Advanced manufacturing: long spans over clean floors, and roofs full of services

The new wave of US factories, from battery and solar plants to electronics and pharmaceutical lines, are large, fast and full of services. Their steel has to span the production floor, carry heavy interstitial and roof loads and stay within vibration limits that protect sensitive equipment.

Long spans
Column-free production floors with truss or girder roofs
Service loads
Heavy ducts, process piping and roof air handling
Vibration
Floors and roofs checked against equipment criteria
Nitto Denko Factory, structural steel by World Steel World Steel reference Nitto Denko Factory Industrial manufacturing · Ho Chi Minh City, Vietnam · 2023
Advanced manufacturing at a glanceTypical ranges · not design values
Typical spans
30 to 60 m (100 to 200 ft) and more over production floors
Heights
Tall halls with interstitial service levels or catwalks
Structural systems
Trusses and girders, braced frames, interstitial platforms, multi-story support blocks
Loads that size the steel
Roof and hung MEP loads, process equipment, vibration criteria
Codes and standards
AISC 360, ASCE 7-22, AISC Design Guide 11 for vibration, owner standards
Coating and exposure
Clean interior; coatings to the owner’s cleanroom and fire requirements

What makes this project type different

What sizes the steel in advanced manufacturing

Battery, solar, semiconductor-adjacent and pharmaceutical plants share a pattern: very large production floors, as few columns as possible, and an enormous amount of mechanical and electrical service above them. Air handling on the roof, process exhaust, piping and cable trays can weigh more than the roof itself, and they arrive late in the design.

Some of these plants also set vibration criteria for floors and roofs carrying sensitive equipment. Meeting them is a stiffness question that the design team answers with member sizes and bracing, and the fabricator delivers with tight tolerances and clean connections.

Column-free floors

Production lines and cleanrooms want long spans, which bring trusses and deep girders.

Interstitial and roof services

Ducts, exhaust, piping and roof air handling create heavy, changing loads.

Vibration criteria

Floors and roofs under sensitive tools are sized for stiffness, not only strength.

Support blocks

Multi-story utility, office and lab blocks alongside the main hall.

Fire and hazardous occupancies

Battery and chemical processes can change construction type and fire ratings.

Speed to production

Owners want the shell closed quickly, so steel is released area by area.

Structures and systems

The structures in a typical package, and what we fabricate

Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.

Typical structures and systems for Advanced manufacturing
StructureTypical systemWhat we fabricate
Production hallLong-span trusses or plate girders on braced columnsTrusses, girders, columns, bracing
Service levelsInterstitial platforms and catwalksPlatform frames, grating supports, walkways
Roof plantDunnage and screens for air handling unitsDunnage steel, screen frames, access
Support blocksMulti-story braced or moment framesColumns, floor beams, deck support
Canopies and linksCovered links, docks and utility yardsCanopies, bridges and yard steel

Our advice before you bid

Decisions that save steel, time and rework

  • Freeze an MEP load allowance early

    Agree a hung and roof load allowance with the MEP engineer so the steel can be released before the services are final.

  • State vibration criteria clearly

    Which floors and roofs, which criteria and which equipment. The design team sizes for them; we fabricate to the tolerances.

  • Trusses or girders: compare both

    For long spans, trusses usually save steel and girders save depth. We price both for your layout.

  • Confirm fire ratings with the process

    Battery and chemical areas may raise ratings. Settle them before steel is sized.

  • Release steel area by area

    Detail and ship the hall in areas so the owner can start fit-out while the rest is erected.

World Steel projects of this type

Built by World Steel, from our own plant

Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.

Industrial manufacturing · Ho Chi Minh City, Vietnam · 2023

Nitto Denko Factory

Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.

Pharmaceutical manufacturing · Thailand · 2020

Boss Pharmacere Factory

Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.

Inside our factory
Tall columns and rafters inside a clear-span building with roof sheeting on Photo
Clear-span interior on a World Steel job in southern Vietnam.
Quality inspector taking dimensions on a finished steel member Photo
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Long-span trusses

Trusses and plate girders fabricated and trial-checked in our plant.

Dimensional QC

Members measured against the shop drawings before they are released.

Released by area

Model, drawings and shipments split by area to match the owner’s schedule.

The structural steel ecosystem

Products and solutions behind this guide

The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.

The industry behind this guide

World Steel projects of this type

Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US contractors

Advanced manufacturing: questions we hear

Can you supply steel for battery or solar factories?

Yes. Large production halls, service levels, roof plant steel and support blocks are typical structural steel packages, and we fabricate them at 2,500 metric tons a month.

Who sets vibration criteria for the floors?

The owner and the design team, from the equipment that will sit there. Your Engineer of Record sizes the steel for them, and we fabricate to the approved drawings.

Can steel be released before the MEP design is final?

Yes, with an agreed load allowance. It is the usual way to keep a fast plant on schedule.

Do you supply cleanroom systems?

No. We supply the structural steel; cleanroom walls, ceilings and services are other trades.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.

Does World Steel erect the steel?

No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.

A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.