Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Crew assembling a large steel truss on the shop floor

A large truss being put together in the Vietnam fabrication hall.

Solutions

Structural steel solutions for large US projects

Our products are the structures you buy. Our solutions are how we deliver them on large US jobs: the way you buy, the engineering for your site and the route from our plant in Vietnam to your port.

Start here

Start from where your project is today

Pick the line that sounds like your job. Each one leads to the solution that fits and the fastest way to send it to us.

I have a bid package for a large job

Send the bid documents. We take off the tonnage, check the steel against the specification and confirm the production slot we can hold for it.

Send a bid package Large-project program →

My Engineer of Record has a design

We fabricate your stamped design as drawn, prepare the shop drawings for your engineer’s approval and coat the steel to your specification.

Build to your drawings Shop drawings, included →

I need a complete steel building

Frame, roof, walls, openings and accessories engineered for your site and shipped as one coordinated package for your crew to erect.

Complete building package Browse steel buildings →

I only need steel members or components

Primary frames, purlins and girts, panels, trim or connection plates, made in our plant and sold on their own to match your job.

Components-only supply Building systems →

The heart of every solution

Four things every World Steel building stands on

Whichever product you choose and however you buy it, these four come with it.

  1. IAS AC472 accredited plant

    The first and only steel building plant in Vietnam accredited to IAS AC472, covering design and fabrication inspection.

    IAS AC472 Center →
  2. Built to US codes and standards

    Frames designed to IBC 2024, ASCE 7-22, AISC 360 and AISI S100 unless your Engineer of Record sets another basis, with calculations and drawings ready for your engineer’s review.

    US codes & standards →
  3. Made in our Vietnam plant

    Every frame is cut, welded and coated in World Steel’s own plant in Tay Ninh Province, from steel ordered to US grades, mainly from mills in Vietnam.

    Inside the factory →
  4. Value Engineering

    Design optimization on every project: less steel for the same code loads, every member sized to fit a shipping container, and your Engineer of Record decides what goes in.

    How we optimize your design →

How it runs

One fabricator from your bid documents to your port

The same eight steps sit behind every solution on this page. We design, detail, fabricate, coat and ship. Your crew erects the steel on site.

How we work
  1. Bid review Estimators and engineers read your documents, take off the tonnage and flag any gaps before you bid.
  2. Design and calculations Frames designed to the US codes at your address, with calculations for your Engineer of Record.
  3. Shop drawings Tekla shop drawings at no extra cost, released for your engineer’s review and approval.
  4. Fabrication Cut, fitted and welded in our IAS AC472-accredited plant in Vietnam.
  5. Live tracking Follow every member through cutting, welding, coating and QC release in PEB Studio.
  6. Inspection and coating Dimensional and weld checks, blasting and the coating system your specification names.
  7. Packing and shipping Bundled and tagged in erection sequence, then shipped by sea to a West, Gulf or East Coast port.
  8. Erection by your crew Your contractor erects the steel on site, with our erection drawings and packing lists in hand.

Design optimization

Design optimization comes with every solution

Before a single plate is cut, our engineers optimize your building for the loads at your site, for our plant and for the trip across the Pacific. The result is a frame that carries the same code loads with less steel, ships in standard containers and goes into production quickly, from materials already available in Vietnam.

  • Optimized steel tonnage

    Tapered built-up frames follow the bending moment, and bay spacing, purlins and girts are tuned as one system. Your building carries the same code loads with the steel it actually needs, and the proposal reports the tonnage for your project.

    Tapered frames Built-up steel sections Z purlins

  • Lower investment cost

    Less steel to buy, fewer shop hours, fewer containers and simpler bolted erection all lower the installed cost of the building. The proposal shows the effect of each option on your project, never a generic percentage.

    Complete building package Building packages Components-only supply

  • In-depth project assessment

    Engineers review your drawings, the code edition your jurisdiction enforces, wind, snow and seismic data, foundations, erection sequence and the route to your site, then write down the risks and options they find before you commit.

