Kentucky · Auto
Structural steel for Kentucky auto assembly and supplier plants
Kentucky is one of the largest vehicle-building states, with big assembly plants in Georgetown, Louisville and Bowling Green and hundreds of supplier plants on I-65 and I-75. These are long, tall buildings with cranes, stiff mezzanines and heavy roof plant, and they change with every new model program.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port, rail and truck to your Kentucky site.
- Clusters
- Georgetown, Louisville, Bowling Green
- Buildings
- Assembly and supplier plants
- Key need
- Cranes, spans, expansion
- Our part
- Frames, runways, platforms
Why it matters
Built for the line, and the next line
Supplier plants are designed around one program and then changed for the next. Long clear spans, crane runways sized with room to spare and end walls planned for expansion keep that change cheap.
We design the frame and crane runways for the crane class your plant specifies, check drift for the crane and plan the end wall so the building can grow without taking down the existing frames.
What we design and fabricate
Steel for auto plants
Long spans
Clear spans for flexible line layouts.
Crane runways
Runway beams and crane columns to the crane class.
Mezzanines
Stiff platforms for equipment and conveyors.
Expansion
End walls planned to extend the building.
Who does what
Plant steel, split clearly
World Steel supplies
- Frame, crane runway and platform design or detailing
- Crane drift and fatigue checks to the stated crane class
- Built-up members for heavy crane bays
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process layout and crane installation
- Engineer of Record approval and PE seal
- Plan review, permit and inspections
- Foundations and slabs
- Erection and site work
Kentucky
What we do not claim
World Steel names no automaker or supplier as a customer and claims no completed Kentucky plant.
Kentucky ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Kentucky contractors
Kentucky contractors: let’s win the next project together
If your next bid involves auto assembly plants, World Steel wants to be your long-term, win-win steel partner in Kentucky. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Kentucky project is cut, welded, inspected and packed.
Q&A
What Kentucky buyers ask
Can you design crane runways?
Yes. Runway beams, crane columns and brackets are designed for the crane class, capacity and duty your plant specifies.
Can a plant be extended later?
Yes. We plan end walls and connections so the building can be extended without removing the existing frames.
Do you supply mezzanines and platforms?
Yes. Mezzanines, equipment platforms, stairs and handrails can come in the same package.
Official sources: Kentucky Cabinet for Economic Development
Kentucky solutions
Every Kentucky guide
Related pages
Code facts on this page summarize Kentucky practice, the Kentucky Building Code, state plan review, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the reviewing authority confirm the code and edition in force for your project.
Building in Kentucky?
Send the drawings or the site address, size and use. We set the Kentucky design basis with your Engineer of Record, design or detail the steel ready for plan review and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.