The cross-section
Six parts of a walkway that also carries services
Truss sides
Through-truss chords and diagonals form the walls of the walkway and carry the span.
Walkway deck
Checker plate or grating on floor beams, sloped to drain, as on CP4.
Handrails and guards
Rails on both sides, with screens where the bridge crosses traffic.
Pipe saddles
Saddles and guides for the pipe run, set in the deck framing.
Cable trays
Tray supports hung from the floor beams, with room to add more later.
Roof or enclosure
Optional roof framing, glazing mullion supports and cladding rails.
Building to building
Framing a skywalk for its enclosure and its two ends
Enclosure framing
Top chords and frames take roof decking, cladding rails and glazing supports, drawn with the truss.
Fixed and sliding ends
One bearing fixed, one sliding, so two buildings can move without loading the bridge.
Seats on the buildings
Steel seats, embed plates and slotted bearing plates supplied with the span.
Seen from the street
Architectural finish over primer, applied in our paint hall, with touch-up paint in the crate.
In the model from day one
Four loads that change a walkway truss
Pipes full, not empty
Pipe weight with contents and any thrust at bends, given by the process or MEP engineer.
Trays at their final fill
Cable tray loads at final fill, plus spare tiers if the owner expects growth.
Screens catch wind
Mesh or solid screens add wind area; they are agreed before the truss is sized.
Crowds at peak
Walkway crowd load and the vibration check, set by your Engineer of Record.
Who does what
The structure from us, the services from your trades
World Steel
- Truss, deck framing, pipe saddles and tray supports
- Roof and enclosure framing, bearing seats and embed plates
- Trial assembly, coating and erection drawings
- Shipping in segments to your US port
The US contractor and its trades
- Drawing approval, the seal and the permit with your Engineer of Record
- Glazing, cladding, roofing, lighting and MEP
- Pipes, cables and their installation
- The closure, the lift and erection
CP4 Steel Bridge, Singapore, 2020
From the shop floor to a night lift
Pedestrian bridge guides
The rest of the footbridge story
Who buys footbridges and why: pedestrian bridges by market and trail and park bridges. The design code behind them: pedestrian bridge standards.
Questions
Skywalks and utility bridges
Can a pedestrian bridge also carry pipes and cables?
Yes. The CP4 bridge we fabricated in Singapore carried pipe saddles in its walkway deck. Pipe, tray and screen loads go into the design model from the start so the truss is sized for them.
Do you supply the glazing for an enclosed skywalk?
No. We fabricate the steel structure, including roof framing and glazing supports. Glass, cladding, roofing, lighting and MEP come from your trades.
How is a skywalk between two buildings supported?
Usually one end is fixed and the other slides, so the two buildings can move independently. We supply the steel seats and slotted bearing plates; your Engineer of Record approves the arrangement.
Can the span be set during a short rail or road closure?
Spans are trial-assembled in our plant and match-marked, so the erection contractor can lift them in a short closure. CP4 was lifted at night beside a live road.
Who designs the pipe supports?
The pipe stress engineer gives the loads and guide positions. We design and fabricate the steel saddles and guides to suit, for your engineer’s approval.
A walkway with services to carry?
Send the span, the walkway width and the pipe and tray loads. We return a scope for the truss, the deck framing and the supports, ready for your engineer.