    Steel building design Design process US codes & standards

  • Designed to ship in containers

    Every member is detailed to fit inside a standard 20 ft or 40 ft shipping container, with splices placed by the engineer, not cut on the shop floor. Containers are the most economical way to move steel from Vietnam to the US, and they reach your port sealed.

    Shipping Vietnam to USA Export packing & shipping Incoterms for steel buildings

  • Fast response to your production schedule

    Design, detailing and fabrication sit under one roof, and the materials are already available in Vietnam, so approved drawings move into production without waiting on imported steel. Your production slot is booked against your site date and tracked live in PEB Studio.

    Shop drawings, included PEB Studio Project management

  • Quality materials from Vietnam plants

    Most of the plate, coil and sections come from steel plants in Vietnam, ready for our plant without long import queues. Each heat arrives with the mill’s EN 10204 type 3.1 inspection certificate, and its heat number follows every member it goes into.

    World Steel factory Quality control IAS AC472 accreditation

Inside the plant

Every solution on this page is built here

Real photos from World Steel’s own plant in Tay Ninh Province, Vietnam, where every US order is cut, welded, coated and packed. Our office in Westminster, California handles sales and support.

Drone view across the World Steel plant: office block in front, fabrication halls behind Vietnam plant
World Steel’s plant in Tay Ninh Province, Vietnam, from the air: office in front, fabrication halls behind.
Long shop floor of built-up members, overhead cranes and a center walkway Vietnam plant
One of the World Steel fabrication halls in Vietnam where US orders are built.
Welder beside a deep built-up girder running through the automatic line Vietnam plant
A deep plate girder going through automatic welding at World Steel, Vietnam.
Rows of labeled steel bundles ready to leave the plant Vietnam plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.

Solutions · Engineering

Designed for your site and your building department.

Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.

Solutions · Structural steel solutions by state

In-depth guides for the codes, loads, industries and ports of each US state.

Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.
Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.

Structural steel solutions by state

Every state guide set on one map, with the codes, loads, industries and ports behind each.

Learn more →

Florida steel solutions

Florida Building Code wind, HVHZ, debris, salt air, flood zones and Florida ports.

Learn more →

California steel solutions

CBC seismic design, multi-story, plan check, Title 24, wildfire zones and California ports.

Learn more →

Texas structural steel solutions

Petrochemical steel, Gulf Coast windstorm, hail, clay soils, heat, city codes and Texas ports.

Learn more →

Washington structural steel solutions

Cascadia seismic, snow, the state energy code, marine air, data centers, aerospace and ports.

Learn more →

Arizona structural steel solutions

Desert heat, monsoon wind, caliche soils, local codes, semiconductor fabs, data centers and the overland haul.

Learn more →

Georgia structural steel solutions

Port of Savannah, EV and battery plants, Atlanta data centers, the state minimum codes, coastal wind and humidity.

Learn more →

North Carolina structural steel solutions

Hurricane coast, the NC State Building Code, life sciences, EV batteries, data centers, aerospace and the ports.

Learn more →

Tennessee structural steel solutions

New Madrid seismic, the state code, EV and battery plants, auto plants, Memphis logistics, data centers and storms.

Learn more →

Ohio structural steel solutions

The Ohio Building Code, lake-effect snow, chip and battery plants, data centers, heavy industry and inland routes.

Learn more →

South Carolina structural steel solutions

Charleston seismic, the hurricane coast, the state codes, auto, EV and aerospace plants, distribution and the port.

Learn more →

Louisiana structural steel solutions

Hurricane wind, the uniform code, petrochemical plants, LNG terminals, soft soils, corrosion, river ports and data centers.

Learn more →

Virginia structural steel solutions

Data Center Alley, the statewide code, Hampton Roads wind, the port, advanced plants, seismic, mountain snow and distribution.

Learn more →

Illinois structural steel solutions

Local codes and Chicago, the rail hub, snow and wind, data centers, Will County logistics, food, manufacturing and southern seismic.

Learn more →

Pennsylvania structural steel solutions

The Uniform Construction Code, karst and sinkholes, Lehigh Valley warehouses, snow and frost, data centers, life sciences, western energy and the ports.

