Structural steel for Wisconsin snow and frost

Wisconsin winters are long. Ground snow rises from the Illinois line to the North Woods and the Lake Superior shore, where lake-effect storms add more. Frost goes deep everywhere, so foundations and anchor rods sit well below grade. On large plant and warehouse roofs, drift often decides the steel.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail through Chicago to your Wisconsin site.

Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Snow
Rises to the north
Lake effect
Near Lake Superior
Frost
Deep, statewide
Governs
Drift and anchorage

Why it matters

Heavy roofs and deep footings

Snow piles up against parapets, roof steps, rooftop units and the walls of taller buildings next door. Unbalanced and sliding snow load one side of a roof more than the other. On a cheese plant or paper mill with many roof levels, drift can double the load in places.

We calculate snow and drift for the site to ASCE 7, size purlins and frames to match, and design base plates and anchor rods for the foundation depth your engineer sets below the frost line.

What we design and fabricate

Steel for snow and frost

Drift-zone purlins

Purlins sized for drift at each obstruction.

Frames

Rigid frames for balanced, unbalanced and drift snow.

Anchorage

Base plates and anchor rods for deep foundations.

Rooftop units

Platforms and dunnage with their own drift.

Who does what

Snow and frost design, split clearly

World Steel supplies

  • Snow and drift calculation for the stated basis
  • Purlin, frame and platform design or detailing
  • Anchorage details for the foundation design
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Ground snow and risk category by the Engineer of Record
  • Foundation and frost depth design
  • Engineer of Record approval and PE seal
  • Plan approval, permit and inspections
  • Erection and site work

Wisconsin

What we do not claim

World Steel does not design foundations. Frost depth and footings come from your Engineer of Record, and we detail the anchorage to match.

Wisconsin ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Wisconsin contractors

Wisconsin contractors: let’s win the next project together

If your next bid involves snow and frost, World Steel wants to be your long-term, win-win steel partner in Wisconsin. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Wisconsin project is cut, welded, inspected and packed.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.

Q&A

What Wisconsin buyers ask

Where does drift matter most?

At parapets, roof steps, rooftop units and walls of taller buildings, on the side away from the wind.

Is snow heavier in northern Wisconsin?

Yes. Ground snow rises toward the north and near Lake Superior, so we take it for each address.

Do you design for frost?

We design base plates and anchor rods for the foundation depth your engineer sets below the frost line.

Official sources: ASCE Hazard Tool

Wisconsin solutions

Every Wisconsin guide

Related pages

Code facts on this page summarize Wisconsin practice, the Wisconsin Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Wisconsin?

Send the drawings or the site address, size and use. We set the Wisconsin design basis with your Engineer of Record, design or detail the steel to the Wisconsin Commercial Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail through Chicago to your site.