View Victor’s profileWhat the bid desk does with your set
Four checks before we put a number on your steel
Large bids are won on clear scope. Each package goes through the same review by our estimators and engineers before the quote leaves our office.
-
Tonnage take-off
We take off the steel by member type, so the bid is priced on what the drawings show.
-
Production slot
We check your tonnage against the shop schedule and hold a slot that fits your on-site date.
-
Sequences
Large jobs are released, fabricated and shipped in the sequences your erector needs.
-
Clarifications
Exclusions and assumptions are written down, so your bid carries no surprises.
Released in sequences
A large job ships in the order it goes up
- Drawings by sequenceShop and erection drawings released sequence by sequence, included.
- Fabricated by sequenceThe steel your erector needs first is made first.
- Shipped by sequenceTagged, bundled and loaded in erection order to your US port.
Capacity for large jobs
The plant behind your quote has already built these
2,500 metric tons (about 2,750 short tons) of structural steel a month, from our own IAS AC472-accredited plant in Vietnam. Each job below was designed, detailed, fabricated and shipped by World Steel.
-
5,000 t about 5,500 short tons
Sunpro Steel Factory
Steel industryCan Tho City, Vietnam · 2024
-
2,500 t about 2,750 short tons
CPV Food Processing Factory
Food processingDong Nai Province, Vietnam · 2020
-
2,000 t about 2,200 short tons
Long Son petrochemical complex
Oil and gasBa Ria–Vung Tau, Vietnam · 2022
-
2,000 t about 2,200 short tons
M&D (MD Factory)
Warehouse and industrialThailand · 2024
-
1,500 t about 1,650 short tons
Tongwei Tien Giang feed factory, phase 1
Animal feedDong Thap Province, Vietnam · 2018
-
1,000 t about 1,100 short tons
New Era cold storage
Cold storage, phase 1 tonnageTay Ninh Province, Vietnam
Before you send
Questions contractors ask first
Something else? Write it in the message box and an engineer answers with your quote.
What tonnage counts as a large job for you?
Any package that would fill a smaller shop for months. Our plant fabricates 2,500 metric tons a month, and our largest delivered package is 5,000 metric tons for the Sunpro Steel factory. Tell us your tonnage and we confirm the slot we can hold.
Can you quote before the design is final?
Yes. Send the bid set as it stands. We quote what the documents show and list the assumptions, so you can carry a firm number with clear clarifications.
Can the job ship in phases?
Yes. Shop drawings, fabrication and shipping are released in sequences, and each shipment is packed in the order it goes up.
Who is responsible for erection and the PE seal?
The US contractor, our customer. We design, fabricate and supply the steel. Your Engineer of Record reviews, approves and seals; your crew or erector puts it up.
Not quite your project? Pick another route
- I am a contractorYou are a GC, design-builder, EPC or erector pricing steel or looking for a long-term fabricator.
- I have drawingsYou have a permit set, IFC model or sketches.
- I need a complete buildingYou know the use, the site and a rough size, but not the steel yet.
- I need Value EngineeringYou have a design and want steel or freight taken out of it.
- I need corrosion protectionYour site sees salt air, de-icing salt, fertilizer or fumes.
- I’m on the design teamYou are on the design team and need data, answers or delegated design.
- I need federal supply supportThe job is publicly funded or on a federal site.
- All quote routes