Vietnam to USA shipping

Order the building. Leave the shipping to us.

Buying from World Steel means the shipping is not your worry. Our logistics team knows the US market, from gateway ports and customs entries to rail ramps and trucking rules, and plans the fastest workable route from our plant in Vietnam to your site around your project schedule.

Made in our own plant in Tay Ninh Province, the first and only fabricator in Vietnam accredited under IAS AC472. Packed in erection order, sealed into containers, shipped to the West Coast, Gulf Coast or East Coast gateway that suits your job, and tracked all the way in PEB Studio.

  • Schedule firstPlanned backward from your site date
  • 3 coastsWest, Gulf and East Coast gateways
  • IAS AC472First and only accredited plant in Vietnam
  • LiveProduction and shipping status in PEB Studio

Worry-free shipping

You order the building. We take care of the shipping.

Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Schedule first

We plan backward from your site date

Each step is booked to meet the one after it. If a date is tight, the quote says what it takes: an earlier production slot, shipping in lots or another gateway.

  1. Your site date
  2. Truck or rail to site
  3. US port and customs
  4. Ocean sailing
  5. Packed in erection order
  6. Production slot
  7. Approved shop drawings

Why Vietnam

One plant, one contract, one record from the mill to your site

Your building comes from a single plant that does the engineering, the fabrication, the inspection and the packing, so nothing is handed between subcontractors before it reaches the port. Members are designed to the US codes your Engineer of Record works with, the steel comes mainly from mills in Vietnam, and the order crosses the Pacific with its records attached.

Our office in Westminster, California handles quotes and coordination for US buyers. The steel itself is made only in Vietnam and shipped straight to the gateway port that suits your job.

  • 2,500 t

    metric tons (about 2,750 short tons) of structural steel the plant can fabricate each month.

  • 20,000 m²

    of plant (about 215,000 sq ft) at Hai Son Industrial Park, with engineering, fabrication, QC and packing under one roof.

  • IAS AC472

    The first and only fabricator in Vietnam accredited under the IAS program for metal building systems.

  • US codes

    IBC 2024, ASCE 7-22 and AISC 360 by default, or the basis your Engineer of Record sets, with drawings ready for that engineer’s review.

  • 100%

    of the materials are produced by mills and factories in Vietnam, matched to their mill certificates and traced to each finished member.

  • 10-point

    cross-checked handover for every container before the ISO 17712 seal goes on the door.

Ocean routes

One plant in Vietnam, three US coastlines

Every container leaves from the container terminals at Cat Lai or Cai Mep, near Ho Chi Minh City. From there the carrier’s service sets the path: straight across the North Pacific to the West Coast, or through the Panama Canal to the Gulf and the East Coast. We pick the gateway with you, based on where the job is and how the steel travels inland.

Map of the Pacific Ocean with World Steel’s shipping lanes from Vietnam to the United States Illustrative lanes run from southern Vietnam across the North Pacific to West Coast ports, and through the Panama Canal to Gulf Coast and East Coast ports. The contiguous United States is drawn in the colors of the American flag. PACIFIC OCEAN Panama Canal Los Angeles–Long Beach Oakland Seattle–Tacoma Houston New Orleans Savannah Charleston Jacksonville Norfolk New York–New Jersey World Steel plant Tay Ninh, Vietnam
Lanes are illustrative. The carrier, the port pair and any transshipment are confirmed when the cargo is booked, and we publish no transit times.

Across the North Pacific

West Coast gateways

The shortest crossing from Vietnam. A natural gateway for California, the Pacific Northwest and the Southwest, and a common starting point for rail service to inland ramps.

  • Los Angeles–Long Beach
  • Oakland
  • Seattle–Tacoma

State guides

CaliforniaWashingtonArizona

Through the Panama Canal

Gulf Coast gateways

Steel discharges close to Texas, Louisiana and the South Central states, so the inland leg by truck or rail stays short for jobs in the Gulf region.

  • Houston
  • New Orleans

State guides

TexasLouisiana

Through the Panama Canal, or Suez on some services

East Coast gateways

Gateways for the Southeast, the Mid-Atlantic and the Northeast, with rail and interstate links that reach a large part of the Midwest.

  • Savannah
  • Charleston
  • Jacksonville
  • Norfolk
  • New York–New Jersey

State guides

GeorgiaFloridaNorth CarolinaOhio

Shipping simulatorWatch a container go from our plant to your US portAbout 2 hours by road to the Vietnamese port, then the sea lane to any of our US gateways, with the Incoterm split at every stage. Run the simulation

The journey

Seven stages from model to job site, and your checkpoints

Each stage shows the work World Steel does, the records PEB Studio gives you, and the moment you can verify, approve or step in. Scroll down to follow your building from Tay Ninh Province to your site.

