Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Long spans and crane bays for Washington aerospace and industry

Washington’s aerospace cluster runs from Everett and Renton to Moses Lake and Spokane, surrounded by suppliers of parts, composites and tooling. Their buildings share a pattern: long clear spans, crane-served bays, very large doors and tight tolerances, on sites that are seismic in the west and snowy in the east.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Washington port.

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington project is cut, welded, inspected and packed.

Q&A

What Washington buyers ask

Can you design the hangar door header?

Yes, from the door manufacturer’s weights and reactions. The door itself is supplied by the door manufacturer.

Do you supply cranes?

Yes, on request. World Steel can supply the overhead crane with the steel, designed to CMAA 70 or 74, so wheel loads and clearances are set in one design. If you buy the crane elsewhere, we design the runway to that supplier’s data. Installation, commissioning and the load test are site scope.

Can you meet tight tolerances for tooling?

We fabricate to AISC tolerances or tighter where your specification states it, checked and recorded in our plant.

Washington solutions

Every Washington guide

Related pages

Code facts on this page summarize Washington rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Washington?

Send the drawings or the site address, size and use. We set the Washington design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.