Welder beside a deep built-up girder running through the automatic line

Designed to US codes

Steel building engineering to the code your building department enforces.

IBC 2024 with ASCE 7-22 loads, AISC 360 and AISI S100 by default, or the edition and local amendments your jurisdiction has adopted. Calculations and drawings come ready for your Engineer of Record's review.

A deep plate girder going through automatic welding at World Steel, Vietnam.

Digital engineering thread

One model from the first calculation to the container

The numbers your Engineer of Record approves are the numbers our machines cut to. Nothing is redrawn by hand between design, detailing, fabrication and tracking.

  1. SAP2000

    Frames analyzed for the ASCE 7 loads at your site

    Design Report with every load and member check

  2. Tekla Structures

    Every member, plate, weld and bolt modeled once

    Approval, shop and erection drawings at no extra charge

  3. CNC and laser

    Plate up to 100 mm (4 in) cut and holed from the model

    Parts that fit up as drawn, first time

  4. PEB Studio

    Each member tracked through fit-up, welding, coating and packing

    Live status and inspection records from your office

  5. IFC handover

    The as-fabricated model exported for coordination

    Files your BIM coordinator can load directly

Sheet E-001 · Design basis

The basis printed on every drawing set

One sheet tells your Engineer of Record and building official what the steel was designed to. This is our default; your criteria letter overrides it.

Building code

IBC 2024

Or the edition and local amendments your jurisdiction has adopted.

Loads

ASCE 7-22

Wind, snow, rain, seismic and tornado loads from the hazard data for your coordinates.

Hot-rolled and built-up steel

AISC 360-22

Frames, rafters, columns and their connections.

Cold-formed members

AISI S100

Purlins, girts and eave struts, sized for uplift and drift.

Seismic systems

AISC 341

Applied when the Seismic Design Category and system call for it.

Welding

AWS D1.1 · D1.3 · D1.8

Shop welds made and inspected in our plant; field connections are bolted.

Designed and detailed by
World Steel engineering, SAP2000 and Tekla Structures
Reviewed, approved and sealed by
Your Engineer of Record (the US contractor's scope)
Fabricated in
World Steel plant, Vietnam · IAS AC472 accredited
Shop drawings
Included on every project at no extra charge

Who signs what

We design and fabricate. Your team approves, seals and builds.

A clear split avoids the most common delay on an imported steel package: nobody owning the seal.

World Steel

  • Frame analysis and the Design Report with structural calculations
  • Approval drawings: anchor rod plan with column reactions, framing plans, sections
  • Shop and erection drawings plus the IFC model from one Tekla model
  • Fabrication, welding, coating and inspection to the approved revision
  • Manufacturing Data Record: mill certificates, weld and coating records

The US contractor, our customer

  • Your Engineer of Record reviews, approves and seals the drawings
  • Permit, special inspection and the building official's questions
  • Site data: geotechnical report, survey and any local amendments
  • Foundations, anchor rods and erection by your own crews or subcontractors
  • Final approval of each drawing revision before we release it to the shop

From quote to shop floor

Four drawing stages, each with a named reviewer

Shop drawings and the Tekla model are included on every project at no extra charge.

  1. With the quotation

    Proposal drawings

    For projects World Steel designs: general arrangement, frame lines, elevations and the scope of supply the quotation covers, so you see exactly what the price includes.

    Reviewed by: You, your architect and your estimator

    See a sample set →
  2. After the contract is signed

    Approval drawings (APD) and Design Report

    Anchor rod plan with column reactions, framing plans, elevations and sections, plus the Design Report with the structural calculations. Your Engineer of Record reviews, approves and seals them for the permit.

    Reviewed by: Your Engineer of Record, architect and building department

    Learn more →
  3. After the APD is approved

    Shop drawings and Tekla model

    Assembly and single-part drawings, CNC files, roof and wall sheeting, erection drawings, bolt lists and the IFC model, all from one Tekla model. Included on every project at no extra charge.

    Reviewed by: Your reviewer, then our plant

    Learn more →
  4. Once sheets are released

    Fabrication to the approved revision

    Members are cut, welded, coated and inspected in our Vietnam plant against the approved revision, and PEB Studio records which revision every piece was made to.

    Reviewed by: You, live in PEB Studio

    Learn more →

Codes and standards

The US standards we design and build to

Every page cites its source and the date we last checked it. The edition that applies to your job is confirmed with your building department.

US codes & standards centerThe whole code stack on one pageSix layers from adopted code to import, every standard by discipline, part by part, by edition and by state. Open the center
Drawn illustration of state & local codes, standing in for a photo of this page Illustration

State & Local Codes

Details confirmed in quote

Which building code governs your steel building? It depends on the county

Drawn illustration of ibc, standing in for a photo of this page Illustration

IBC

Verified

Reading the IBC as a steel building buyer

Drawn illustration of iebc, standing in for a photo of this page Illustration

IEBC

Details confirmed in quote

Adding to a building that already stands? The IEBC decides what gets checked

Drawn illustration of asce 7, standing in for a photo of this page Illustration

ASCE 7

Verified

ASCE 7-22, load by load, for a US steel building

Welder beside a deep built-up girder running through the automatic line Photo

AISC 360

Details confirmed in quote

AISC 360 in practice: the checks behind every frame we ship

Red multi-story process tower frame next to a feed mill Photo

AISC 341

Details confirmed in quote

AISC 341: steel that bends in an earthquake, and the proof it was built to

Portal frames and roof purlins silhouetted against the sky Photo

AISI S100

Details confirmed in quote

AISI S100: light-gauge purlins and girts sized zone by zone

Drawn illustration of mbma, standing in for a photo of this page Illustration

MBMA

Details confirmed in quote

The conventions US teams expect from a metal building, followed from the first drawing

