Heavy industrial plants: crane bays and heavy frames, by the thousand tons

A heavy plant is designed from the inside out. The cranes, furnaces, presses and conveyors set the bay widths, the hook heights and the loads, and the steel frame is sized around them. These are the largest packages we fabricate, up to 5,000 metric tons on one job.

Largest job
Sunpro Steel Factory, about 5,000 t
Typical frame
Built-up columns, rafters or trusses, runway girders
Designed to
AISC 360, AISC Design Guide 7, ASCE 7-22
Sunpro Steel Factory, structural steel by World Steel World Steel reference 5,000 t of structural steel Sunpro Steel Factory Steel industry · Can Tho City, Vietnam · 2024
Heavy industrial plants at a glanceTypical ranges · not design values
Typical spans
24 to 45 m (80 to 150 ft) per bay, often in several parallel bays
Heights
Crane hook heights of 9 to 20 m (30 to 65 ft) and more
Structural systems
Built-up or stepped columns, rafters or roof trusses, braced crane bays
Loads that size the steel
Crane wheel loads and lateral forces, fatigue, equipment and process loads
Codes and standards
AISC 360, AISC Design Guide 7, CMAA 70 or 74 crane data, ASCE 7-22
Coating and exposure
Industrial interior, heat and dust; zinc-rich or epoxy systems where specified

What makes this project type different

What sizes the steel in heavy industrial plants

In a steel mill, a fabrication shop or a heavy assembly plant, the crane is the client. Its capacity, span, duty class and wheel loads decide the runway girder, the column shape and the bracing in the crane bays. Fatigue governs details that a warehouse never has to think about, and deflection limits are set by how the crane runs, not by how the roof looks.

That is why heavy plants are where a fabricator’s own beam lines matter. Deep built-up columns and girders are cut, fitted and submerged-arc welded from plate in our plant, sized for the crane rather than chosen from the nearest rolled section, and checked against the crane maker’s data before the shop drawings are released.

Crane capacity and duty

Capacity, span, speed and the CMAA service class set wheel loads, impact and the number of fatigue cycles the runway must carry.

Hook height and clearances

The hook height and the crane envelope fix the column height, the bracket level and the roof line.

Fatigue details

Runway girders, stiffeners and their welds are detailed for repeated loading, with weld categories shown on the drawings.

Process and equipment loads

Furnaces, presses, conveyors and hung services add point loads and vibration that the frame must take.

Lateral loads in tall bays

Wind and seismic forces on tall open bays, plus crane lateral and longitudinal forces, are resisted by braced bays.

Future expansion

Gable frames designed for a future bay and spare runway capacity cost little now and save a shutdown later.

Structures and systems

The structures in a typical package, and what we fabricate

Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.

Typical structures and systems for Heavy industrial plants
StructureTypical systemWhat we fabricate
Crane baysStepped or built-up columns with crane brackets, braced longitudinallyBuilt-up columns, brackets, bracing, base plates
RunwayBuilt-up or rolled runway girders with cap channels and stopsRunway girders, stops, rail clips layout, surge members
RoofBuilt-up rafters, or roof trusses over the widest baysRafters, trusses, purlins and bracing
Process steelEquipment platforms, mezzanines and accessPlatforms, stairs, handrails, machinery support frames
AncillaryOffices, motor control rooms and dock canopiesSecondary frames and canopies in the same model

Our advice before you bid

Decisions that save steel, time and rework

  • Get the crane data before the frame is designed

    Wheel loads, spacing, rail size and service class from the crane supplier, in writing. Assumed crane data is the most common cause of runway redesign.

  • Agree deflection and tolerance limits

    Runway tolerances follow AISC Design Guide 7 and the crane maker. Put them on the drawings so the fabricator and erector work to the same numbers.

  • Let built-up sections compete

    Plate girders and built-up columns can save weight against heavy rolled sections, and they are made on our own lines.

  • Plan the next bay now

    A gable designed as a future interior frame and an extendable runway avoid cutting steel in a working plant.

  • Show fatigue categories on the drawings

    The welds that carry crane cycles must be identified, inspected and recorded as such.

World Steel projects of this type

Built by World Steel, from our own plant

Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.

Steel industry · Can Tho City, Vietnam · 2024

Sunpro Steel Factory

5,000 tabout 5,500 short tons

Steel structure designed, fabricated and supplied by World Steel.

Factory · Quang Ngai Province, Vietnam · 2019

Hoa Phat Factory Project

Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.

Inside our factory
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Welder beside a deep built-up girder running through the automatic line Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Our own beam lines

Built-up columns and girders cut, fitted and submerged-arc welded from plate in our plant.

2,500 t a month

Room for a heavy plant package without queuing behind other work.

Witnessed hold points

Your inspector can witness runway and fatigue weld inspections remotely or at the plant.

The structural steel ecosystem

Products and solutions behind this guide

The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.

The industry behind this guide

World Steel projects of this type

Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US contractors

Heavy industrial plants: questions we hear

Can World Steel fabricate crane runway girders?

Yes. Runway girders, crane brackets, stops and surge members are fabricated in the same model as the frame, to the crane data your crane supplier provides.

How large a heavy industrial job have you delivered?

The Sunpro Steel Factory in Vietnam used about 5,000 metric tons (5,500 short tons) of World Steel structural steel, designed, fabricated and supplied by us.

Do you supply the overhead cranes?

No. We design and fabricate the steel that carries them. The crane itself comes from the crane supplier your team selects.

Who checks the runway alignment on site?

The erector and the crane installer, as part of the US contractor’s scope. We fabricate to the tolerances on the approved drawings.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.

Does World Steel erect the steel?

No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.

A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.

Bidding heavy industrial plants?

Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.