Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Maine · Snow

Structural steel for Maine heavy snow loads

Maine ground snow loads are among the higher values in the lower 48 states, rising from the coast inland and to the north, where Aroostook County sees long, deep winters. Drift and sliding snow add more at roof steps. We take snow for each address and size the roof steel for it.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Portland, Boston or New York for your Maine site.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Inland
High ground snow
North
Deepest winters
Check
Drift and sliding
Frost
Deep footings

Why it matters

Months of snow on the roof

A warehouse in Auburn or a potato plant in Presque Isle carries snow for months, and long roofs beside taller parts collect deep drift. Snow sliding off a high roof lands on whatever is below.

We size purlins, rafters and frames for the site snow, drift and sliding snow, detail thermal breaks for heated buildings and give your foundation engineer reactions for frost-depth footings.

What we design and fabricate

Steel for heavy snow

Purlins for drift

Z purlins lapped and sized where drift collects.

Rafters and trusses

Built-up rafters and trusses for heavy snow over long spans.

Thermal breaks

Details that keep cold out of heated and frozen spaces.

Base reactions

Clear reactions for footings set below the frost line.

Who does what

Snow and frost, split clearly

World Steel supplies

  • Roof steel designed for snow and drift to ASCE 7
  • Drift checks at steps, parapets and rooftop units
  • Thermal break details at the envelope
  • Base reactions for the foundation design
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Ground snow and exposure with the Engineer of Record
  • Engineer of Record approval and PE seal
  • Frost depth and footing design
  • Cold-weather concrete and site work
  • Erection and site work

Maine

What we do not claim

World Steel does not design foundations. Frost depth and footing design are your foundation engineer’s scope; we provide the base reactions they need.

Maine ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Maine contractors

Maine contractors: let’s win the next project together

If your next bid involves heavy snow, World Steel wants to be your long-term, win-win steel partner in Maine. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Maine project is cut, welded, inspected and packed.

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.
Inspector walking a line of painted built-up members on the shop floor
Final look at coated members before they are released to packing, World Steel plant in Vietnam.

Q&A

What Maine buyers ask

Is snow taken for each town?

Yes. Ground snow is taken for the site from ASCE 7 and state data.

Do you check sliding snow?

Yes. Sliding snow and drift are checked at lower roofs and steps.

Do you design the footings?

No. Your foundation engineer designs them; we provide the reactions.

Official sources: ASCE 7 Hazard Tool

Building in Maine?

Send the drawings or the site address, size and use. We set the Maine design basis with your Engineer of Record, design or detail the steel to MUBEC, heavy snow and salt air, and quote it made in our plant in Vietnam, packed in erection order and delivered through Portland, Boston or New York for the truck to your site.