Drawn illustration of aisc dg, standing in for a photo of this page Illustration

AISC DG

Details confirmed in quote

Tapered frames and crane bays, checked by the methods US reviewers expect

Two welders operating a submerged-arc welding station on a member Photo

AWS D1.1

Details confirmed in quote

Every structural weld made in our Vietnam plant, every weld on record

Drawn illustration of aws d1.3, standing in for a photo of this page Illustration

AWS D1.3

Details confirmed in quote

Thin steel follows its own welding code, and we know where it starts

Fitter comparing a built-up beam with its shop drawing Photo

AWS D1.8

Details confirmed in quote

AWS D1.8: the seismic supplement for welds that must hold through a major earthquake

Painted beams with bolted end plates resting on stands below an overhead crane Photo

RCSC

Not yet verified

RCSC bolting, with the joint type spelled out for your ironworkers

Plate and coil strip racked by grade and heat number in the store Photo

ASTM

Not yet verified

ASTM grades, part by part, with certificates your reviewer can check

Welder looking over the stiffeners and end plate of a heavy column Photo

Connections

Details confirmed in quote

Connection design responsibility, settled before the first drawing

Fitter comparing a built-up beam with its shop drawing Photo

Shop Drawings

Verified

One current revision for your designers, our plant and your jobsite

Drawn illustration of bim / tekla, standing in for a photo of this page Illustration

BIM / Tekla

Verified

One Tekla model drives every drawing, from approval set to final bolt

Drawn illustration of aashto pedestrian bridges, standing in for a photo of this page Illustration

AASHTO Pedestrian Bridges

Details confirmed in quote

Steel pedestrian bridges, designed to the AASHTO guide specification

Drawn illustration of sspc, standing in for a photo of this page Illustration

SSPC

Details confirmed in quote

SSPC surface preparation, from SP 1 to SP 10, done in our blast shop

Drawn illustration of ampp, standing in for a photo of this page Illustration

AMPP

Details confirmed in quote

AMPP: the SSPC and NACE coating standards under one name

Engineered at scale

The same team, on 5,000 t jobs

The plant fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month, and the engineering team runs several large packages in parallel.

Large-project program

Q&A

Engineering questions from US contractors

Design basis 3 answers

Which US codes does World Steel design to?

By default IBC 2024 with ASCE 7-22 loads, AISC 360-22 for hot-rolled and built-up steel, AISI S100 for cold-formed purlins and girts, AISC 341 where seismic rules apply, and AWS D1.1, D1.3 and D1.8 for welding. When your jurisdiction is on an older edition, we design to the edition it has adopted.

Can you design to our own specification or an older code edition?

Yes. Your Engineer of Record sets the design basis in the criteria letter, including any local amendments to wind, snow, frost depth or seismic provisions, and every calculation and drawing is prepared to that basis.

Where do the wind, snow and seismic loads come from?

From the ASCE 7 hazard data for your site coordinates and risk category, or from the values your county publishes. They are confirmed with your Engineer of Record before any member is sized and printed in the Design Report.

Who does what 3 answers

Who puts the PE stamp on the drawings?

The Engineer of Record of the US contractor, our customer, not World Steel. World Steel designs and fabricates the steel and prepares the calculations and drawings. The US contractor, our customer, has them reviewed, approved and sealed by its Engineer of Record and handles the permit.

Are shop drawings extra?

No. Shop drawings, erection drawings and the Tekla model are included on every project at no extra charge.

Who erects the building?

The US contractor, our customer, with its own crews or subcontractors. World Steel supplies the structural steel package, the erection drawings and support from the project manager assigned to the job.

Large projects and quality 3 answers

How large a project can your engineering team take on?

The plant fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month, and the engineering team runs several large packages in parallel. Recent jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and Long Son at 2,000 t.

Does IAS AC472 remove special inspection in the shop?

It can, but the decision belongs to your building official under IBC Section 1704.2.5. Inspections on site carry on as normal.

Can our engineer watch inspections in the plant?

Yes. Hold-point inspections can be witnessed on Zoom or Microsoft Teams, and every member, inspection and coating reading is tracked in PEB Studio.

Software and deliverables 3 answers

Which software does your engineering team use?

Frames are analyzed in SAP2000 and every member, plate, weld and bolt is modeled in Tekla Structures. Approval, shop and erection drawings are all produced from that one model, and the same model drives the CNC and laser machines in the shop.

Can we get the model for our BIM coordination?

Yes. We export IFC files from the Tekla model so your BIM coordinator can check clashes with the architectural, MEP and foundation models before fabrication starts.

How do we follow fabrication once drawings are approved?

In PEB Studio. You log in to your own project and see each member move through cutting, fit-up, welding, coating and packing, with inspection records and container lists as they are signed off.

Open call · US contractors

World Steel is looking for US contractor partners

General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.

You bring

  • Your market and owners
  • EOR approval and permit
  • Foundations and erection

We bring

  • 2,500 t a month, own plant
  • IAS AC472, first in Vietnam
  • Engineering and shop drawings

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.