Arkansas · Food plants
Structural steel for Arkansas poultry and food plants
Arkansas is one of the largest poultry producers in the country, with processing plants, hatcheries, feed mills and cold storage around Springdale, Rogers, Russellville and the south. These are wet, cold, busy buildings. We fabricate their halls, platforms and cold room steel.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New Orleans or Houston for your Arkansas site.
- Hubs
- Springdale, Rogers, Russellville
- Plants
- Poultry, feed, food
- Coatings
- Washdown systems
- Cold rooms
- Thermal break details
Why it matters
Wet rooms beside running lines
A poultry plant combines washdown process rooms, chillers, freezers and docks under one roof, and expansions usually go up next to a plant that keeps running. Humidity and cleaning chemicals attack bare steel.
We choose galvanized, duplex or paint systems for each room, detail thermal breaks for cold rooms and release the steel in phases that fit the owner’s tie-in plan.
What we design and fabricate
Steel for food plants
Process halls
Clear-span halls over production lines.
Platforms and mezzanines
Equipment platforms, catwalks and mezzanines.
Washdown coatings
Galvanized, duplex or paint systems for wet rooms.
Cooler and freezer steel
Frames with thermal breaks for cold rooms.
Who does what
Plant steel, split clearly
World Steel supplies
- Process hall, platform and mezzanine steel
- Coating systems chosen for each room
- Phased releases next to running lines
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process layout with the owner and equipment suppliers
- Engineer of Record approval and PE seal
- Food safety and sanitation design
- Equipment setting and piping
- Erection and site work
Arkansas
What we do not claim
World Steel names no Arkansas food company as a customer and makes no food safety or sanitation claim. Food safety design is the owner’s and their team’s scope.
Arkansas ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Arkansas contractors
Arkansas contractors: let’s win the next project together
If your next bid involves poultry and food plants, World Steel wants to be your long-term, win-win steel partner in Arkansas. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Arkansas project is cut, welded, inspected and packed.
Q&A
What Arkansas buyers ask
Which coatings suit poultry plants?
Usually galvanizing or duplex systems in wet rooms. Your team confirms them with the sanitation plan.
Can you build beside a running plant?
Yes. We release the steel in phases that match the owner’s shutdowns.
Do you design the refrigeration?
No. Refrigeration and sanitation design are your team’s scope.
Official sources: Arkansas Department of Agriculture
Arkansas solutions
Every Arkansas guide
Related pages
Code facts on this page summarize Arkansas practice, the Arkansas Fire Prevention Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Arkansas?
Send the drawings or the site address, size and use. We set the Arkansas design basis with your Engineer of Record, design or detail the steel to the Arkansas Fire Prevention Code, New Madrid seismic rules and storm loads, and quote it made in our plant in Vietnam, packed in erection order and delivered through New Orleans or Houston to your site.