  1. World Steel engineering, Vietnam

    Engineering

    What we do

    SAP2000 analyzes the building and Tekla Structures details it. Member lengths and splice points are set so the steel fits a container or flat-rack, and the model goes to PEB Studio as IFC, where each member gets its piece mark and QR code.

    You see in PEB Studio

    Approval drawings and documents with revision numbers, and a bill of materials pulled from the model.

    Your control point

    You and your Engineer of Record approve the drawings first. No steel is cut from an unapproved set.

  2. Our plant, Tay Ninh Province

    Fabrication

    Long shop floor of built-up members and overhead cranes at the World Steel plant in Vietnam

    What we do

    Fabricators log each operation by scanning the member’s QR code. The app rejects operations done out of sequence, so no step can be skipped and back-filled.

    You see in PEB Studio

    Progress by stage, a weekly production report and shop photos tied to the members they show.

    Your control point

    Hold progress up against your schedule any time, without waiting for an email update.

  3. Our plant, Tay Ninh Province

    Quality control

    Inspector checking the stiffeners and end plate of a heavy column at World Steel

    What we do

    QC releases every stage on its own; a finished member is not an accepted member until QC says so. Weld reports are checked against the WPS, PQR and welder qualifications, and rejects run through a nonconformance (NCR) process.

    You see in PEB Studio

    Each member’s own quality file: the hold and witness points it passed, its test results and any NCR raised and closed.

    Your control point

    Witness in person at the plant, send a third-party inspector, or join on Zoom or Microsoft Teams with a recording afterward.

  4. Our plant, Tay Ninh Province

    Packing

    Painted steel members strapped into bundles and stacked for an export shipment

    What we do

    Members are scanned into bundles and unknown codes are refused. Each bundle is checked for production, QC and coating status, gets its own packing sub-list, photos and QR code, and loads in erection order.

    You see in PEB Studio

    Packing lists per bundle and per container, in English, with photos.

    Your control point

    Compare any bundle with its list before it ships, and again when your crew opens it in the US.

  5. Cat Lai or Cai Mep, then the Pacific

    Ocean freight

    Rows of labeled steel bundles lined up to leave the World Steel plant

    What we do

    A loading plan checks weight, center of gravity and door clearance. Every container goes through a 10-point cross-checked handover, is secured to the CTU Code, closed with an ISO 17712 seal and photographed and filmed. The container’s weight is verified and declared as SOLAS requires.

    You see in PEB Studio

    The container packing report with seal number, VGM, photos and video, plus export documents and EN 10204 3.1 mill certificates that travel with the cargo.

    Your control point

    Know what is inside every box, how it was braced and which seal number should be on the door.

  6. Your West, Gulf or East Coast gateway

    US port & customs

    What we do

    Cargo sails to the US gateway agreed for your job. Shipping marks follow UN/ECE Recommendation 15 and carry a QR code that opens the electronic dossier.

    You see in PEB Studio

    Booking details, the bill of lading and the document set your customs broker needs to file the entry.

    Your control point

    Your broker or the named importer of record clears the cargo with a complete file. Match the seal number to the packing report before the door is cut.

  7. Your job site, by truck or rail

    Inland delivery & erection

    What we do

    Containers are matched to the erection sequence before they leave the port. Site receiving logs what has arrived, readiness is shown per erection step, and shortages are flagged before the crane is booked.

    You see in PEB Studio

    A 3D model colored by erection status, members found by gridline and elevation, installation inspections and the closeout package.

    Your control point

    Scan any QR tag on site to open that member’s passport, and receive released documents sealed with a SHA-256 fingerprint at closeout.

One named project manager holds the schedule, the document log and the open-issues list across all seven stages, from kickoff to closeout. Our project management approach.

PEB Studio

An overseas order you can audit from your own office

World Steel runs its structural steel jobs on PEB Studio, a web platform built around the Tekla model. It follows each member from raw material through cutting, fabrication, QC, packing, ocean freight, erection and closeout.

Your company gets a login to its own project and sees the records our shop and QC teams use, released step by step. Pay applications, inspections, crane bookings and crew schedules can then be based on documents rather than assurances.

Container 03 of 08 Demonstration data
  1. Fabrication complete
  2. QC released
  3. Packed in erection order
  4. Sealed (ISO 17712)
  5. On board in Vietnam
  6. Discharged at US port
  7. Delivered to site
How a container shows in your PEB Studio project, each status released with its own photos and records.
  • Progress without phone calls

    Weekly production reports, container packing reports and member passports, opened by link or QR code when you want them.