Learn more →

Michigan structural steel solutions

The Michigan Building Code, lake-effect snow, auto supplier plants, battery and EV plants, data centers, warehouses, food and rail delivery.

Learn more →

Indiana structural steel solutions

The Indiana Building Code and design release, snow, wind and seismic, RV, battery and auto plants, steel mills, data centers, logistics and life sciences.

Learn more →

Missouri structural steel solutions

Local codes, New Madrid seismic, tornado and ice, the Kansas City rail hub, auto plants, St. Louis aerospace, data centers and food plants.

Learn more →

Kentucky structural steel solutions

The Kentucky Building Code, seismic, tornado and ice, bourbon rickhouses, auto and battery plants, air cargo, heavy industry and equine buildings.

Learn more →

Alabama structural steel solutions

Local codes, Gulf hurricane wind, tornado storms, auto plants, Huntsville and Mobile aerospace, mills, the Port of Mobile and data centers.

Learn more →

New York structural steel solutions

The Uniform Code and NYC codes, lake-effect snow, Long Island wind, multi-story steel, chip plants, food and dairy, the harbor and data centers.

Learn more →

Colorado structural steel solutions

Local codes, snow by elevation, Front Range wind and hail, aerospace, energy plants, food and beverage, Denver rail logistics and data centers.

Learn more →

Oklahoma structural steel solutions

The statewide code, tornado, hail and ice, seismic design, aircraft hangars, oil and gas, manufacturing, logistics and agriculture.

Learn more →

New Jersey structural steel solutions

The Uniform Construction Code, Shore wind and flood, snow on big roofs, Turnpike warehouses, Port Newark, pharma, cold storage and data centers.

Learn more →

Wisconsin structural steel solutions

The commercial building code and plan review, snow and frost, dairy and cheese plants, paper mills, machinery plants, data centers and logistics.

Learn more →

Minnesota structural steel solutions

The State Building Code, snow and frost, food and agribusiness, cold storage, medical devices, the Iron Range, data centers and rail logistics.

Learn more →

Massachusetts structural steel solutions

780 CMR and the energy code, snow and coastal wind, life sciences labs, advanced manufacturing, I-495 warehouses, ports, data centers and seafood cold storage.

Learn more →

Maryland structural steel solutions

The Building Performance Standards, Bay wind, flood and snow, the Port of Baltimore, data centers, life sciences, I-95 warehouses, poultry and port industry.

Learn more →

Oregon structural steel solutions

The Structural Specialty Code, Cascadia seismic design, snow and coastal wind, Silicon Forest chip plants, data centers, food processing, wood mills and the Port of Portland.

Learn more →

Nevada structural steel solutions

County building codes, northern seismic design, desert heat and wind, Reno industrial parks, data centers, Las Vegas warehouses, mining plants and routes from the California ports.

Learn more →

Utah structural steel solutions

The State Construction Code, Wasatch Fault seismic design, mountain snow loads, data centers, aerospace plants, Salt Lake distribution, mining and rail routes.

Learn more →

Iowa structural steel solutions

Iowa building codes, derecho and tornado wind, snow and frost, data centers, food and ag plants, machinery plants, Des Moines distribution and rail.

Learn more →

Kansas structural steel solutions

Kansas local building codes, plains wind and hail, Wichita aviation, Kansas City logistics, beef and food plants, advanced manufacturing, grain and feed buildings, and delivery to site.

Learn more →

Arkansas structural steel solutions

Arkansas Fire Prevention Code, New Madrid seismic, tornadoes and ice storms, Northwest Arkansas logistics, poultry and food plants, steel mills and heavy plants, delta farm buildings, and delivery to site.

Learn more →

Mississippi structural steel solutions

Mississippi coastal and local codes, Gulf hurricane wind, auto and advanced plants, shipyards and salt air, data centers, poultry and food plants, DeSoto County distribution, and delivery to site.

Learn more →

Nebraska structural steel solutions

Nebraska state building code, blizzard snow and drift, plains wind and storms, Omaha data centers, beef and food plants, ethanol and ag processing, feedyard and farm buildings, and delivery to site.

