Virginia · Statewide code
The Virginia Uniform Statewide Building Code for structural steel
Virginia uses one building code everywhere. The Board of Housing and Community Development adopts the Uniform Statewide Building Code, based on the International Building Code with Virginia amendments, and each county and city building department enforces it. Localities cannot write their own structural rules, which makes the design basis predictable across the state.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Virginia site through the Port of Virginia.
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
- Code
- Uniform Statewide Building Code
- Based on
- IBC with Virginia amendments
- Enforced by
- Local building departments
- Our part
- Code basis on sheet one
Why it matters
One code, many building departments
Because the code is the same statewide, a steel design that works in Loudoun works in Suffolk once the site loads change. What differs is the review: each locality has its own plan review process, submittal format and inspection schedule.
We put the code edition, the ASCE 7 loads and the design criteria on the first sheet of the calculations, so your Engineer of Record and the plan reviewer see the basis at once.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code edition | The Uniform Statewide Building Code edition in force at permit |
| Wind | ASCE 7 basic wind speed, exposure and risk category |
| Snow | Ground snow, drift and rain-on-snow where they apply |
| Seismic | Site class and seismic design category from the geotechnical report |
| Steel | AISC 360 design, connection types and coating system |
Who does what
Code compliance, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for your engineer’s review
- Mill certificates traced by heat
- Inspection records agreed in the ITP
- Tekla shop and erection drawings, included
The US contractor arranges
- Engineer of Record approval and PE seal
- Plan review with the locality
- Special inspections on site
- Foundations and erection
- The building permit
What we do not claim
World Steel holds no Virginia approval and no Virginia engineering license. The design is sealed and submitted by your Engineer of Record.
Virginia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Virginia contractors
Virginia contractors: let’s win the next project together
If your next bid involves statewide building code, World Steel wants to be your long-term, win-win steel partner in Virginia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Virginia project is cut, welded, inspected and packed.
Q&A
What Virginia buyers ask
Can a Virginia locality add its own structural rules?
Generally no: the Uniform Statewide Building Code applies statewide. Localities enforce it and run plan review. Your Engineer of Record confirms local requirements.
Which IBC edition is in force?
The edition adopted in the current Uniform Statewide Building Code. We confirm it with your engineer at the start of each project.
Do you provide calculations for plan review?
Yes. We provide the calculations and drawings your Engineer of Record reviews, seals and submits.
Official sources: Virginia Department of Housing and Community Development
Virginia solutions
Every Virginia guide
Related pages
Code facts on this page summarize Virginia practice, the Virginia Uniform Statewide Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.
Building in Virginia?
Send the drawings or the site address, size and use. We set the Virginia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.