  • Quality you can review

    Hold and witness points, NCRs, welding procedures, welder qualifications and a quality history for every member.

  • Containers you can verify

    English packing lists, UN/ECE shipping marks, VGM, ISO 17712 seals, and photos and video of every container.

  • A smoother delivery week

    Containers matched to the erection sequence, readiness per step, and shortages flagged before the crane shows up.

  • Only your project, nothing else

    Client views carry released documents only: no internal notes, no prices and no other client’s job.

  • Closeout records that stand up

    Released documents sealed with SHA-256 and delivered as a digital closeout package.

PEB Studio screen: container packing report (demonstration data) Demonstration data

Container packing report

Seal number, verified gross mass, loading timeline and a QR link to the online report with photos and video.

PEB Studio screen: client packing list (demonstration data) Demonstration data

Client packing list

Each bundle with contents, dimensions and weights, tied to its container and seal.

PEB Studio screen: member digital passport (demonstration data) Demonstration data

Member digital passport

Scan a tag in the field to see fabrication, shipping and installation status, with no login.

PEB Studio screen: finding a member on site (demonstration data) Demonstration data

Finding a member on site

Find any member by gridline and elevation, colored by erection status.

Screens are from PEB Studio 4.4 with sample data, not a real client job. Features are as of that release.

Risk management

Import risks for a US steel job, and the control for each

Bringing a building across an ocean and then inland carries predictable risks. Here is how our process handles each one and what you can verify on your end.

RiskOur controlYour check
A piece is missing or the wrong one shows upOne piece mark per member, scan-to-pack that refuses unknown codes, packing lists built from the scans.Scan tags while unloading and check them against the packing list.
A defect turns up on siteQC releases each stage, and only members cleared for production, QC and coating can be packed.Open that member’s quality history from its QR code.
Damage at sea or on the roadBundles braced on ISPM 15 dunnage, containers secured to the CTU Code, photos and video of each load.Photograph damage before moving anything; it traces to member, bundle and container.
An overweight or badly loaded containerLoading plan with weight, center of gravity and door-clearance checks, plus verified gross mass under SOLAS.VGM and the loading record appear in the container packing report.
Tampering between the plant and the portISO 17712 seal, photographed when the door is closed, with its number on the report.Confirm the seal number before the container is opened.
A customs hold or missing paperworkA full export document set prepared with the shipment, shipping marks to UN/ECE Rec. 15, importer of record named in the quote.Forward the documents to your customs broker as soon as the booking arrives.
Crane on site, steel still at the portContainers mapped to the erection sequence, readiness per step, shortages flagged ahead of time.Book the crane and crew against the readiness PEB Studio shows.
Records edited after the factAppend-only history for every member; released documents sealed with SHA-256.Check what you received at closeout against the released version.
Project data seen by the wrong peopleServer-side permissions by project and role; client views carry released documents only, with no internal notes or prices.Agree with your project manager who on your side gets access.

Incoterms® 2020

Freight, duties and risk: who handles what on a US delivery

Each contract names one Incoterm and one importer of record. Paying for a leg is not the same as carrying its risk, so check the last column before you buy cargo insurance.

TermWorld Steel handlesYou, your broker or trucker handleRisk transfers to you
FOB
Cat Lai / Cai Mep
Export crating, loading on board, Vietnam export clearanceOcean freight, cargo insurance, US customs entry as importer of record, any duties, terminal charges, inland truck or railOnce the goods are on board in Vietnam
CFR
named US port
Everything under FOB, plus ocean freight to the US portCargo insurance, customs entry, any duties, terminal charges, inland deliveryOn board in Vietnam, even though we pay the freight
CIF
named US port
Everything under CFR, plus minimum Incoterms cargo cover (Institute Cargo Clauses C)Broader insurance if wanted, customs entry, any duties, terminal charges, inland deliveryOn board in Vietnam; the policy pays out to you
DAP
named US place
Carriage to the named place in the US, ready to unloadCustoms entry as importer of record, any duties, unloadingOn arrival at the US place named, still on the truck
DDP
to confirm per quote
Only where a quote offers it: carriage, customs entry and duties to the named place, with the importer of record named in the quoteUnloading and anything the quote excludesOn arrival at the US place named, still on the truck

On your US job site

Receiving the containers at your site

  1. Compare the seal on every container with its packing report before cutting the seal.
  2. Unload in the erection order PEB Studio shows, so the first members your erector needs come off first.
  3. Scan bundle and member QR tags during unloading; site receiving logs every arrival.
  4. Photograph shortages or damage where they sit and send them to your project manager that day.
  5. Keep bundles off the ground on blocking, keep coated steel and panels dry and ventilated, and open only what the crew will set next.