Learn more →

New Mexico structural steel solutions

New Mexico Commercial Building Code, Rio Grande rift seismic, altitude and mountain snow, Permian oil field, sound stages and long spans, dairy and cheese plants, labs and advanced plants, and delivery to site.

Learn more →

Idaho structural steel solutions

Idaho building code, fault zones and seismic, mountain snow, potato storage and processing, dairy and cold storage, Treasure Valley warehouses, chip and advanced plants, and delivery to site.

Learn more →

West Virginia structural steel solutions

West Virginia State Building Code, mountain snow and floods, steep sites and valley pads, chemical and energy plants, Ohio Valley manufacturing, Eastern Panhandle logistics, mine and prep plant steel, and delivery to site.

Learn more →

Connecticut structural steel solutions

Connecticut State Building Code, shoreline hurricane wind, hill-town snow, aerospace and defense, mill additions and tight sites, New Haven life sciences, I-84 and I-91 distribution, and delivery to site.

Learn more →

Hawaii structural steel solutions

Hawaii county building codes, island hurricane wind, Big Island seismic, salt air and corrosion, harbor warehouses, hotels and multi-story, energy and utility plants, and delivery to site.

Learn more →

Alaska structural steel solutions

Alaska code and plan review, earthquake design, snow and deep cold, remote sites and short seasons, oil and gas facilities, mine structures, seafood plants, and delivery to site.

Learn more →

Montana structural steel solutions

Montana building code, western seismic belts, snow and chinook wind, refineries and energy, copper and metal mines, wheat and cattle buildings, big distances, remote sites, and delivery to site.

Learn more →

Wyoming structural steel solutions

Wyoming code coverage, wind and drifting snow, Teton and Yellowstone seismic, oil and gas, coal and trona mines, Cheyenne data centers, ranch buildings, and delivery to site.

Learn more →

North Dakota structural steel solutions

North Dakota State Building Code, blizzards and deep cold, Bakken oil field, heated shops, grain and farm buildings, data centers, Red River Valley food plants, and delivery to site.

Learn more →

South Dakota structural steel solutions

South Dakota local building codes, prairie wind, blizzard drift and frost, Sioux Falls distribution, dairy, cheese and meat plants, ethanol and ag processing, farm and ranch buildings, and delivery to site.

Learn more →

Maine structural steel solutions

MUBEC, heavy snow, coastal salt air, shipyards and marine industry, paper and forest products mills, seafood and potato plants, Southern Maine warehouses, and delivery to site.

Learn more →

New Hampshire structural steel solutions

New Hampshire State Building Code, mountain snow, moderate seismic, advanced manufacturing, southern distribution, Millyard life sciences, hospitals, campuses and resorts, and delivery to site.

Learn more →

Vermont structural steel solutions

Vermont Fire and Building Safety Code, Green Mountain snow, chip and precision plants, dairy and specialty food, cold storage and warehouses, ski resort lodges, hospitals and campuses, and delivery to site.

Learn more →

Rhode Island structural steel solutions

Rhode Island State Building Code, hurricane wind, offshore wind ports, defense and marine plants, Providence labs and hospitals, I-95 distribution, salt air coatings, and delivery to site.

Learn more →

Delaware structural steel solutions

Delaware county and city codes, coastal wind, poultry and food plants, chemistry and life sciences, I-95 distribution, port cold storage, refinery and energy, and delivery to site.

Learn more →

Washington, DC structural steel solutions

DC Construction Codes, tight city sites, mid-rise frames, hospitals, universities and labs, venues and long spans, seismic after 2011, rooftop snow drift, and delivery to site.

Learn more →

Products

What you can buy from World Steel

Two product lines, both made in Vietnam: complete steel buildings by use, and the building systems and components they are built from.

Tools

Plan before you call

Q&A

Questions US contractors ask before choosing a solution

Short answers on supply models, engineering and delivery. Ask us anything that is not here.

Choosing a solution 4 answers

What is the difference between a World Steel product and a solution?

