Georgia structural steel solutions

Structural steel for large Georgia projects, landed at Savannah

EV and battery plants near the coast and along I-85, data center campuses around Atlanta, port warehouses on I-16 and food plants from Gainesville to Tifton: Georgia is one of the busiest building markets in the US. We design the steel to the Georgia State Minimum Standard Codes, fabricate it in our own plant in Vietnam and land it at the Port of Savannah.

Large-project capacity

2,500 t a month

from our own IAS AC472 accredited plant in Vietnam

5,000 tSunpro Steel Factory2,500 tCPV Food Processing Factory2,000 tLong Son petrochemical complex

The Savannah gateway

One port, three lanes inland

Steel from our plant lands at the Port of Savannah and runs inland on three lanes that reach almost every industrial site in Georgia. Below them, the six regions where the loads and the market change.

Port of
Savannah
Where your steel lands

I-16 and I-75

Savannah to Macon, then Atlanta and North Georgia. Distribution, data centers and manufacturing in metro Atlanta.

I-95 and the coast

Savannah to Brunswick and the Florida line. Port warehouses, cold storage and the EV supplier parks on the coast.

Rail inland

Savannah to the inland rail ports and the I-85 corridor. Plants in Northeast and Northwest Georgia, from Commerce to Dalton.

Savannah and the coast

The port, the I-16 and I-95 logistics parks and the EV plant and supplier sites in Bryan and Effingham counties, under hurricane wind.

Metro Atlanta

Data center campuses, the largest distribution market in the Southeast, studios and multi-story work.

Northeast Georgia and the I-85 corridor

Battery, automotive and food plants from Gainesville to Commerce and Athens.

Northwest Georgia

Dalton, Rome and Cartersville: flooring, solar module and heavy manufacturing plants.

South and Southwest Georgia

Farms, peanut and pecan processing, cold storage and timber, around Albany, Tifton and Valdosta.

Middle Georgia

Macon, Warner Robins and Columbus: aerospace maintenance, defense suppliers and distribution on I-75.

Ready for Georgia

What a large Georgia project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released in erection sequences.

Large-project program →

Savannah delivery

Shipments planned to Savannah or Brunswick, packed in erection order for the run inland.

Georgia ports guide →

Coastal wind

Wind loads to ASCE 7 for your site, with openings and cladding detailed for coastal pressures.

Coastal wind guide →

Humidity and coatings

Coating systems and condensation details picked for Georgia’s humid air and the building’s use.

Humidity guide →

Accredited plant

The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.

IAS AC472 accreditation →

Shop drawings included

Tekla shop and erection drawings for every Georgia project at no extra cost, ready for your engineer’s approval.

Shop drawings, included →

Live production tracking

Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.

PEB Studio tracking →

State code basis

The Georgia State Minimum Standard Codes and any local amendment stated on the first calculation sheet.

Georgia codes guide →

Solution advisor

Pick what you are building. We recommend the steel.

Structural steel for the project types Georgia builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel
Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel

EV and battery plants

Bryan County, Commerce, Stanton Springs and the I-85 corridor

Long-span production halls, crane bays and heavy mezzanines, released building by building so erection can start early.

GPPD Energy factory, Vietnam, steel by World Steel
GPPD Energy factory, Vietnam, steel by World Steel

Data centers

Douglas County, Fayetteville, Covington and the Atlanta ring

Data hall frames, heavy roof equipment framing and phased campus steel, packed per building and phase.

M&D warehouse, Thailand: 2,000 t of World Steel frames during erection
M&D warehouse, Thailand: 2,000 t of World Steel frames during erection

Port and distribution warehouses

Savannah, Pooler, Effingham, the I-16 corridor and South Atlanta

Clear-span or multi-span frames with tall clear heights and long dock walls, designed for coastal wind where it applies.

New Era cold storage, Vietnam: frames going up, steel by World Steel
New Era cold storage, Vietnam: frames going up, steel by World Steel

Poultry, food and cold storage

Gainesville, Northeast Georgia, Savannah and South Georgia

Insulated panel envelopes, galvanized or coated steel for washdown areas and frames sized for refrigeration.

