Digital engineering thread
One model from the first calculation to the container
The numbers your Engineer of Record approves are the numbers our machines cut to. Nothing is redrawn by hand between design, detailing, fabrication and tracking.
-
SAP2000
Frames analyzed for the ASCE 7 loads at your site
Design Report with every load and member check
-
Tekla Structures
Every member, plate, weld and bolt modeled once
Approval, shop and erection drawings at no extra charge
-
CNC and laser
Plate up to 100 mm (4 in) cut and holed from the model
Parts that fit up as drawn, first time
-
PEB Studio
Each member tracked through fit-up, welding, coating and packing
Live status and inspection records from your office
-
IFC handover
The as-fabricated model exported for coordination
Files your BIM coordinator can load directly
Sheet E-001 · Design basis
The basis printed on every drawing set
One sheet tells your Engineer of Record and building official what the steel was designed to. This is our default; your criteria letter overrides it.
Loads
ASCE 7-22Wind, snow, rain, seismic and tornado loads from the hazard data for your coordinates.
Welding
AWS D1.1 · D1.3 · D1.8Shop welds made and inspected in our plant; field connections are bolted.
- Designed and detailed by
- World Steel engineering, SAP2000 and Tekla Structures
- Reviewed, approved and sealed by
- Your Engineer of Record (the US contractor's scope)
- Fabricated in
- World Steel plant, Vietnam · IAS AC472 accredited
- Shop drawings
- Included on every project at no extra charge
Who signs what
We design and fabricate. Your team approves, seals and builds.
A clear split avoids the most common delay on an imported steel package: nobody owning the seal.
World Steel
- Frame analysis and the Design Report with structural calculations
- Approval drawings: anchor rod plan with column reactions, framing plans, sections
- Shop and erection drawings plus the IFC model from one Tekla model
- Fabrication, welding, coating and inspection to the approved revision
- Manufacturing Data Record: mill certificates, weld and coating records
The US contractor, our customer
- Your Engineer of Record reviews, approves and seals the drawings
- Permit, special inspection and the building official's questions
- Site data: geotechnical report, survey and any local amendments
- Foundations, anchor rods and erection by your own crews or subcontractors
- Final approval of each drawing revision before we release it to the shop
From quote to shop floor
Four drawing stages, each with a named reviewer
Shop drawings and the Tekla model are included on every project at no extra charge.
-
With the quotation
Proposal drawings
For projects World Steel designs: general arrangement, frame lines, elevations and the scope of supply the quotation covers, so you see exactly what the price includes.
Reviewed by: You, your architect and your estimator
See a sample set → -
After the contract is signed
Approval drawings (APD) and Design Report
Anchor rod plan with column reactions, framing plans, elevations and sections, plus the Design Report with the structural calculations. Your Engineer of Record reviews, approves and seals them for the permit.
Reviewed by: Your Engineer of Record, architect and building department
Learn more → -
After the APD is approved
Shop drawings and Tekla model
Assembly and single-part drawings, CNC files, roof and wall sheeting, erection drawings, bolt lists and the IFC model, all from one Tekla model. Included on every project at no extra charge.
Reviewed by: Your reviewer, then our plant
Learn more → -
Once sheets are released
Fabrication to the approved revision
Members are cut, welded, coated and inspected in our Vietnam plant against the approved revision, and PEB Studio records which revision every piece was made to.
Reviewed by: You, live in PEB Studio
Learn more →
What our engineers design
From a single clear-span warehouse to heavy industrial framing
The same engineering team designs and details every structure type below, then hands the model straight to our own shop.






US site conditions
Eight guides for the hazard at your address
Wind on the plains, hurricanes on the coast, snow up north, earthquakes out West. Each guide explains what changes in the design and what we need from you.
High wind
Wind design that sizes each roof and wall zone for its own pressure
Hurricane coast
Building on the hurricane coast, from the Rio Grande to Cape Cod
Corrosion
Coatings specified for your exposure, not copied from a catalog
Energy code
Roof and wall assemblies built around your climate zone's energy targets
Connections
From roof screw to anchor rod: designing the load path link by link
Seismic
Earthquake-ready steel framing, engineered for the ground under your site
Snow load
Designing for snow where it actually piles up, not just where it falls
Maintenance
Seasonal upkeep for a steel building, tuned to where it stands
Audit before you award
Engineering you can check before you sign
IAS AC472 inspection program
Parts A and C, current through August 1, 2027. Your building official decides how it applies to special inspection.
SAP2000 and Tekla
Frames analyzed in SAP2000, every connection modeled in Tekla Structures, IFC files for your BIM coordinator.
Shop-welded, field-bolted
AWS D1.1 welds are made and inspected in the plant, so your erector makes bolted connections only.
Witness from your office
Join hold-point inspections on Zoom or Microsoft Teams and track every member in PEB Studio.
Codes and standards
The US standards we design and build to
Every page cites its source and the date we last checked it. The edition that applies to your job is confirmed with your building department.
