Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Texas · Ports and delivery

Shipping your steel from our Vietnam plant to Texas

Texas has more deep-water ports than any other Gulf state, and Port Houston handles more breakbulk and project cargo than almost any port in the country. We pick the port with the shortest haul to your site, pack the steel in erection order and state the Incoterm and importer of record in the quote.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Texas port.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Main gateway
Port Houston
Gulf Coast
Port Freeport, Galveston, Beaumont
South Texas
Port of Corpus Christi
Cargo
Containers, breakbulk and project cargo

Texas gateways

The port closest to your site

Map of Texas with Port Houston, Port Freeport, the Port of Corpus Christi, Beaumont, the main cities and the I-35, I-10, I-45 and I-20 corridors GULF OF MEXICO Dallas–Fort Worth Austin San Antonio El Paso Midland–Odessa Amarillo Laredo Port Houston Port Freeport Port of Corpus Christi Beaumont
Gulf ports I-35, I-10, I-45, I-20 Cities

Port Houston

Container terminals at Barbours Cut and Bayport and breakbulk docks on the Ship Channel, with reach to Dallas–Fort Worth, Austin and San Antonio.

Port page →

Port Freeport

Brazoria County port for the petrochemical plants south of Houston and the coast toward Matagorda.

Port of Corpus Christi

Gateway for the Coastal Bend, South Texas and the Rio Grande Valley.

Galveston and Beaumont

Options for project cargo and sites on the upper coast and in the Golden Triangle.

What we do not publish

No transit times, freight rates or duty rates. Sailings are confirmed when the cargo is booked, and each quote names the port of discharge, the Incoterm and the importer of record.

Texas ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Texas project is cut, welded, inspected and packed.

Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Q&A

What Texas buyers ask

Which port will my steel arrive at?

The one with the shortest haul to your site and a suitable sailing: usually Port Houston for most of Texas, Freeport or Corpus Christi for coastal plants.

Can long members ship as breakbulk?

Yes. Members too long for containers can ship as breakbulk to Port Houston and other Texas ports; we plan it with your logistics team.

Who clears customs?

The importer of record named in your quote: you, your broker or a party we arrange, depending on the Incoterm.

Official sources: Port Houston · Port Freeport · Port of Corpus Christi

Texas solutions

Every Texas guide

Related pages

Code facts on this page summarize Texas rules, the International Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Texas?

Send the drawings or the site address, size and use. We set the Texas design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.