Complete Building Solutions

Frame to finish, on one purchase order.

World Steel USA designs, fabricates and coordinates every layer of a US metal building: the frame, the roof and walls, doors and openings, coatings and fit-out, plus any extras you add. When two parts have to fit together, one supplier is answerable for it.

14

building systems

Structure through interiors

120

catalog products

Every one documented

114

made by World Steel

Fabricated in-house in Vietnam

18

interface rules

Fit-up checked in design

A–D

package levels

Bare frame to custom

AC472

IAS accredited

Inspection program

Building anatomy

What goes into a metal building, layer by layer

The cut-away places each World Steel system inside a typical clear-span rigid-frame building. Tap any part for a description, or explode the model to see the order the layers go on.

Sectioned metal building drawing with each of the 14 World Steel systems marked STEEL COATING BUILD-UP

For orientation only; your building is drawn to your own loads and layout. A dashed pin marks an optional system we buy in only when you ask.

The ecosystem

Sixteen systems in four groups

Parts designed in isolation leak, rattle or fail at the joints. We sort our systems in erection order: structure that carries load, envelope that sheds weather, protection and fit-out that make the space usable, and partner services you can bolt on.

Structure Primary Structural SystemSecondary FramingConnections & AnchorageCrane Runway & Industrial Supports Envelope Roofing SystemWall & Cladding SystemInsulation & Building PerformanceDoors & Building OpeningsDrainage & Weather Protection Protection & fit-out Mezzanines & Floor SystemsCorrosion ProtectionVentilation & Building Services SupportSpecial Building Accessories Coordinated options Optional Add-Ons (Made in Vietnam)
Long factory building framed with red tapered portal frames and roof purlins Photo

Structure

Primary Structural System

The built-up and hot-rolled steel frames that collect every roof, wall and floor load and deliver it to the foundation. World Steel designs this system under IAS AC472 Part C and fabricates it under Part A.

12 productsSystem page →

Portal frames and roof purlins silhouetted against the sky Photo

Structure

Secondary Framing

Roll-formed Z and C members that span from frame to frame, give the roof and wall sheets a fastening line and steady the inside flanges of the frames.

9 productsSystem page →

Red curved roof of a steel building, photographed from the air Photo

Envelope

Roofing System

Roof panels, insulation, trims and accessories made by World Steel and engineered with the frame, so panel span, purlin spacing and attachment are designed as a single roof.

10 productsSystem page →

Finished warehouse in white wall panels with sectional doors along one side Photo

Envelope

Wall & Cladding System

Wall panels, insulated metal panels, trims and louvers, coordinated with girt spacing and every opening.

9 productsSystem page →

Looking up at curved steel roof trusses spanning a wide hall Photo

Envelope

Insulation & Building Performance

Insulation and vapor control that meet US energy codes, keep occupants comfortable and stop condensation, from the Gulf Coast to the northern tier.

5 productsSystem page →

Insulated sectional door seen from inside a steel building Photo

Envelope

Doors & Building Openings

Overhead, roll-up and personnel doors, windows, louvers and skylights, with framed openings built into the steel design.

8 productsSystem page →

Six-story steel frame seen from the front, floor deck in place Photo

Protection & fit-out

Mezzanines & Floor Systems

Steel mezzanines, platforms, stairs and guardrails for storage, offices and equipment.

10 productsSystem page →

Welder looking over the stiffeners and end plate of a heavy column Photo

Structure

Connections & Anchorage

Bolts, plates, anchor rods and welded assemblies that hold the building together and fasten it to the foundation.

10 productsSystem page →

Coated members drying in rows on stands in the paint hall Photo

Protection & fit-out

Corrosion Protection

Surface preparation, coatings and detailing chosen for the real exposure: coastal air, road salt, agricultural atmospheres or dry inland sites.

9 productsSystem page →

Drone shot of a curved-roof steel building close to completion Photo

Envelope

Drainage & Weather Protection

Gutters, downspouts, flashings and canopies sized to the roof shape and to local rain and snow.

10 productsSystem page →

Open floor of a clear-span warehouse with no interior columns Photo

Protection & fit-out

Ventilation & Building Services Support

Louvers, ventilators and support steel for mechanical, electrical and process services.

6 productsSystem page →

Tall lattice columns of a crane-served industrial building during erection Photo

Structure

Crane Runway & Industrial Supports

Crane runways, equipment platforms and walkways, with cranes and hoists from qualified manufacturers as an option.