State & Local Codes
Details confirmed in quoteWhich building code governs your steel building? It depends on the county
IBC
VerifiedReading the IBC as a steel building buyer
IEBC
Details confirmed in quoteAdding to a building that already stands? The IEBC decides what gets checked
ASCE 7
VerifiedASCE 7-22, load by load, for a US steel building
Photo
AISC 360
Details confirmed in quoteAISC 360 in practice: the checks behind every frame we ship
Photo
AISC 341
Details confirmed in quoteAISC 341: steel that bends in an earthquake, and the proof it was built to
Photo
AISI S100
Details confirmed in quoteAISI S100: light-gauge purlins and girts sized zone by zone
MBMA
Details confirmed in quoteThe conventions US teams expect from a metal building, followed from the first drawing
AISC DG
Details confirmed in quoteTapered frames and crane bays, checked by the methods US reviewers expect
Photo
AWS D1.1
Details confirmed in quoteEvery structural weld made in our Vietnam plant, every weld on record
AWS D1.3
Details confirmed in quoteThin steel follows its own welding code, and we know where it starts
Photo
AWS D1.8
Details confirmed in quoteAWS D1.8: the seismic supplement for welds that must hold through a major earthquake
Photo
RCSC
Not yet verifiedRCSC bolting, with the joint type spelled out for your ironworkers
Photo
ASTM
Not yet verifiedASTM grades, part by part, with certificates your reviewer can check
Photo
Connections
Details confirmed in quoteConnection design responsibility, settled before the first drawing
Photo
Shop Drawings
VerifiedOne current revision for your designers, our plant and your jobsite
BIM / Tekla
VerifiedOne Tekla model drives every drawing, from approval set to final bolt
AASHTO Pedestrian Bridges
Details confirmed in quoteSteel pedestrian bridges, designed to the AASHTO guide specification
SSPC
Details confirmed in quoteSSPC surface preparation, from SP 1 to SP 10, done in our blast shop
AMPP
Details confirmed in quoteAMPP: the SSPC and NACE coating standards under one name
Engineered at scale
The same team, on 5,000 t jobs
The plant fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month, and the engineering team runs several large packages in parallel.
5,000 t
Sunpro Steel FactorySteel industry · Can Tho City, Vietnam · 2024
2,500 t
CPV Food Processing FactoryFood processing · Dong Nai Province, Vietnam · 2020
2,000 t
Long Son petrochemical complexOil and gas · Ba Ria–Vung Tau, Vietnam · 2022
Q&A
Engineering questions from US contractors
Design basis 3 answers
Which US codes does World Steel design to?
By default IBC 2024 with ASCE 7-22 loads, AISC 360-22 for hot-rolled and built-up steel, AISI S100 for cold-formed purlins and girts, AISC 341 where seismic rules apply, and AWS D1.1, D1.3 and D1.8 for welding. When your jurisdiction is on an older edition, we design to the edition it has adopted.
Can you design to our own specification or an older code edition?
Yes. Your Engineer of Record sets the design basis in the criteria letter, including any local amendments to wind, snow, frost depth or seismic provisions, and every calculation and drawing is prepared to that basis.
Where do the wind, snow and seismic loads come from?
From the ASCE 7 hazard data for your site coordinates and risk category, or from the values your county publishes. They are confirmed with your Engineer of Record before any member is sized and printed in the Design Report.
Who does what 3 answers
Who puts the PE stamp on the drawings?
The Engineer of Record of the US contractor, our customer, not World Steel. World Steel designs and fabricates the steel and prepares the calculations and drawings. The US contractor, our customer, has them reviewed, approved and sealed by its Engineer of Record and handles the permit.
Are shop drawings extra?
No. Shop drawings, erection drawings and the Tekla model are included on every project at no extra charge.
Who erects the building?
The US contractor, our customer, with its own crews or subcontractors. World Steel supplies the structural steel package, the erection drawings and support from the project manager assigned to the job.
Large projects and quality 3 answers
How large a project can your engineering team take on?
The plant fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month, and the engineering team runs several large packages in parallel. Recent jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and Long Son at 2,000 t.
Does IAS AC472 remove special inspection in the shop?
It can, but the decision belongs to your building official under IBC Section 1704.2.5. Inspections on site carry on as normal.
Can our engineer watch inspections in the plant?
Yes. Hold-point inspections can be witnessed on Zoom or Microsoft Teams, and every member, inspection and coating reading is tracked in PEB Studio.
Software and deliverables 3 answers
Which software does your engineering team use?
Frames are analyzed in SAP2000 and every member, plate, weld and bolt is modeled in Tekla Structures. Approval, shop and erection drawings are all produced from that one model, and the same model drives the CNC and laser machines in the shop.
Can we get the model for our BIM coordination?
Yes. We export IFC files from the Tekla model so your BIM coordinator can check clashes with the architectural, MEP and foundation models before fabrication starts.
How do we follow fabrication once drawings are approved?
In PEB Studio. You log in to your own project and see each member move through cutting, fit-up, welding, coating and packing, with inspection records and container lists as they are signed off.
Open call · US contractors
World Steel is looking for US contractor partners
General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.
You bring
- Your market and owners
- EOR approval and permit
- Foundations and erection
We bring
- 2,500 t a month, own plant
- IAS AC472, first in Vietnam
- Engineering and shop drawings
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.