Which code will my Tennessee project be designed to?
+
The State Fire Marshal’s Office adopts the International Building Code for most of Tennessee, while exempt jurisdictions such as Memphis, Nashville and Knoxville enforce the editions they adopt themselves. We confirm the edition and local amendments with your Engineer of Record, then design the steel with ASCE 7 loads for your site.
Does the New Madrid seismic zone affect my project?
+
Often, in West Tennessee. Sites near Memphis can fall in high Seismic Design Categories, depending on the soils. That changes the bracing, the connections and sometimes the welding. We design the steel to the category your Engineer of Record sets, with AISC 341 detailing where it applies.
Can you take the steel package of a large Tennessee project?
+
Yes. Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released in erection sequences and shipped as they are fabricated.
How does steel reach a Tennessee site?
+
It sails from Vietnam to Savannah or Charleston and continues by truck or rail, or comes through a West Coast port by rail to Memphis. Members are cut to road limits and bundles are packed in erection order.
Do you erect the steel in Tennessee?
+
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Are shop drawings included?
+
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.