Documents

The paperwork your broker and site receive

  • ✓ Commercial invoice for customs entry
  • ✓ Bill of lading
  • ✓ Certificate of origin
  • ✓ Packing list per container and bundle
  • ✓ Container packing report with VGM
  • ✓ EN 10204 3.1 mill certificates
  • ✓ Seal, loading photos and video
  • ✓ Shipping marks with a QR link to the e-dossier

Questions from US buyers

Ports, customs and tracking questions

Do I have to arrange the shipping myself?

No, unless you want to. Under CFR, CIF, DAP or a DDP quote, World Steel books the ocean leg and, where the term includes it, the delivery inland. If you prefer your own forwarder under FOB, our team still plans the packing, loading order and documents around your schedule and works directly with your forwarder, customs broker and trucker, so nothing falls between the parties.

Can you meet a tight project schedule?

Tell us the date your site needs steel when you ask for a quote. We plan backward from that date to the production slot, the packing order, the sailing, the gateway port and the inland leg, and choose the fastest workable combination for your address. If the date is tight, the quote says what it takes to meet it, such as an earlier production slot, shipping in lots that follow the erection sequence or a different gateway. Sailings are confirmed at booking, so we do not publish fixed transit times.

How long does ocean freight from Vietnam to a US port take?

It varies with the carrier, the port pair, transshipment and the season, so we do not publish a figure. The sailing is confirmed when the cargo is booked, your project manager forwards the booking, and PEB Studio shows which bundles are already loaded and sealed.

Which US ports can you ship to?

Any major container gateway the carriers serve from Cat Lai or Cai Mep. Typical choices are Los Angeles–Long Beach, Oakland or Seattle–Tacoma on the West Coast, Houston or New Orleans on the Gulf, and Savannah, Charleston, Norfolk or New York–New Jersey on the East Coast. We pick the port with you based on where the job is and how the steel moves inland. Each port has its own page under US ports.

Who is the importer of record?

It depends on the Incoterm agreed in your contract. Under FOB, CFR or CIF, the buyer or the buyer’s nominee is normally the importer of record and files the customs entry through a licensed customs broker. If a DDP arrangement is offered, the quote names who acts as importer of record. Either way, the quote says it in writing.

Are there US duties on imported steel?

Imported steel can be subject to US duties, for example under Section 232, and the rules change from time to time. We do not publish rates. Each quote states the Incoterm and which party carries any duties, and your customs broker confirms the classification at entry. Federal projects can restrict foreign steel, so federal buyers should check with their contracting officer first.

At what point does the cargo become my risk?

Your contract’s Incoterm settles that. Under FOB, CFR and CIF, risk transfers once the goods are on board in Vietnam, even when World Steel pays the ocean freight. Under DAP or DDP it transfers at the named place in the US. Arrange cargo insurance to match.

How does the steel get from the port to my job site?

By truck or by rail, coordinated with you. Containers can be drayed straight to site, transloaded onto flatbeds, or railed to an inland ramp. We plan bundle lengths and weights so they suit US road limits, and the delivery leg is arranged by your trucker or included in the Incoterm if the quote says so.

What if a piece is short or damaged on arrival?

Photograph it before anything is moved and send it to your project manager. Each member has its own piece mark and QR code, so it can be traced back to its bundle, container and inspection records, and the replacement is tracked until it is closed out.

Does my crew need a login to look up a member?

No. Scanning the QR tag on a member opens a read-only digital passport on any phone, with its fabrication and shipping data. The full project view, with documents and progress, sits behind your PEB Studio login.

Do you have a US office or yard?

World Steel has a US office at 7302 Emerson Ave, Westminster, CA 92683, but no US yard: steel ships from Vietnam straight to the port that suits your site. Your project is managed from Vietnam by a dedicated project manager through video calls, email and PEB Studio, with site supervision or remote support when the contract includes it. Calls are scheduled at times that work for your US time zone.

Where your steel lands

US ports we ship to

All US ports
Full detail: export packing & shippingISPM 15 wood packagingISF filing (10+2)QC you can witness live

Price the frame and the freight in one quote

Send drawings, a sketch or just the footprint, your site address and the date your site needs steel. You get a technical review, a scope of supply, the shipping plan we suggest for your schedule and the Incoterm and importer-of-record options.