North Dakota · Snow and cold
Structural steel for North Dakota blizzards and deep cold
North Dakota winters bring some of the lowest temperatures in the lower 48 states and blizzards that move snow across open land, piling drift against doors, lower roofs and equipment. Heated buildings must keep the cold out. We design the steel for the snow, drift, wind and cold of each site.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail for your North Dakota site.
- Cold
- Among the lowest in lower 48
- Snow
- Blizzard drift
- Envelope
- Thermal breaks
- Frost
- Deep footings
Why it matters
Drift, wind and cold together
A heated shop with a wide door on the leeward side fills with drift after a blizzard, while the frame carries open-plains wind. Thermal bridges at girts and columns frost over and waste heat all winter.
We size roof steel for drift at every step, design bracing and door framing for the wind, detail thermal breaks, specify steel toughness for low temperatures where your engineer requires it and give your foundation engineer frost-depth reactions.
What we design and fabricate
Steel for heavy snow
Purlins for drift
Z purlins lapped and sized where drift collects.
Rafters and trusses
Built-up rafters and trusses for heavy snow over long spans.
Thermal breaks
Details that keep cold out of heated and frozen spaces.
Base reactions
Clear reactions for footings set below the frost line.
Who does what
Snow and frost, split clearly
World Steel supplies
- Roof steel designed for snow and drift to ASCE 7
- Drift checks at steps, parapets and rooftop units
- Thermal break details at the envelope
- Base reactions for the foundation design
- Tekla shop and erection drawings, included
The US contractor arranges
- Ground snow and exposure with the Engineer of Record
- Engineer of Record approval and PE seal
- Frost depth and footing design
- Cold-weather concrete and site work
- Erection and site work
North Dakota
What we do not claim
World Steel does not design foundations. Frost depth and footing design are your foundation engineer’s scope; we provide the base reactions they need.
North Dakota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · North Dakota contractors
North Dakota contractors: let’s win the next project together
If your next bid involves blizzards and deep cold, World Steel wants to be your long-term, win-win steel partner in North Dakota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your North Dakota project is cut, welded, inspected and packed.
Q&A
What North Dakota buyers ask
Can you supply steel for very low temperatures?
Yes. We specify toughness and Charpy testing where your engineer requires it.
Do you check drift at doors?
Yes. Drift at doors, roof steps and units is checked on every building.
Do you design the footings?
No. Your foundation engineer designs them; we provide the reactions.
Official sources: North Dakota State Climate Office
North Dakota solutions
Every North Dakota guide
Related pages
Code facts on this page summarize North Dakota practice, the North Dakota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in North Dakota?
Send the drawings or the site address, size and use. We set the North Dakota design basis with your Engineer of Record, design or detail the steel to the North Dakota State Building Code, blizzard drift and deep cold, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail for the truck to your site.