Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Puerto Rico steel solutions

Structural steel for large Puerto Rico projects, in all 78 municipalities

Puerto Rico rebuilt after Irma and Maria in 2017, the southwest earthquakes of 2020 and Fiona in 2022, and it keeps building: pharmaceutical and medical-device plants, hospitals, schools, hotels and warehouses. We design and fabricate that steel in our own plant in Vietnam, 2,500 t a month, and ship it packed in erection order to the port of San Juan.

Joannes est nomen ejus · John is his name

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam, shipped to San Juan

Metal floor deck laid on each level of a steel-framed building
Going up beside the plant in Vietnam: World Steel framed its own office building.

Why World Steel

What a large Puerto Rico project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released building by building.

Large-project program →

Ready for permit

Calculations that state the Puerto Rico Building Code basis for your engineer and OGPe.

Building code guide →

Hurricane design

Roofs, openings, connections and anchors designed together, after Maria showed what fails first.

Hurricane guide →

Seismic detailing

Ductile frames and AWS D1.8 welds for the trench, the Mona Passage and the southwest faults.

Seismic guide →

Plant-grade tolerances

Process buildings, mezzanines and pipe racks for pharmaceutical and medical-device plants.

Manufacturing guide →

Shipped to San Juan

Packed in erection order and shipped to the port of San Juan, or Ponce where the service allows.

Port delivery guide →

Project types

What Puerto Rico builds in steel, and where

The four project types behind most steel orders across the island, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Tall lattice columns of a crane-served industrial building during erection

Pharmaceutical and industrial plants

Manatí, Barceloneta, Juncos, Guayama, Caguas

Process buildings, crane bays, mezzanines, pipe racks and cold stores built to tight tolerances.

Lattice crane columns on a World Steel job in Can Tho City, Vietnam.

Columns and floor beams of a multi-story steel frame partway through erection

Hotels and resorts

Condado, Isla Verde, Dorado, Río Grande, Rincón

Hotel towers, beach resorts and villas designed for wind, surge and salt air.

Going up beside the plant in Vietnam: World Steel framed its own office building.

Finished steel building in blue wall panels with a walk-in door

Distribution and logistics

Bayamón, Guaynabo, Carolina, Caguas, Ponce

Clear-span warehouses and distribution centres on the expressways near the ports.

Completed, clad building by World Steel in Quang Ngai Province, Vietnam.

Seventy-eight municipalities, six regions

Pick your municipality. Each one has its own steel page.

Puerto Rico has seventy-eight municipalities in six regions: the San Juan metro area with the main port and the airport; the north coast and its karst, from Vega Alta to Quebradillas; the west, from Aguadilla and Mayagüez to Cabo Rojo; the south coast around Ponce; the coffee towns of the central mountains; and the east, from Caguas and Fajardo to Vieques and Culebra. Each page covers the town, the ground, the hurricane and earthquake conditions, the route from the port and the steel we recommend for what gets built there.

San Juan metroNorth coast and karstThe westThe south coastThe central mountainsThe east and the islands

San Juan metro

San Juan, Bayamón, Carolina, Guaynabo, Cataño, Toa Baja, Toa Alta, Trujillo Alto and Dorado: the capital, the main port, the airport and most offices, hospitals and warehouses.

North coast and karst

Vega Alta to Quebradillas along PR-22: pharmaceutical plants, dairy farms and the limestone karst with its caves and sinkholes.

The west

Isabela to Cabo Rojo and the western mountains: Aguadilla’s airport, Mayagüez and its port, surf towns and the Lajas Valley, facing the Mona Passage.

The south coast

Sabana Grande to Patillas: Ponce and its port, power and pharmaceutical plants, farms on the dry plain and the towns shaken in 2020.

The east and the islands

Canóvanas to Maunabo, with Caguas, Humacao and Fajardo, El Yunque, the coast where Maria came ashore, and the islands of Vieques and Culebra.

National symbols of Puerto Rico

Built with respect for Puerto Rico

The lone white star on the blue triangle, the stone garitas on the walls of Old San Juan, the red flamboyán that flowers at the start of every hurricane season, and the bomba and plena drums of Loíza and Ponce. Four symbols, and what each one means for the steel we make for Puerto Rican buildings.

