Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Alaska · Snow and cold

Structural steel for Alaska snow and cold

Alaska ground snow ranges from heavy wet snow in Valdez and the coastal mountains to lighter but long-lasting snow in the Interior, where winter temperatures fall far below freezing. Heated shops and warehouses must keep the cold out. We design the steel for the snow, drift and cold of each site.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by sea through Tacoma to Anchorage for your Alaska site.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Snow
Varies coast to Interior
Cold
Far below freezing
Envelope
Thermal breaks
Steel
Toughness on request

Why it matters

Snow, drift and cold steel

A heated shop in Fairbanks needs an envelope with thermal breaks at every girt and column, while a warehouse in Valdez carries some of the heaviest ground snow in the country. Drift and sliding snow at roof steps add more.

We size purlins, rafters and frames for the site snow and drift, detail thermal breaks, specify steel toughness for low temperatures where your engineer requires it and give your foundation engineer the base reactions.

What we design and fabricate

Steel for heavy snow

Purlins for drift

Z purlins lapped and sized where drift collects.

Rafters and trusses

Built-up rafters and trusses for heavy snow over long spans.

Thermal breaks

Details that keep cold out of heated and frozen spaces.

Base reactions

Clear reactions for footings set below the frost line.

Who does what

Snow and frost, split clearly

World Steel supplies

  • Roof steel designed for snow and drift to ASCE 7
  • Drift checks at steps, parapets and rooftop units
  • Thermal break details at the envelope
  • Base reactions for the foundation design
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Ground snow and exposure with the Engineer of Record
  • Engineer of Record approval and PE seal
  • Frost depth and footing design
  • Cold-weather concrete and site work
  • Erection and site work

Alaska

What we do not claim

World Steel does not design foundations. Frost depth and footing design are your foundation engineer’s scope; we provide the base reactions they need.

Alaska ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Alaska contractors

Alaska contractors: let’s win the next project together

If your next bid involves snow and deep cold, World Steel wants to be your long-term, win-win steel partner in Alaska. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Alaska project is cut, welded, inspected and packed.

Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Two welders operating a submerged-arc welding station on a member
Submerged-arc welding of web-to-flange seams in the Vietnam plant.

Q&A

What Alaska buyers ask

Can you supply steel for very low temperatures?

Yes. We specify toughness and Charpy testing where your engineer requires it.

Do you detail thermal breaks?

Yes. Thermal breaks at girts, columns and penetrations are part of the package.

Do you design foundations on permafrost?

No. Your geotechnical and foundation engineers design them; we provide the reactions.

Official sources: ASCE 7 Hazard Tool

Alaska solutions

Every Alaska guide

Related pages

Code facts on this page summarize Alaska practice, the IBC as adopted for your Alaska site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Alaska?

Send the drawings or the site address, size and use. We set the Alaska design basis with your Engineer of Record, design or detail the steel for great-earthquake seismic, heavy snow and deep cold, and quote it made in our plant in Vietnam, packed by bay in erection order and shipped by sea through Tacoma to Anchorage.