9 productsSystem page →

Long warehouse frame running beside a road Photo

Protection & fit-out

Special Building Accessories

Canopies, exterior stairs, platforms, carports and architectural steel features.

8 productsSystem page →

Drawn illustration of optional add-ons (made in vietnam), standing in for a photo of this page Illustration

Coordinated options

Optional Add-Ons (Made in Vietnam)Optional

Add-ons made in Vietnam and shipped with your steel when you ask: fire protection for structural steel and steel supports for electrical runs.

5 productsSystem page →

Painted beams with bolted end plates resting on stands below an overhead crane Photo

Request a quote

A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.

Start a quote →
Long-span warehouse inside an industrial campus, seen by drone Photo

Completed projects

Buildings framed with World Steel steel, from US warehouses and community centers to jobs overseas.

See projects →

Who supplies what

Our shop, a partner’s shop, or bought for your job

Each catalog item carries a single supply label, so your quote always shows what we fabricate and what we only coordinate. The bulk of the package is made in our plant, overhead and roll-up doors come from established partners, and building services are bought per project only on request.

114
6
Made by World Steel in Vietnam · 114
Cut, welded, formed and coated in World Steel’s own plant in Vietnam.
Made by Vietnamese partner plants · 6
Built by an established partner manufacturer, then shipped with your World Steel steel package.

Load path

Follow wind uplift from roof to footing

Suction on a roof travels through ten connections before the footing resists it. Every link maps to a system on this page and is checked against the same controlling ASCE 7 load case, so the chain has no weak link.

  1. Roof panel

    Roofing System
  2. Fastener

    Roofing System
  3. Purlin

    Secondary Framing
  4. Purlin clip

    Connections & Anchorage
  5. Rafter

    Primary Structural System
  6. Knee connection

    Connections & Anchorage
  7. Column

    Primary Structural System
  8. Base plate

    Connections & Anchorage
  9. Anchor rod

    Connections & Anchorage
  10. Foundation

    Designed by others from our reactions

Go deeper with ASCE 7 wind design for metal buildings, hurricane coast details and our US design basis.

System interfaces

The seams we solve before the shop starts

Each card is a connection between two systems: what attaches, what limits the design, which standard governs and what an inspector checks. Filter by system; the final details for your job are set on the shop drawings.

Secondary Framing Secondary Framing attaches to Primary Structural System Primary Structural System

Each purlin and girt bolts to a clip that was welded onto the rafter or column in our shop, and flange braces run from those members to the inside flange of the frame.

Constraint
The frame analysis assumes braces at set points, so clip and brace locations on the drawings must match it exactly.
Standards
AISC 360 for the frames; AISI S100 for the cold-formed members
Inspection
Confirm every bolt is in and snug and that no flange brace has been left off.
Roofing System Roofing System attaches to Secondary Framing Secondary Framing

Roof sheets are screwed through, or held by concealed clips, to the purlins below.

Constraint
Purlins can be no farther apart than the panel’s tested span allows at the ASCE 7 roof pressure, which tightens at corners, edges and ridges.
Standards
ASCE 7-22 components and cladding; manufacturer test data for the panel assembly
Inspection
Screw type, spacing and sealing are compared with the approved roof drawings.
Wall & Cladding System Wall & Cladding System attaches to Secondary Framing Secondary Framing

Wall sheets screw to the girts and finish at a base trim along the edge of the slab.

Constraint
The panel’s tested capacity sets the maximum girt spacing, and the wall end zones usually decide it.
Standards
ASCE 7-22 components and cladding
Inspection
Check the screw pattern and that side laps are sealed.
Insulation & Building Performance Insulation & Building Performance requires Roofing System Roofing System

Roof insulation sits over the purlins under the sheets, or comes built into insulated panels.

Constraint
Thicker insulation needs longer screws and can change the panel standoff or clip height.
Standards
IECC or ASHRAE 90.1 as adopted (IBC Chapter 13); ASTM E84 for exposed facings where required
Inspection
Look for an unbroken vapor retarder with every facing seam taped.
Insulation & Building Performance Insulation & Building Performance requires Wall & Cladding System Wall & Cladding System

Wall insulation goes behind the wall sheets, unless insulated metal panels are used instead.

