Michigan · Food and cold storage
Structural steel for Michigan food plants and cold storage
Michigan grows more kinds of crops than almost any state, and West Michigan’s fruit belt, dairy farms and food plants need packing halls, process buildings and freezer warehouses. Cold rooms inside, deep winters outside and heavy snow on top all shape the steel.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port and rail to your Michigan site.
Spec plateFood and cold storage
- Buildings
- Process, packing, freezer
- Region
- West and Southwest Michigan
- Key issue
- Cold and condensation
- Our part
- Steel with thermal details
Why it matters
Keep the cold in and the frame dry
In a freezer warehouse the steel frame sits between a deep-frozen room and a Michigan winter. Every place steel crosses the insulated envelope can become a cold bridge that frosts, drips or corrodes.
We detail the frame with your envelope designer: thermal breaks at supports, vapor control at the panel joints and condensation details at doors and docks. The roof is sized for the site snow, including drift from higher roofs.
What we design and fabricate
Steel for food and cold storage
Thermal breaks
Supports detailed to stop cold bridges.
Condensation control
Details at doors, docks and panel joints.
Washable coatings
Coating systems for wash-down areas.
Snow-rated roofs
Frames and purlins for site snow.
Who does what
Cold storage steel, split clearly
World Steel supplies
- Frame and roof steel design or detailing
- Thermal break and condensation details
- Insulated panels and accessories on request
- Coating systems for the exposure
- Tekla shop and erection drawings, included
The US contractor arranges
- Refrigeration and process equipment
- Insulated floors and foundations
- Engineer of Record approval and PE seal
- Food safety and permit approvals
- Erection and site work
Michigan ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Michigan contractors
Michigan contractors: let’s win the next project together
If your next bid involves food and cold storage, World Steel wants to be your long-term, win-win steel partner in Michigan. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Michigan project is cut, welded, inspected and packed.
Q&A
What Michigan buyers ask
Can you supply the insulated panels too?
Yes, on request. We can supply insulated metal panels with the steel, detailed with the frame.
Do you design the refrigeration?
No. The refrigeration system is designed by specialists. We supply the steel and the supports it needs.
Can you supply farm buildings?
Yes. Agricultural buildings and packing sheds are standard packages, with roofs rated for the site snow.
Official sources: Michigan Department of Agriculture and Rural Development
Michigan solutions
Every Michigan guide
Related pages
Code facts on this page summarize Michigan practice, the Michigan Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the code and edition in force for your permit.
Building in Michigan?
Send the drawings or the site address, size and use. We set the Michigan design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the port and rail trip to your site.