Oklahoma · Seismic
Structural steel for Oklahoma seismic design
Central and north-central Oklahoma saw a sharp rise in earthquakes in the 2010s, and the state now takes seismic design seriously for large buildings. The seismic design category depends on the site class and the risk category, so it is confirmed for every address rather than assumed for the state.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Houston and trucked north to your Oklahoma site.
- Region
- Central and north-central
- Decides
- Site class and risk category
- Most affected
- Bracing and anchorage
- Our part
- Category per site
Why it matters
Confirm the category, then detail
Seismic loads for most Oklahoma buildings are moderate, but the seismic design category still changes the steel: which bracing systems are allowed, how the connections are detailed and how the base plates and anchor rods are designed. Soft soil and a high risk category can move a site into a higher category.
We take the site class from your geotechnical report, confirm the category with your Engineer of Record and detail the braces, connections and anchorage for it. Where the design calls for seismic detailing under AISC 341, our shop works with AWS D1.8-qualified procedures and welders.
What we design and fabricate
Steel for seismic design
Bracing
Braces and gussets for the chosen lateral system.
Anchorage
Base plates and anchor rods for seismic shear and uplift.
Diaphragms
Roof bracing and collectors that tie the frame together.
Documented welds
AWS D1.8-qualified procedures where required.
Who does what
Seismic design, split clearly
World Steel supplies
- Bracing, connection and anchorage design or detailing
- Seismic detailing to the stated category
- Weld procedures and welder qualifications on request
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Geotechnical report and site class
- Engineer of Record approval and PE seal
- Special inspections where required
- Local permit and inspections
- Erection and site work
Oklahoma
What we do not claim
World Steel claims no AISC 341 certification. Seismic detailing is designed to AISC 341 where the design requires it and checked by your Engineer of Record.
Oklahoma ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Oklahoma contractors
Oklahoma contractors: let’s win the next project together
If your next bid involves seismic design, World Steel wants to be your long-term, win-win steel partner in Oklahoma. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Oklahoma project is cut, welded, inspected and packed.
Q&A
What Oklahoma buyers ask
Is all of Oklahoma a seismic zone?
No. Activity has been highest in central and north-central Oklahoma. The category is confirmed for every site from its soil and risk category.
Does seismic design change the steel much?
Mostly the bracing, connections and anchorage. The category decides which systems and details are allowed.
Can you supply AISC 341 detailing?
Yes, where the design requires it, with AWS D1.8-qualified welding procedures and welders.
Official sources: Oklahoma Geological Survey: earthquakes · USGS Earthquake Hazards
Oklahoma solutions
Every Oklahoma guide
Related pages
Code facts on this page summarize Oklahoma practice, the IBC as adopted by the Oklahoma Uniform Building Code Commission, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Oklahoma?
Send the drawings or the site address, size and use. We set the Oklahoma design basis with your Engineer of Record, design or detail the steel to the statewide code and to tornado, hail, ice and seismic loads, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.