Idaho · Dairy and cold
Structural steel for Idaho dairy, cheese and cold storage buildings
Idaho is one of the top dairy states, with large herds and some of the biggest cheese plants in the country around Twin Falls, Jerome and Gooding. Cheese, milk powder and frozen food all need cold storage. We fabricate the frames, girts and dock steel for those cold buildings.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Seattle, Tacoma or Portland for your Idaho site.
- Hubs
- Twin Falls, Jerome, Gooding
- Plants
- Cheese and milk powder
- Cold rooms
- Thermal breaks
- Docks
- Insulated door framing
Why it matters
Cold rooms in a cold climate
A cheese plant or freezer warehouse has to keep the cold in, the moisture out and the steel dry, through winter snow and frost heave risk under the slab.
We frame the insulated envelope, detail thermal breaks at columns and penetrations, frame the docks and choose coatings for cold, wet rooms.
What we design and fabricate
Steel for cold buildings
Freezer frames
Frames inside or outside the insulated box, as the design sets.
Thermal breaks
Details at columns, girts and penetrations.
Dock framing
Dock doors, canopies and vestibules.
Coatings
Galvanized or duplex systems for cold, wet rooms.
Who does what
Cold storage steel, split clearly
World Steel supplies
- Frames, girts and purlins for the insulated envelope
- Thermal break details at columns and penetrations
- Dock door framing and canopies
- Coating systems chosen for cold, wet rooms
- Tekla shop and erection drawings, included
The US contractor arranges
- Refrigeration design and equipment
- Engineer of Record approval and PE seal
- Insulated panels and vapor barrier
- Heated slab and foundations
- Erection and site work
Idaho
What we do not claim
World Steel names no Idaho cold storage operator as a customer. Refrigeration design and panel installation are your team’s scope.
Idaho ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Idaho contractors
Idaho contractors: let’s win the next project together
If your next bid involves dairy and cold storage, World Steel wants to be your long-term, win-win steel partner in Idaho. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Idaho project is cut, welded, inspected and packed.
Q&A
What Idaho buyers ask
Can frames sit inside the cold box?
Yes, or outside it, as the design sets. We detail both.
Do you supply insulated panels?
Panels can be part of the package; installation is your team’s scope.
Do you design refrigeration?
No. Refrigeration design is your team’s scope.
Official sources: Idaho Dairymen’s Association
Idaho solutions
Every Idaho guide
Related pages
Code facts on this page summarize Idaho practice, the Idaho Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Idaho?
Send the drawings or the site address, size and use. We set the Idaho design basis with your Engineer of Record, design or detail the steel to the Idaho Building Code, its fault zones and mountain snow, and quote it made in our plant in Vietnam, packed in erection order and delivered through Seattle, Tacoma or Portland to your site.