New York · Food and dairy
Structural steel for New York food and dairy plants
New York is one of the largest dairy states, with yogurt, cheese and milk plants from Batavia to the North Country, and beverage, snack and produce plants across the Finger Lakes. Food plants need washable steel in the process areas, insulated cold rooms and heavy roof plant, under some of the deepest snow in the East.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of New York and New Jersey for your New York site.
- Clusters
- Batavia, Finger Lakes, North Country
- Process areas
- Washable details
- Cold rooms
- Insulated, thermal breaks
- Snow
- Lake-effect drift
Why it matters
Clean, cold and under snow
In process rooms, ledges and pockets collect product and water, so the steel is detailed to drain and to clean. Cold rooms need insulated panels and thermal breaks where steel passes through the envelope, or frost and condensation follow.
Roof plant for refrigeration and air handling is heavy and sits where drift collects. We raise it on dunnage above the drift and design the roof for the combined load.
What we design and fabricate
Steel for food and dairy plants
Washable details
Sealed and sloped details in wet process areas.
Cold rooms
Insulated panels and thermal breaks at the envelope.
Roof plant
Dunnage for refrigeration and air handling above drift.
Coatings
Galvanizing or epoxy systems for wash-down areas.
Who does what
Food plant steel, split clearly
World Steel supplies
- Process hall frames and roof plant steel
- Insulated envelope and thermal break details
- Coating systems for wet areas
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Food safety design with the owner
- Engineer of Record approval and PE seal
- Local permit and inspections
- Refrigeration and process equipment
- Erection and site work
New York
What we do not claim
World Steel names no food or dairy company as a customer and holds no food safety certification for the buildings it supplies; food safety design is set with the owner.
New York ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New York contractors
New York contractors: let’s win the next project together
If your next bid involves food and dairy plants, World Steel wants to be your long-term, win-win steel partner in New York. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New York project is cut, welded, inspected and packed.
Q&A
What New York buyers ask
Can you detail steel for wash-down areas?
Yes. We detail process area steel to drain and to clean, and specify galvanizing or epoxy coatings.
Do you supply cold room envelopes?
Yes. Insulated metal panels and thermal breaks can come with the frame.
How do you handle snow on roof plant?
We raise equipment on dunnage above the expected drift and design the roof for the combined load.
Official sources: NYS Department of Agriculture and Markets
New York solutions
Every New York guide
Related pages
Code facts on this page summarize New York practice, the NYS Uniform Code, the NYC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the code official or the Department of Buildings confirm the code and edition in force for your project.
Building in New York?
Send the drawings or the site address, size and use. We set the New York design basis with your Engineer of Record, design or detail the steel to the Uniform Code or the NYC codes and your site’s snow and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.