Constraint
Screw length and trim depth follow the insulation thickness, the same as on the roof.
Standards
IECC or ASHRAE 90.1 as adopted (IBC Chapter 13)
Inspection
Insulation and vapor retarder run unbroken around doors, windows and louvers.
Doors & Building Openings Doors & Building Openings requires Primary Structural System Primary Structural System

Jambs and headers around each door and window take its wind reactions and pass them into the main frames.

Constraint
The frames cannot be finalized until the door supplier gives design pressures and reactions for each opening.
Standards
ASCE 7-22; DASMA 108 for overhead doors; ASTM E1886 and E1996 in wind-borne debris regions
Inspection
Measure clear opening sizes and check that jambs are plumb.
Doors & Building Openings Doors & Building Openings seals Wall & Cladding System Wall & Cladding System

Jamb, head and sill trims close the cut edges of the wall panels around each opening.

Constraint
Trim profiles are agreed with the door manufacturer so the door seals land on a flat surface.
Standards
—
Inspection
Hose test the openings where the specification calls for it.
Mezzanines & Floor Systems Mezzanines & Floor Systems optional with Primary Structural System Primary Structural System

A mezzanine either connects to the building columns or stands on its own posts.

Constraint
Connecting to the main frame adds load and can change how the frame is braced, so the choice is made early in design.
Standards
AISC 360; ASCE 7-22
Inspection
Check mezzanine bolts for tightness; decking attachment is checked against the deck maker’s pattern.
Connections & Anchorage Connections & Anchorage supports Primary Structural System Primary Structural System

Column base plates sit on anchor rods that carry the column reactions into the concrete.

Constraint
Rod positions and projection above the concrete must agree with the foundation drawings to the tolerance shown.
Standards
AISC 360; RCSC Specification; ASTM F1554 rods; ACI 318 embedment by the foundation engineer
Inspection
Survey rod locations and elevations before steel arrives, then grout under the base plates.
Corrosion Protection Corrosion Protection protects Primary Structural System Primary Structural System

Main frame members receive their blast cleaning and coating system in our plant.

Constraint
The system suits the site’s corrosivity, and any slip-critical faying surfaces get a coating qualified for that slip class or are masked.
Standards
AMPP surface preparation standards; ISO 12944; ASTM A123 when galvanized
Inspection
Film thickness and adhesion are measured and logged in the Manufacturing Data Record.
Corrosion Protection Corrosion Protection protects Secondary Framing Secondary Framing

Purlins and girts arrive galvanized from the coil or with a shop paint finish.

Constraint
Zinc coating weight is picked for the exposure, and edges cut after coating get touch-up.
Standards
ASTM A653
Inspection
Coil mill certificate showing the coating designation.
Corrosion Protection Corrosion Protection protects Connections & Anchorage Connections & Anchorage

Bolts and anchor rods get a finish that works with the coating on the steel they connect.

Constraint
Keep metals alike: galvanized steel takes galvanized bolts, so no galvanic couple forms.
Standards
ASTM F3125; ASTM F2329 for zinc on fasteners
Inspection
Fastener certificates checked against the bolt list.
Drainage & Weather Protection Drainage & Weather Protection attaches to Roofing System Roofing System

Gutters and flashings fix along the eaves, the ridge and any valleys.

Constraint
Gutter size follows the design rainfall rate, and every valley or parapet gutter needs a way for overflow to escape.
Standards
IBC Chapter 15; IPC or the local plumbing code
Inspection
Run water through the gutters and downspouts to confirm flow.
Ventilation & Building Services Support Ventilation & Building Services Support attaches to Primary Structural System Primary Structural System

Support steel for equipment bolts to the frames or picks up on the purlins.

Constraint
Unit weights and positions have to be known before the frame design is closed out.
Standards
AISC 360; ASCE 7-22 Chapter 13
Inspection
Check the support connections against the shop drawings.
Ventilation & Building Services Support Ventilation & Building Services Support seals Roofing System Roofing System

Ventilators and other roof penetrations are flashed into the roof sheets.

Constraint
Curbs and flashings are shaped to the exact rib profile of the roof panel.
Standards
—
Inspection
Water test around each penetration.
Crane Runway & Industrial Supports Crane Runway & Industrial Supports requires Primary Structural System Primary Structural System

Runway brackets and stepped crane columns are designed as part of the main frames.