A product is what you buy: a steel building, a structural package or a building system. A solution is how we deliver it to your job: the supply model you choose, the engineering for your site and the delivery from our plant in Vietnam to your port.

Which supply model fits a general contractor bidding a large job?

Most general and design-build contractors send us the bid package. We take off the tonnage, check the specification and quote the structural steel package, with shop drawings included. If your Engineer of Record has already designed the steel, we fabricate to those drawings instead.

Can we buy only part of the steel from you?

Yes. Many customers buy only the primary frames, only the secondary members, or only plates and connection material. We match your drawings and mark every piece so it fits the parts supplied by others.

Do you erect the steel on site?

No. World Steel designs, details, fabricates, coats and ships the steel. Erection and all site work stay with you, the US contractor, or the erector you hire. We send erection drawings, bolt lists and packing lists organized by erection sequence.

Engineering and drawings 4 answers

Who approves the drawings and seals the design?

Your Engineer of Record. We prepare the design calculations and shop drawings for their review and approval. The approval, any PE seal and the building permit stay on your side, with your engineer.

Are shop drawings an extra cost?

No. Shop drawings come with every project at no extra charge. They are produced from one Tekla Structures model, so the erection drawings, assembly drawings and the cutting files in the shop all come from the same source.

Which US codes do you design and fabricate to?

Frames are designed to the building code adopted at your address, with loads to ASCE 7 and steel design to AISC 360, and to AISC 341 where the seismic design category calls for it. Welding follows AWS D1.1, D1.3 and, for seismic welds, D1.8 with qualified procedures and welders.

Can our inspector check the work in Vietnam?

Yes. Your inspector can visit the plant, join an online audit over Zoom or Microsoft Teams, or follow the job in PEB Studio. Remote inspector access and mill certificates to EN 10204 type 3.1 with Charpy results are available on request.

Quality and the plant 4 answers

What does IAS AC472 accreditation mean for our job?

IAS AC472 is the accreditation program for structural steel fabricators. World Steel has held it since 2019 and is the first and only fabricator in Vietnam with it. IAS auditors check our plant, procedures and records twice a year, so your inspector starts from an audited quality system.

How is each piece of steel traced back to the mill?

Plate, coil and sections are stored by grade and heat number from the day they arrive. Every member keeps its heat number through cutting and fitting, so the mill certificate for any piece in your building can be found from its piece mark.

How much steel can your plant take on at once?

Our plant fabricates about 2,500 metric tons (about 2,750 short tons) of structural steel a month, with several projects moving through the shop in parallel. When we quote, we confirm the production slot we can hold for your tonnage.

Can we visit the plant before we place an order?

Yes. You can book a plant visit and factory audit in Vietnam, or an online audit over Zoom or Microsoft Teams, from our visit pages. Many contractors do one of the two before awarding a large package.

Delivery and tracking 4 answers

How is the steel shipped from Vietnam to our site?

Steel is bundled, tagged and loaded by erection sequence, then shipped by sea to a West, Gulf or East Coast port. Inland delivery to the site can be coordinated, and the delivery terms follow the Incoterms rule agreed in your contract.

How do we see where our order stands?

In PEB Studio. You follow your own members through cutting, welding, coating and QC release, and see what is packed and what has shipped, without waiting for a weekly report.

Can a large job ship in stages?

Yes. Large packages are released, fabricated and shipped in the sequences your schedule needs, so the first areas can be erected while later ones are still in the shop.

Is all the steel made in Vietnam?

Yes. Every member is fabricated in World Steel’s own plant in Tay Ninh Province, Vietnam, from plate, coil and sections made mainly by Vietnamese mills, with mills in Japan, Korea, Indonesia or Thailand when a specification calls for it. Our office in Westminster, California handles sales and support; it is not a plant.

Open call · US contractors

World Steel is looking for US contractor partners

General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.

You bring

  • Your market and owners
  • EOR approval and permit
  • Foundations and erection

We bring

  • 2,500 t a month, own plant
  • IAS AC472, first in Vietnam
  • Engineering and shop drawings

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.