Missouri · Auto
Structural steel for Missouri auto and supplier plants
Missouri builds vehicles at large assembly plants near Kansas City and in Wentzville west of St. Louis, and supplier plants along I-70 and I-44 feed them parts. These are long, tall buildings with cranes, stiff mezzanines and heavy roof plant, and they grow in phases as programs change.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port and rail to your Missouri site.
- Clusters
- Claycomo, Wentzville, I-70
- Buildings
- Assembly and supplier plants
- Key need
- Cranes, spans, expansion
- Our part
- Frames, runways, platforms
Why it matters
Built for the line, and the next line
Supplier plants are designed around one program and then changed for the next. Long clear spans, crane runways sized with room to spare and end walls planned for expansion keep that change cheap.
We design the frame and crane runways for the crane class your plant specifies, check drift for the crane and plan the end wall so the building can grow without taking down the existing frames.
What we design and fabricate
Steel for auto plants
Long spans
Clear spans for flexible line layouts.
Crane runways
Runway beams and crane columns to the crane class.
Mezzanines
Stiff platforms for equipment and conveyors.
Expansion
End walls planned to extend the building.
Who does what
Plant steel, split clearly
World Steel supplies
- Frame, crane runway and platform design or detailing
- Crane drift and fatigue checks to the stated crane class
- Built-up members for heavy crane bays
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process layout and crane installation
- Engineer of Record approval and PE seal
- Local permit and inspections
- Foundations and slabs
- Erection and site work
Missouri
What we do not claim
World Steel names no automaker or supplier as a customer and claims no completed Missouri plant.
Missouri ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Missouri contractors
Missouri contractors: let’s win the next project together
If your next bid involves auto and supplier plants, World Steel wants to be your long-term, win-win steel partner in Missouri. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Missouri project is cut, welded, inspected and packed.
Q&A
What Missouri buyers ask
Can you design crane runways?
Yes. Runway beams, crane columns and brackets are designed for the crane class, capacity and duty your plant specifies.
Can a plant be extended later?
Yes. We plan end walls and connections so the building can be extended without removing the existing frames.
Do you supply mezzanines and platforms?
Yes. Mezzanines, equipment platforms, stairs and handrails can come in the same package.
Official sources: Missouri Department of Economic Development
Missouri solutions
Every Missouri guide
Related pages
Code facts on this page summarize Missouri practice, local IBC adoption, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Missouri?
Send the drawings or the site address, size and use. We set the Missouri design basis with your Engineer of Record, design or detail the steel to your local code and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.