Made in Vietnam, landed at Savannah
Why ship your building through Savannah
The Georgia Ports Authority runs Garden City Terminal on the Savannah River, with the Mason Mega Rail Terminal on site for CSX and Norfolk Southern trains. The harbor was deepened to 14.3 m (47 ft) in 2022. Ocean Terminal, closer to downtown, is being rebuilt as a second container terminal; Georgia’s breakbulk and ro-ro cargo now moves through Brunswick.
Your building is fabricated in World Steel’s plant in Vietnam and reaches Savannah through the Panama Canal on most services. From there it is a short truck run to the I-95 and I-16 corridors, or a train to Atlanta and beyond.
-
One package, one plant
Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.
-
Accredited fabrication
World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.
-
Designed to US codes
IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.
-
Packed for this port
Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.
Port facts
Terminals, channel and connections at Savannah
Channel
14.3 m (47 ft) harbor, deepened 2022
Rail
CSX and Norfolk Southern at the Mason Mega Rail Terminal
Highways
I-95, I-16, I-516
| Terminal | Where / operator | Cargo |
|---|---|---|
| Garden City Terminal | Georgia Ports Authority | Containers |
| Ocean Terminal | Being rebuilt as a container-only terminal | Containers |
| Port of Brunswick | Georgia’s breakbulk and ro-ro gateway since 2022 | Breakbulk |
Source: Georgia Ports Authority, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.
From our plant to Savannah
How your steel gets here
Eastbound across the Pacific and through the Panama Canal, then up the Atlantic coast to the Savannah River. Some services run west via the Cape of Good Hope or the Suez Canal.
Your shipment to Savannah, leg by leg
Run the full simulation →By road
About 2 hours
World Steel pays
By sea · via Panama
≈ 11,600 nmi illustrative lane
Split between us
Customs, truck or rail
Planned with your trucker
You pay
Risk passes to you when the steel is on board the vessel at the named Vietnamese port.
Inland reach
Where steel goes from Savannah
CSX and Norfolk Southern trains leave from the terminal for Atlanta, Chattanooga and the Midwest. Trucks reach the I-95 and I-16 logistics parks around Savannah in minutes.
Designed for the region
Site conditions we design for around Savannah
Hurricane Coast Steel Buildings
Coastal Georgia is hurricane-prone; design for the mapped wind speeds.
How we design for itOn arrival
Receiving your steel at Savannah
Rail to Atlanta
For metro Atlanta, ask about rail from Garden City to an inland ramp.
Logistics parks
Many Savannah-area warehouses sit minutes from the gate; drayage is short.
Storm season
Plan site storage and bracing from June to November.
Documents sent ahead to your broker
- Commercial invoice and packing list per container
- Bill of lading and certificate of origin
- Container packing report with seal number and VGM
- EN 10204 3.1 mill certificates
- Shipping marks with a QR link to each member’s passport
What the quote states for Savannah
- The Incoterm, for example FOB Vietnam, CFR or CIF Savannah
- Who acts as importer of record
- Containers, flat racks or breakbulk for oversize members
- Delivery to the port or to a named US place, if offered
No prices, freight rates or duty estimates are published.