Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Idaho · Snow

Structural steel for Idaho mountain snow loads

Idaho ground snow ranges from moderate in Boise and on the Snake River Plain to very high in McCall, Sun Valley, Stanley and North Idaho, and changes fast with elevation. We take snow for each address with your Engineer of Record and check drift and sliding snow at every roof step.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Seattle, Tacoma or Portland for your Idaho site.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Valley
Moderate snow
Mountains
Very high snow
Check
Drift and sliding
Frost
Deep footings

Why it matters

Snow that changes by the kilometer

Two sites an hour apart can have very different ground snow, and resort towns add steep roofs, sliding snow and drift against taller parts. Missing a drift case is where roof steel fails.

We size purlins, rafters and trusses for the site snow, drift and sliding snow, detail thermal breaks where the envelope needs them and give your foundation engineer the base reactions.

What we design and fabricate

Steel for heavy snow

Purlins for drift

Z purlins lapped and sized where drift collects.

Rafters and trusses

Built-up rafters and trusses for heavy snow over long spans.

Thermal breaks

Details that keep cold out of heated and frozen spaces.

Base reactions

Clear reactions for footings set below the frost line.

Who does what

Snow and frost, split clearly

World Steel supplies

  • Roof steel designed for snow and drift to ASCE 7
  • Drift checks at steps, parapets and rooftop units
  • Thermal break details at the envelope
  • Base reactions for the foundation design
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Ground snow and exposure with the Engineer of Record
  • Engineer of Record approval and PE seal
  • Frost depth and footing design
  • Cold-weather concrete and site work
  • Erection and site work

Idaho

What we do not claim

World Steel does not design foundations. Frost depth and footing design are your foundation engineer’s scope; we provide the base reactions they need.

Idaho ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Idaho contractors

Idaho contractors: let’s win the next project together

If your next bid involves mountain snow, World Steel wants to be your long-term, win-win steel partner in Idaho. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Idaho project is cut, welded, inspected and packed.

Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.

Q&A

What Idaho buyers ask

Where does the snow load come from?

From ASCE 7 and the state and local snow data your Engineer of Record uses for the site.

Do you check sliding snow?

Yes. Sliding snow and drift are checked at lower roofs and steps.

Do you design the footings?

No. Your foundation engineer designs them; we provide the reactions.

Official sources: ASCE 7 Hazard Tool

Idaho solutions

Every Idaho guide

Related pages

Code facts on this page summarize Idaho practice, the Idaho Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Idaho?

Send the drawings or the site address, size and use. We set the Idaho design basis with your Engineer of Record, design or detail the steel to the Idaho Building Code, its fault zones and mountain snow, and quote it made in our plant in Vietnam, packed in erection order and delivered through Seattle, Tacoma or Portland to your site.