New Mexico · Seismic
Structural steel for Rio Grande rift seismic design
The Rio Grande rift pulls New Mexico apart along the river valley, from Socorro through Albuquerque to Santa Fe and Taos, and gives central New Mexico moderate seismic hazard. Your Engineer of Record sets the site class and Seismic Design Category. We design and fabricate the lateral steel to AISC 341 where it applies.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your New Mexico site.
- Hazard
- Rio Grande rift
- Zone
- Socorro to Taos
- Design
- AISC 341 where it applies
- Welds
- AWS D1.8-qualified
Why it matters
A valley that is still opening
Valley sites on deep basin soils near Albuquerque can land in a higher Seismic Design Category than a site on rock nearby. The category sets which lateral systems are allowed and how they are detailed.
We design or detail braced and moment frames to AISC 341 where they apply, mark protected zones on request and weld demand-critical joints with AWS D1.8-qualified WPS and welders.
What we design and fabricate
Steel for seismic categories
Braced frames
Special concentric and buckling-restrained frame steel.
Moment frames
Prequalified connections under AISC 358 where specified.
Demand-critical welds
Welds made by AWS D1.8-qualified welders with procedures on file.
Anchorage
Base plates and anchor rods for the seismic reactions.
Who does what
Seismic steel, split clearly
World Steel supplies
- Lateral system steel designed or detailed to AISC 341 where it applies
- AWS D1.8-qualified procedures and welders for demand-critical welds
- Protected zones marked on the members on request
- Mill certificates traced by heat, with Charpy results on request
- Tekla shop and erection drawings, included
The US contractor arranges
- Site class and Seismic Design Category by the Engineer of Record
- Engineer of Record approval and PE seal
- Special inspections and the quality assurance plan
- Foundations and anchorage installation
- Erection and site work
New Mexico
What we do not claim
AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no New Mexico engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.
New Mexico ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Mexico contractors
New Mexico contractors: let’s win the next project together
If your next bid involves Rio Grande rift seismic, World Steel wants to be your long-term, win-win steel partner in New Mexico. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Mexico project is cut, welded, inspected and packed.
Q&A
What New Mexico buyers ask
Which New Mexico sites need seismic detailing?
Mostly the Rio Grande valley. Your engineer sets the category from the soils.
Is AISC 341 a certificate?
No. AISC 341 is a design standard. We design and fabricate to it where it applies.
Can you supply Charpy-tested plate?
Yes. Vietnam plate mills can supply EN 10204 3.1 certificates with Charpy results on request.
Official sources: New Mexico Bureau of Geology and Mineral Resources
New Mexico solutions
Every New Mexico guide
Related pages
Code facts on this page summarize New Mexico practice, the New Mexico Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Mexico?
Send the drawings or the site address, size and use. We set the New Mexico design basis with your Engineer of Record, design or detail the steel to the New Mexico Commercial Building Code, Rio Grande seismic rules and altitude snow, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail or truck to your site.