Seismic inspection and quality assurance, from our plant to your site

A seismic system is only as good as the evidence behind it. The IBC calls for special inspection, AISC 341 sets the quality control and quality assurance tasks, and the building official decides what to accept. Our IAS AC472 accreditation, the first and only one held by a fabricator in Vietnam, is built to make that decision easier.

Special inspection
IBC Chapter 17, with the statement of special inspections
Seismic QC and QA
AISC 341-22 Chapter J tasks and documents
Approved fabricator
IAS AC472, first and only in Vietnam

Two kinds of inspection

Quality control and quality assurance are different jobs

Quality control is the fabricator’s and the erector’s own inspection: checking material, fit-up, welding and bolting as the work is done. Quality assurance is independent: an inspection agency engaged for the owner verifies that the work meets the documents. For seismic force-resisting systems under AISC 341, Chapter J lists which tasks each side observes, performs or documents.

The IBC adds special inspection. The registered design professional prepares a statement of special inspections, and the building official reviews the reports. For steel fabricated off site, IBC Chapter 17 lets the building official accept an approved fabricator in place of in-plant special inspection; at completion the fabricator submits a certificate of compliance. Accreditation under IAS AC472 is one of the recognized ways to show the plant meets that standard.

Who does what

Inspection roles on a seismic steel project

PartyRoleTypical scope
World Steel, in our plant Fabricator quality control Material and certificate checks, fit-up, welding procedures, visual weld inspection, nondestructive testing, dimensions, coating and the Manufacturing Data Record.
Owner’s inspection agency Quality assurance Verifies fabricator QC by review of records, plant visits or remote inspection, as the statement of special inspections requires.
The erector, a World Steel partner in the US Erector quality control Bolting, field welding, plumbness and anchor rods, under the erector’s own procedures. World Steel supplies the steel and does not erect it.
Special inspector on site Special inspection Field bolting, field welds, anchorage and seismic system checks listed in the statement of special inspections.
Registered design professional Design and observation Statement of special inspections, review of submittals and, where the IBC requires it, structural observation.

Chapter J documents

Fabricator records for the seismic system

  • ✓ Quality control program and inspection plan
  • ✓ Approved shop drawings with protected zones and demand-critical welds
  • ✓ Material certificates and heat traceability
  • ✓ Welding procedure specifications and qualification records
  • ✓ Welder qualification records
  • ✓ Filler metal certificates
  • ✓ Inspection and nondestructive testing reports
  • ✓ Nonconformance and repair records
  • ✓ Certificate of compliance at completion
  • Quality you can check

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made. Not stock images.

Fitter comparing a built-up beam with its shop drawing Photo
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Inspector walking a line of painted built-up members on the shop floor Photo
Final look at coated members before they are released to packing, World Steel plant in Vietnam.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

IAS AC472 accreditation

The first and only fabricator in Vietnam accredited under IAS AC472, covering design and fabrication inspection.

Remote QA access

Your inspection agency can review records and follow inspections online, or visit the plant in Vietnam.

PEB Studio records

Every QC report, test and photo attached to its piece mark, in real time.

The seismic solution ecosystem

Products and solutions behind this guide

The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.

World Steel projects: US codes, Guam, Japan and beyond

Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US buyers

Inspection & QA: questions we hear

Does the inspector have to travel to Vietnam?

Not always. Where the building official accepts the approved fabricator route, in-plant special inspection can be waived. Where quality assurance in the plant is required, the agency can visit or review records and inspections remotely, as the statement of special inspections allows.

Is IAS AC472 a US accreditation?

Yes. IAS is the International Accreditation Service, a US-based accreditation body, and AC472 is its program for inspection programs of structural steel fabricators.

Who pays for special inspection?

Special inspection is normally engaged by the owner or the registered design professional, not by the fabricator or the contractor. We supply the records the inspectors need.

Does World Steel provide shop drawings for seismic work?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure, and your Engineer of Record reviews and approves the calculations and drawings.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and standards govern, and your Engineer of Record confirms the criteria for each project.