Food processing · Dong Nai Province, Vietnam · 2020
CPV Food Processing Factory
2,500 tabout 2,750 short tons
Steel structure designed, fabricated and supplied by World Steel.
What makes this project type different
In a food or feed plant, the process line comes first and the building follows. Wide clear spans keep the floor free for lines that will be rearranged, roofs carry hung ducts, pipes and conveyors, and the process tower beside the hall carries mixers, bins and elevators on several floors. Warehouses, cold rooms and truck docks are often part of the same contract.
Hygiene changes the details. Owners ask for fewer horizontal ledges, sealed or closed sections where dust and moisture collect, and coatings that stand up to wash-down. We agree those details with your design team before shop drawings start, so they are built in rather than added on site.
Ducts, pipes, conveyors and cable trays hung from the roof steel add loads that must be planned, not guessed.
Multi-level towers carry mixers, bins and bucket elevators, with heavy floor loads and vibration.
Fewer ledges, sloped tops and closed sections where the owner’s food safety plan asks for them.
Chilled and frozen areas need insulated envelopes and steel detailed against condensation.
Raw material and finished goods warehouses and docks are often in the same package.
Clear spans and spare roof capacity let the owner rearrange or add lines without new steel.
Structures and systems
Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.
| Structure | Typical system | What we fabricate |
|---|---|---|
| Process hall | Rigid frames or long-span trusses with hung services | Frames or trusses, purlins, service support steel |
| Process tower | Braced multi-level frame with equipment floors | Columns, floor beams, bracing, stairs and platforms |
| Silo and bin support | Support structures and access steel around silos | Support frames, walkways and access |
| Warehouse and docks | Clear-span frames with dock canopies | Frames, canopies, dock steel |
| Cold rooms | Frames carrying insulated panels | Frames and panel support steel |
Our advice before you bid
Ask your process supplier for hung and floor loads before the steel is sized. Late equipment loads are the usual cause of redesign.
Which areas need sloped tops, closed sections or a wash-down coating, so they are priced and drawn once.
A modest allowance for future hung loads costs little and keeps the plant flexible.
Tower, hall, warehouse and docks can be detailed and shipped in the order the process supplier installs.
Hall, tower, cold rooms and docks in one Tekla model avoid clashes at the interfaces.
World Steel projects of this type
Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.
Food processing · Dong Nai Province, Vietnam · 2020
2,500 tabout 2,750 short tons
Steel structure designed, fabricated and supplied by World Steel.
Animal feed · Dong Thap Province, Vietnam
1,500 tabout 1,650 short tons
Steel structure designed, fabricated and supplied by World Steel.
Real photos
World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.
Inside our factory
How World Steel supports this
Packages up to 2,500 t
Food processing jobs of this size are already in our portfolio.
Shop drawings, included
Hall, tower and docks detailed in one model at no extra charge.
Tracked in PEB Studio
See every structure move through the shop, area by area.
The structural steel ecosystem
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Photo
Photo
Photo
Photo
Photo
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Questions from US contractors
The CPV Food Processing Factory in Dong Nai Province, Vietnam, with about 2,500 metric tons (2,750 short tons) of World Steel structural steel.
Yes. We follow the details your design team and food safety plan require, such as sloped tops, closed sections and wash-down coatings, and show them on the shop drawings.
No. We fabricate the steel structures around and under them: towers, support frames, platforms and access steel.
Yes. One model, one set of shop drawings and one shipping plan for every structure on the site.
Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.
No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.
A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.
Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.