use. We set the North Carolina design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.