Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Caribbean guide · Detailing

Coastal and marine steel detailing against corrosion

The best coating in the world fails early on a bad detail. Salt water that sits in a pocket, a crevice between two plates, a sharp edge where the paint pulls thin: that is where Caribbean steel rusts first. We detail coastal steel so water runs off, every surface can be painted and later reached, and the coating is as thick on the edges as on the flat.

2 mmedge radius
P3weld and edge prep
Sa 2½blast cleanliness
No trapswater runs off
SheetCoastal details
ExposureC5 · CX
ByWorld Steel

Poor and good

Four details that decide how long coastal steel lasts

Let the water out

A channel or angle laid toes up fills with rain and salt. We turn it over, add drain holes or close it off.

✕ Toes-up channel holding water
✓ Toes down or drained

No crevices

A gap between two plates holds moisture and cannot be painted. We seal-weld the joint or open the gap wide enough to coat.

✕ Open lap with a wet crevice
✓ Seal-welded lap

Round the edges

Paint pulls thin on a sharp edge. Edges are ground to a radius of about 2 mm so the film keeps its thickness.

✕ Sharp flame-cut edge
✓ Edge ground round

Lift the column base

A base plate at floor level sits in washdown water and splash. We stand it on a grout pad or plinth so it drains and dries.

✕ Base plate buried at floor level
✓ Base on a raised plinth

Detailing rules

Six rules in every coastal shop drawing

Access for the brush

Gaps between members are wide enough to blast and paint now and to inspect and touch up later.

Closed or open, never half

Hollow sections are sealed shut or fully vented and drained, never left half open to breathe salt air.

Mixed metals isolated

Stainless fixings, aluminium window frames and copper pipes are kept from touching carbon steel with sleeves and washers.

Fewer, bigger connections

Fewer pieces and fewer site welds mean fewer places for the coating to break. Bolted splices are coated before shipping.

Faying surfaces planned

Slip-critical faces get a coating class tested for slip, or are masked, as the connection design requires.

Weld prep to P3

For C5 and CX, welds, edges and surface imperfections are prepared to ISO 8501-3 grade P3 before blasting.

Shop drawings come at no extra cost: how our shop drawings work.

One building, three exposures

Three exposures on one coastal building

Outside, exposed

Canopies, eaves, external columns, stairs and walkways. Full C5 or CX system and the tightest detailing rules.

Outside, sheltered

Under deep eaves and in roof voids, where rain never washes the salt off. Often worse than exposed steel, and checked first in maintenance.

Inside, closed

Frames in an air-conditioned interior. Usually a lighter system, provided the envelope keeps salt air out.

How each exposure maps to a coating: salt air, C5 and CX.

In our plant

Edges ground, bases drilled, members checked

Real World Steel photos from our plant in Vietnam. None is shown as a Caribbean site.

Fitter grinding a cut steel edge, sparks flying, on the shop floor
Fitter comparing a built-up beam with its shop drawing
Welder guiding a drilled base plate hanging from a jib hoist
Finished columns with base plates resting on shop rails

Caribbean hurricane and marine guides

The rest of the storm and salt-air story

The code, port and parishes of each island are on its own page:

Questions

Questions on coastal detailing

Why does detailing matter if the coating is good?

Coatings fail first where water collects, where two plates leave a crevice and where the film is thin on an edge. Good detailing removes those weak spots so the coating can reach its design life.

Do you round the edges of every member?

For C5 and CX systems, cut edges are ground to a radius of about 2 mm and welds and imperfections are prepared to ISO 8501-3 grade P3, as ISO 12944 recommends.

How do you treat hollow sections near the sea?

They are either sealed shut by welding or, when galvanized, fully vented and drained. A half-open tube breathes salt air and rusts from the inside.

What about stainless steel bolts on painted steel?

They can be used if isolated with washers and sleeves; otherwise the carbon steel next to the stainless corrodes faster. Often a hot-dip galvanized bolt on galvanized or painted steel is the simpler choice.

Is steel under the eaves safe from salt?

Not always. Sheltered steel is not washed by rain, so salt builds up there. We treat it as exposed in the coating choice and point it out for the maintenance plan.

Detailing a coastal job?

Send the drawings. We review the details for water traps, crevices, edges and mixed metals, propose fixes with your engineer and build them into the shop drawings at no extra cost.