Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Idaho · Building code

Structural steel and the Idaho Building Code

Idaho adopts the IBC statewide with state amendments through the Division of Occupational and Professional Licenses. Many cities and counties enforce the code themselves; where they do not, the state does. We confirm the edition and reviewing office for your site before we model.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Seattle, Tacoma or Portland for your Idaho site.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Statewide code
IBC with amendments
Administered by
DOPL
Enforced by
Local or state
Our part
Code stated on sheet one

Why it matters

One code, two review paths

A plant in Boise is reviewed by the city, while a storage building in a rural county may be reviewed by the state. Seismic and snow values change sharply between the Snake River Plain and the mountain towns.

We confirm the edition and reviewing office with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.

Design basis

What the steel design states

The items we confirm with your Engineer of Record before modeling.

ItemWhat we state
CodeThe Idaho Building Code edition, state amendments and the reviewing office
WindASCE 7 wind speed, exposure and risk category
SnowGround snow, drift and the roof shape
SeismicSite class and Seismic Design Category
EnvelopeGirt and purlin details for the adopted energy code

Who does what

Code work, split clearly

World Steel supplies

  • Steel design or detailing to the stated code basis
  • Calculations and drawings for plan review
  • Answers to reviewer comments on the steel
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • The permit application
  • Engineer of Record approval and PE seal
  • Geotechnical report and site class
  • Special inspections and local inspections
  • Foundations and erection

Idaho

What we do not claim

World Steel holds no Idaho approval and no Idaho engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.

Idaho ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Idaho contractors

Idaho contractors: let’s win the next project together

If your next bid involves Idaho building code, World Steel wants to be your long-term, win-win steel partner in Idaho. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Idaho project is cut, welded, inspected and packed.

Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Two welders operating a submerged-arc welding station on a member
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.

Q&A

What Idaho buyers ask

Is the Idaho code statewide?

Yes. The IBC is adopted statewide with state amendments.

Who reviews my plans?

The city or county where it enforces the code, otherwise the state. We confirm it early.

Can you answer plan review comments?

Yes. We answer comments on the steel and revise drawings through your Engineer of Record.

Official sources: Idaho Division of Occupational and Professional Licenses

Building in Idaho?

Send the drawings or the site address, size and use. We set the Idaho design basis with your Engineer of Record, design or detail the steel to the Idaho Building Code, its fault zones and mountain snow, and quote it made in our plant in Vietnam, packed in erection order and delivered through Seattle, Tacoma or Portland to your site.