Constraint
The crane maker must supply wheel loads, impact allowances and duty cycle before the frames are designed.
Standards
AISC 360; AISC Design Guide 7; CMAA 70 or 74
Inspection
Runway position and level checked against the tolerance table.
Special Building Accessories Special Building Accessories attaches to Primary Structural System Primary Structural System

Canopies and other exterior attachments bolt back to the main frames.

Constraint
Canopies pick up strong uplift and snow drift, so they are designed together with the frame they hang from.
Standards
ASCE 7-22
Inspection
Connection check against the drawings.
Optional Add-Ons (Made in Vietnam) Optional Add-Ons (Made in Vietnam) requires Corrosion Protection Corrosion Protection

Fireproofing or intumescent coating goes over a shop primer it is approved for.

Constraint
The fire protection manufacturer must accept the primer before the steel is painted.
Standards
Designs listed to UL 263 / ASTM E119
Inspection
Thickness readings recorded for the special inspector.

Package levels

Decide where our scope stops

Pick a level from frame-only to a fully custom building. The matrix shows the usual contents of each; your quote spells out every inclusion and exclusion, and nothing is assumed to be turnkey.

A

Frame package

Rigid frames, purlins, girts, bracing, bolts and anchor rods, with a coating chosen for the exposure at your site.

4 systems in full

B

Dried-in shell

Level A plus roof and wall panels, trims, closures and the accessories needed to make the building weathertight.

6 systems in full · 2 selected

C

Ready to fit out

Level B plus insulation sized to your energy code, doors, gutters and downspouts, ventilation and the interior systems you pick.

11 systems in full · 2 selected

D

Engineered to order

A one-off design that can also include our Made in Vietnam add-ons, such as fire protection for the steel and support steel for building services.

13 systems in full · 1 selected

Which systems each package level A to D normally covers
SystemABCD
Primary Structural System Included Included Included Included
Secondary Framing Included Included Included Included
Roofing System –Not included Included Included Included
Wall & Cladding System –Not included Included Included Included
Insulation & Building Performance –Not included –Not included Included Included
Doors & Building Openings –Not included –Not included Included Included
Mezzanines & Floor Systems –Not included –Not included Selected items Included
Connections & Anchorage Included Included Included Included
Corrosion Protection Included Included Included Included
Drainage & Weather Protection –Not included Selected items Included Included
Ventilation & Building Services Support –Not included –Not included Included Included
Crane Runway & Industrial Supports –Not included –Not included Selected items Included
Special Building Accessories –Not included Selected items Included Included
Optional Add-Ons (Made in Vietnam) –Not included –Not included –Not included Selected items

IncludedSelected itemsUsual scope; your quote is the final word

In service

Projects supplied as a single package

All projects

Interactive 3D

Inspect the model yourself

This model holds every component of a full metal building package. Section it, explode it or hide the panels, then click any part for its name, usual spec and product page, and drop it into your RFQ list.

Interactive 3D metal building with its frame, envelope and accessories labeled

A complete metal building you can rotate, from anchor rods and rigid frames up through the secondary steel, sheeting, gutters, doors, mezzanine, crane runway and canopy. Select a component to read its name and typical specification.

Items for your quote ()

Send these for a quote

Questions

Complete package questions

Not sure how much to buy from us and how much to source locally? Send a sketch and we will suggest a level with a line-by-line scope.

Quote a complete package
Can I buy just the frame?

Yes. Level A is the structural frame alone, and you can add panels, insulation, doors and accessories up to whatever level suits your budget and your local suppliers. Fire, electrical and mechanical systems are only included when you ask for them.

Who is responsible where two systems meet?

For every system we supply, we coordinate the connection: purlin spacing against panel span tables, door reactions against framed openings, coating against bolted faying surfaces. Those details are shown on the shop drawings you approve.

What code is a US package designed to?

IBC 2024 and ASCE 7-22 by default, with AISC 360 and AISI S100 member design. If your jurisdiction enforces an earlier edition or local amendments, we design to that. Your Engineer of Record confirms wind, snow, seismic and collateral loads for the site.

Do you pour foundations or erect the building?

No. Foundations are designed and built by others using our anchor rod plan and column reactions. Erection is by your erector unless the contract says otherwise; we provide erection drawings and remote support.

How does a complete building get to my site?

Steel and panels are packed in erection order in containers or as breakbulk and shipped from Vietnam to a West, Gulf or East Coast port. The quote names the Incoterm and the importer of record, and transit is confirmed when the booking is made.