Wisconsin · Dairy and cheese
Structural steel for Wisconsin dairy and cheese plants
Wisconsin makes more cheese than any other state, and its dairy plants also turn out butter, whey and milk powders. A cheese plant has wet process halls that are washed every day, aging rooms and coolers held at tight temperatures, and refrigeration and air handling on the roof, all under Wisconsin snow.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail through Chicago to your Wisconsin site.
- Rank
- Most cheese in the US
- Process
- Wet, washed daily
- Rooms
- Aging rooms and coolers
- Roof
- Plant under heavy snow
Why it matters
Clean steel, cold rooms, heavy roofs
In wash-down areas, ledges and pockets collect product and water, so the steel is detailed to drain and to clean, and coated for daily washing. Aging rooms and coolers need a continuous insulated envelope; wherever steel passes through it without a thermal break, frost and condensation follow. Refrigeration and air handling add heavy platforms, and snow drifts against them.
Our plant built 2,500 t of steel for the CPV Food processing factory in Vietnam. We design or detail process hall frames, cold room steel and thermal breaks, and roof platforms with their drift, and specify galvanizing or epoxy coatings for wet areas.
What we design and fabricate
Steel for dairy and cheese plants
Washable details
Sealed and sloped details in wash-down areas.
Cold and aging rooms
Insulated envelopes and thermal breaks.
Roof plant
Refrigeration platforms designed with their drift.
Coatings
Galvanizing or epoxy for daily washing.
Who does what
Dairy plant steel, split clearly
World Steel supplies
- Process hall, cold room and platform design or detailing
- Thermal break and envelope steel details
- Coating systems for wash-down areas
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Food safety and sanitary design with the owner
- Engineer of Record approval and PE seal
- Plan approval, permit and inspections
- Refrigeration and process equipment
- Erection and site work
Wisconsin
What we do not claim
World Steel names no dairy or cheese company as a customer and holds no food safety or dairy certification for buildings. CPV Food is a project in Vietnam.
Wisconsin ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Wisconsin contractors
Wisconsin contractors: let’s win the next project together
If your next bid involves dairy and cheese plants, World Steel wants to be your long-term, win-win steel partner in Wisconsin. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Wisconsin project is cut, welded, inspected and packed.
Q&A
What Wisconsin buyers ask
Can you detail steel for daily wash-down?
Yes. We detail process steel to drain and to clean, and specify galvanizing or epoxy coatings for daily washing.
Do you detail thermal breaks for aging rooms?
Yes. We detail the steel where it passes through the insulated envelope so the room stays continuous.
Have you built food plants?
Yes. Our plant supplied 2,500 t of steel for the CPV Food processing factory in Vietnam.
Official sources: Wisconsin Department of Agriculture, Trade and Consumer Protection
Wisconsin solutions
Every Wisconsin guide
Related pages
Code facts on this page summarize Wisconsin practice, the Wisconsin Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Wisconsin?
Send the drawings or the site address, size and use. We set the Wisconsin design basis with your Engineer of Record, design or detail the steel to the Wisconsin Commercial Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail through Chicago to your site.