The lone star

The single white star on the blue triangle is the island itself. One island, one design basis, stated on the first sheet of every calculation.

The garita

The stone sentry boxes on the walls of Old San Juan have stood through centuries of storms. Steel frames for the island are designed to stand the same way.

The flamboyán

The red flamboyán tree flowers across the island every summer, at the start of the hurricane season. Every frame we design for Puerto Rico is ready for it.

Bomba and plena

Bomba from Loíza and plena from Ponce are drum rhythms that call and answer. We work the same way with your engineer: questions answered, sheet by sheet.

Buy it all in one place · Puerto Rico

Everything your project in Puerto Rico needs in steel, from one desk

Pharmaceutical and medical plants, schools and hospitals, logistics and power. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF San Juan, with every piece tracked live in PEB Studio.

All solutions and products for Puerto Rico

Picked for Puerto Rico

One desk, every step

  1. DesignTo the basis your engineer of record sets
  2. DrawingsShop and erection drawings, no extra cost
  3. MaterialsNamed mills, a mill certificate for each piece
  4. FabricationLaser cut up to 100 mm, 2,500 t a month
  5. CoatingPaint brands sold locally, galvanizing where needed
  6. Quality controlAn ITP per project, ILAC-accredited labs
  7. PackingErection order, piece marks, packing lists
  8. ShippingFOB Vietnam or CIF San Juan
  9. Your contractor erectsClearance at San Juan, site work and erection, with the engineer of record.
FOBVietnam port, your forwarder
CIFSan Juan, freight and insurance by us
Track it live in PEB Studio →

No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.

Seeking Puerto Rican contractor partners

Puerto Rican contractors: you win the job, we fabricate the steel

Pharmaceutical and medical-device plants on the north coast and in the eastern valleys, hospitals and schools being rebuilt, hotels in San Juan and on the beaches, and warehouses on the expressways: Puerto Rico has some of the largest steel packages in the Caribbean. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to San Juan and back your bid with drawings and live tracking.

  • Pharmaceutical and industrial plants
  • Hospitals, schools and public buildings
  • Warehouses and distribution centres

Hurricanes, salt air, earthquakes

Steel for Puerto Rico’s storms and sea

A broad hazard picture for Puerto Rico and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.

All Caribbean hurricane and marine guides

Real World Steel photos

Every Puerto Rico package starts in our plant in Vietnam

Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Puerto Rico.

Light gray warehouse roof beside process plants, seen from above
Drone view of a World Steel warehouse on an overseas industrial site.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.

Caribbean logistics

Ports for Puerto Rico: shipped from our plant in Vietnam

All Caribbean ports and routes

Questions from Puerto Rican buyers

Puerto Rico questions we hear most

Which building code applies to steel buildings in Puerto Rico?

The Puerto Rico Building Code 2018, based on the 2018 International Building Code, which refers to ASCE 7-16 for loads and to AISC for steel. Permits go through OGPe, or through autonomous municipalities with their own permit offices. Your engineer of record sets the design basis; we state it on the first sheet of our calculations.

How do hurricanes affect steel design in Puerto Rico?

Hugo in 1989, Georges in 1998, Irma and Maria in 2017 and Fiona in 2022 all hit the island. We design the whole load path, from cladding and purlins to anchor bolts, for the wind speed and risk category your engineer sets.

Is Puerto Rico an earthquake zone?

Yes. The island sits between the Puerto Rico Trench to the north, the Muertos Trough to the south and the Mona Passage to the west. The 1918 San Fermín earthquake brought a tsunami to the west coast, and the 2020 sequence in the southwest reached magnitude 6.4. We detail frames and welds to AISC 341 and AWS D1.8 where the design calls for it.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Which port do you ship to?

The port of San Juan, the island’s main container port. Ponce and Mayagüez can be used where the shipping service allows, and steel for Vieques and Culebra crosses from Ceiba by barge.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Talk to an engineer

Send the municipality and the plan. We tell you what Puerto Rico asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.

Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Puerto Rico and the US standards it references. We hold no approval, licence or registration in Puerto Rico and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Contact World Steel · Puerto Rico

Talk to us about steel for Puerto Rico

WhatsApp, email or a video call with our engineers, booked at an hour that suits San Juan. Our contact page for Puerto Rico has the ports, the local time and the form.