Long-span curved World Steel trusses over a wide hall, Western Australia
Long-span curved World Steel trusses over a wide hall, Western Australia

Studios and soundstages

Metro Atlanta, Fayette and Clayton counties

Long-span, column-free stages with heavy grid and rigging loads, acoustic envelopes and support buildings.

Long Son petrochemical complex, Vietnam: 2,000 t of World Steel structural steel
Long Son petrochemical complex, Vietnam: 2,000 t of World Steel structural steel

Heavy manufacturing

Northwest Georgia, Middle Georgia and the I-75 corridor

Crane-served built-up frames, crane runway beams and equipment platforms for heavy plants.

Six-story World Steel frame with the floor deck in place
Six-story World Steel frame with the floor deck in place

Offices and multi-story

Midtown, Buckhead, Alpharetta and Savannah

Multi-story steel frames with composite floors and braced cores, coordinated with the façade and the energy code.

CPV Food processing factory, Vietnam: 2,500 t of World Steel structural steel
CPV Food processing factory, Vietnam: 2,500 t of World Steel structural steel

Aviation and aerospace

Atlanta, Savannah, Warner Robins and Macon

Hangars and maintenance buildings with wide clear spans, door openings framed for door reactions and support shops.

The Georgia ecosystem

Every product and solution a Georgia project needs, in one place

Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.

Open call · Georgia contractors

Georgia contractors: let’s win the EV, port and data center work together

Battery plants, Savannah port warehouses and Atlanta data centers are the largest steel packages in Georgia. You hold the owner and the site; we hold the engineering, fabrication and supply, with live production you can show your client.

  • EV and battery plants along I-16 and I-85
  • Port of Savannah logistics buildings
  • Atlanta data center campuses

Buying steel from outside the US

Buying structural steel from outside the US? Here is what Georgia buyers check.

The questions Georgia owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.

  • Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
  • An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
  • Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
  • Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
  • Real-time tracking in PEB Studio“How will I know where my order really is?”
  • Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
  • Incoterm and importer of record in writing“Who handles customs and duties?”
  • One English-speaking project manager“Time zones and language will slow everything down.”
  • Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
  • Scope split agreed before you sign“Who is responsible for the design?”
Read every answer
  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

Real World Steel photos

Every Georgia package starts in our plant in Vietnam

Real photos from World Steel: plate intake, edge dressing, beam assembly, weld checks, primed trusses and packing. None is shown as a Georgia site.

Labeled stacks of steel plate under a gantry crane
Raw plate stock waiting in the World Steel yard, Vietnam.
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Fitter grinding a cut steel edge, sparks flying, on the shop floor
Cut edges are dressed before fit-up, World Steel plant in Vietnam.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Gate of the World Steel plant with the office block and two of its fabrication halls
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Worry-free shipping

Steel for your Georgia project, without the shipping worries

Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Questions from Georgia buyers

Georgia questions we hear most

Which code will my Georgia project be designed to?

Georgia’s State Minimum Standard Codes, adopted by the Department of Community Affairs: the International Building Code with Georgia amendments, enforced by your city or county. Some local governments add their own amendments. We confirm the edition with your Engineer of Record, then design the steel with ASCE 7 loads for your site.

Which port do you ship Georgia steel to?

Most often the Port of Savannah, one of the busiest container ports in the US, with rail and interstate links across the state. The Port of Brunswick suits breakbulk and oversize members. We pick the port and the inland route with the shortest haul to your site.

Can you take the steel package of a large Georgia project?

Yes. Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released in erection sequences and shipped as they are fabricated.

Do coastal Georgia sites need special wind design?

Coastal counties such as Chatham, Bryan, Liberty, McIntosh, Glynn and Camden face hurricane wind, and sites close to the shore can fall in wind-borne debris regions. Wind loads come from ASCE 7 for your site, and we carry them through the frame, cladding and openings.

Do you erect the steel in Georgia?

No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.

Talk to an engineer

Send the address. We tell you what Georgia asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, humidity and port questions for your site.

Honest status. World Steel designs and fabricates to the Georgia State Minimum Standard Codes, any local amendment and ASCE 7. We hold no Georgia Department of Community Affairs, city or county approval and no Georgia engineering registration; drawing approval, the PE seal, inspections and the permit are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Building in Georgia?

Send the drawings or the site address, size and use. We set the Georgia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, landed at Savannah and packed in erection order.