
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Georgia · Savannah and the ports
From our plant in Vietnam to the Port of Savannah
The Port of Savannah is one of the busiest container gateways in the US, and much of Georgia’s new industrial space sits within a day’s drive of it. The Port of Brunswick handles roll-on and breakbulk cargo. We plan each package to the Georgia port and inland route that bring it closest to your site.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and landed at a Georgia port.
- Gateway
- Port of Savannah, Port of Brunswick
- Inland
- I-16, I-95, I-75 and rail
- Packing
- Erection order, labeled bundles
- Tracking
- Every bundle in PEB Studio
Gateways and routes
The port and the lane closest to your site
Port of Savannah
Container terminals on the Savannah River with on-terminal rail, close to the I-16 and I-95 logistics parks.
Port page →Port of Charleston
An alternative for sites in Northeast Georgia and the Carolinas border region.
Port page →Port of Brunswick
Roll-on and breakbulk terminals on the Georgia coast, for oversize members and project cargo.
Truck and rail inland
I-16 to Macon and Atlanta, I-95 along the coast, and rail to inland ports and plants across the state.
Planned for the run inland
Packing for Georgia delivery
Erection-order bundles
Bundles packed and labeled by sequence, so each truck brings the next pieces the crew needs.
Container or breakbulk
Container loading for most members, breakbulk through Savannah or Brunswick for oversize pieces.
Road-legal lengths
Members spliced where the design allows so standard trucks can carry them inland.
Tracked to the port
Bundle lists and loading photos in PEB Studio, from the plant to the port of discharge.
What we do not publish
No transit times, freight rates or duty rates. Sailings and inland transport are confirmed when the cargo is booked, and each quote names the port of discharge, the Incoterm and the importer of record.
Georgia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Georgia contractors
Georgia contractors: let’s win the next project together
If your next bid involves Savannah and the ports, World Steel wants to be your long-term, win-win steel partner in Georgia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Georgia project is cut, welded, inspected and packed.
Q&A
What Georgia buyers ask
Is Savannah always the best port for Georgia?
Usually, for most of the state. For sites near the South Carolina line or in Northeast Georgia, Charleston can be close; for oversize cargo, Brunswick can suit. We compare them for your package.
Can you deliver to the site?
Yes, under the Incoterm you choose. With a delivered term we arrange the inland leg; with a port term your contractor or forwarder takes over at the port.
How are long members shipped?
Members are spliced where the design allows so they fit containers and standard trucks. Oversize members travel as breakbulk with the right permits.
Official sources: Georgia Ports Authority
Georgia solutions
Every Georgia guide
Related pages
Code facts on this page summarize Georgia rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Georgia?
Send the drawings or the site address, size and use. We set the Georgia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, landed at Savannah and packed in erection order.