Minnesota · Cold storage
Structural steel for Minnesota cold storage warehouses
Minnesota’s food industry needs freezer and cooler warehouses, clustered around the Twin Cities and the processing plants in the south. In January the outdoors can be colder than the freezer, so the envelope has to keep cold in during summer and keep the building from freezing in winter, without ice and condensation at the steel.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail on the northern route to your Minnesota site.
- Clusters
- Twin Cities and the south
- Rooms
- Freezers and coolers
- Envelope
- Insulated, thermal breaks
- Roof
- Refrigeration plant in snow
Why it matters
An envelope that works both ways
A freezer warehouse is a box of insulated panels on a steel frame. Wherever steel passes through the envelope without a thermal break, frost and condensation follow, and in Minnesota that can happen from either side. Docks need sealed doors and canopies that carry snow, and refrigeration plant sits on the roof or on platforms with its own drift.
Our plant built 1,000 t of steel for the New Era cold storage in Vietnam. We design or detail the frame, thermal breaks, dock steel and refrigeration platforms for the site snow, and release the steel area by area.
What we design and fabricate
Steel for cold storage
Thermal breaks
Steel details that keep the envelope continuous.
Refrigeration platforms
Roof and interior platforms for the plant.
Dock steel
Door framing and canopies for sealed docks.
Tall frames
Frames for high-bay racking and snow.
Who does what
Cold storage steel, split clearly
World Steel supplies
- Frame, platform and dock steel design or detailing
- Thermal break and envelope steel details
- Packages released area by area
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Temperature zones and racking with the owner
- Engineer of Record approval and PE seal
- Permit and inspections
- Refrigeration, floors and under-slab heating
- Erection and site work
Minnesota
What we do not claim
World Steel names no cold storage operator as a customer and claims no completed Minnesota cold store. New Era is a project in Vietnam.
Minnesota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Minnesota contractors
Minnesota contractors: let’s win the next project together
If your next bid involves cold storage, World Steel wants to be your long-term, win-win steel partner in Minnesota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Minnesota project is cut, welded, inspected and packed.
Q&A
What Minnesota buyers ask
Do you detail thermal breaks?
Yes. We detail the steel where it passes through the insulated envelope so the cold room stays continuous.
Can you supply refrigeration platforms?
Yes. Roof and interior platforms for the refrigeration plant, designed with their own snow drift.
Have you built cold storage?
Yes. Our plant supplied 1,000 t of steel for the New Era cold storage in Vietnam, published on our projects page.
Official sources: Minnesota Department of Employment and Economic Development
Minnesota solutions
Every Minnesota guide
Related pages
Code facts on this page summarize Minnesota practice, the Minnesota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Minnesota?
Send the drawings or the site address, size and use. We set the Minnesota design basis with your Engineer of Record, design or detail the steel to the Minnesota State Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail on the northern route to your site.