Kentucky · Bourbon

Structural steel for Kentucky bourbon rickhouses and distilleries

Kentucky ages most of the world’s bourbon in rickhouses: tall warehouses full of barrels that sit for years. Distilleries in Bardstown, Frankfort, Lawrenceburg, Loretto and Louisville keep adding them, often to one repeated design, along with still houses, bottling halls and visitor buildings. The barrels are heavy, the load lasts for years and the building must be planned for fire separation.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port, rail and truck to your Kentucky site.

Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.
Clusters
Bardstown, Frankfort, Louisville
Buildings
Rickhouses, still houses
Key need
Long-term rack loads
Our part
Repeatable warehouse steel

Why it matters

A heavy load that never leaves

In most warehouses the stored goods come and go. In a rickhouse the barrels stay for years, so the floor, the racks and the frame carry a heavy load almost all the time. How the racks are supported, by the building frame or on their own, changes the whole design.

We coordinate the rack system and storage loads with your engineer and the rack designer, design the frame and any floor support steel for that use, and keep the design repeatable so the next rickhouse on the campus is released faster.

What we design and fabricate

Steel for rickhouses and distilleries

Rickhouse frames

Frames designed for the rack and storage loads.

Floor support steel

Beams and columns for multi-level rack floors.

Fire separation

Steel coordinated with the fire walls and ratings your engineer sets.

Still houses

Tall process frames, platforms and bottling halls.

Who does what

Rickhouse steel, split clearly

World Steel supplies

  • Frame and floor support design or detailing for storage loads
  • Coordination with the rack designer on loads and supports
  • Repeatable packages for campus expansion
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Rack design and supply
  • Fire protection and separation design
  • Engineer of Record approval and PE seal
  • Plan review, permit and inspections
  • Erection and site work

Kentucky

What we do not claim

World Steel names no distiller as a customer and claims no completed Kentucky rickhouse. Rack design and fire protection design stay with your engineer and specialists.

Kentucky ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Kentucky contractors

Kentucky contractors: let’s win the next project together

If your next bid involves bourbon rickhouses, World Steel wants to be your long-term, win-win steel partner in Kentucky. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Kentucky project is cut, welded, inspected and packed.

Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Gate of the World Steel plant with the office block and two of its fabrication halls
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Q&A

What Kentucky buyers ask

Can a steel frame carry the barrel racks?

It can, or the racks can stand on their own inside the frame. We decide the load path with your engineer and rack designer early, because it changes the frame.

Can you repeat one rickhouse design across a campus?

Yes. We keep the model and the details so each later rickhouse is released and fabricated faster.

Do you supply still house steel?

Yes. Tall process frames, platforms, stairs and handrails for still houses can come in the same package.

Official sources: Kentucky Distillers’ Association

Kentucky solutions

Every Kentucky guide

Related pages

Code facts on this page summarize Kentucky practice, the Kentucky Building Code, state plan review, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the reviewing authority confirm the code and edition in force for your project.

Building in Kentucky?

Send the drawings or the site address, size and use. We set the Kentucky design basis with your Engineer of Record, design or detail the steel ready for plan review and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.