Project overview
About Southern Vietnam Petrochemical Complex
World Steel provided steel structure design, fabrication and supply for the Southern Vietnam Petrochemical Complex in Long Son, Ba Ria–Vung Tau, in 2022: about 2,000 metric tons (2,200 short tons) of steel structures covering more than 56,000 m² (about 600,000 sq ft) for the oil and gas sector. Energy and process plants in general hold steel to strict owner specifications, with detailed inspection records, traceable materials and close coordination with piping and equipment contractors on a busy site.
US refineries, chemical plants, renewable fuels projects and other process owners work under similar specifications. We support those requirements with documented fabrication in an IAS AC472-accredited facility, Tekla Structures models for clash checking and drawings for your Engineer of Record to approve. Pipe racks, platforms and equipment buildings are scopes worth discussing. Send your specification package.
About 2,000 tonnes for the Long Son petrochemical complex, which covers more than 56,000 m². Oil and gas owners have strict specifications for welding, coating and inspection records, and meeting them is good preparation for US energy and process work.
Gallery
Southern Vietnam Petrochemical Complex images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Southern Vietnam Petrochemical Complex by the numbers
Steel weight
About 2,000 metric tons of structural steel (2,205 short tons), about 80% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 4th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Southern Vietnam Petrochemical Complex is one of 2 energy and process plants in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Southern Vietnam Petrochemical Complex in 2022, together with 12 other projects shown here from that year.
More energy and process plants:
Design points
What an energy & process plant needs from its steel
General points for every energy & process plant, not specific to this one.
Framed around equipment
Plant structures follow equipment, piping and access routes rather than a simple floor grid.
Learn more →Safe access
Platforms, stairs, ladders and guards are detailed and fabricated with the main steel so operators can reach every valve and motor.
Learn more →Aggressive environments
Chemical fumes, wash-down and coastal air call for a coating system chosen for the exposure, with a maintenance plan.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Energy & process plant. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Khanh Hoa Province, Vietnam · 2019
Thuan Bac Solar Power Plant (Trung Nam Ninh Thuan)
Energy & process plant
Photo
Chon Thanh, Dong Nai Province, Vietnam · 2026
New Hope Dong Nai Feed Factory
Factory
Photo
Hai Phong City, Vietnam · 2020
Hai Duong Tongwei Animal Feed Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning an energy & process plant in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.