Illinois · Rail hub
From our plant to your Illinois site through the Chicago rail hub
Chicago is where the country’s major railroads meet. Containers from Asia land at Los Angeles–Long Beach or Seattle–Tacoma and ride intermodal trains to yards in Joliet, Elwood and Chicago, a short truck trip from most Illinois sites. Steel packed in our plant follows the same route.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Illinois site by rail through the Chicago hub.
- Gateways
- LA–Long Beach, Seattle–Tacoma
- Inland yards
- Joliet, Elwood, Chicago
- Packing
- Erection order, listed
- Our part
- Plant to port, tracked
Why it matters
An inland site with a coastal supply chain
Illinois has no ocean port for container ships, but it has the next best thing: rail yards that receive containers from both coasts every day. That makes steel from Vietnam as practical for a Joliet warehouse as for a site near the coast.
We pack and list every container by erection area, so containers released from the rail yard match the next step of your crane plan. You follow packing and loading in PEB Studio.
The route
Gateways and rail for Illinois sites
Rail yard to site
Truck from Joliet, Elwood or Chicago, delivered in erection order.
Who does what
Logistics, split clearly
World Steel supplies
- Packing and labelling by erection area
- Packing lists per container
- Loading at the plant, tracked in PEB Studio
- Shipping documents for the agreed Incoterm
- Erection drawings and piece marks
The US contractor arranges
- Import clearance as agreed in the contract
- Drayage from the rail yard to site
- Unloading, laydown and erection
- Site access and permits
- Storage on site
Illinois
Illinois ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Illinois contractors
Illinois contractors: let’s win the next project together
If your next bid involves rail hub logistics, World Steel wants to be your long-term, win-win steel partner in Illinois. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Illinois project is cut, welded, inspected and packed.
Q&A
What Illinois buyers ask
Can steel go by rail to Chicago?
Yes. Containers move by intermodal rail from West Coast ports to the Chicago area yards, then by truck.
What about oversize pieces?
Long or heavy members that do not fit containers travel as breakbulk or on flat racks. We plan them with you early.
Who handles customs?
It depends on the Incoterm in the contract. We explain the options before you order.
Official sources: CenterPoint Intermodal Center
Illinois solutions
Every Illinois guide
Related pages
Code facts on this page summarize Illinois practice, local code adoption, the Chicago Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the code and edition in force for your permit.
Building in Illinois?
Send the drawings or the site address, size and use. We set the Illinois design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the rail trip to your site.