Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Louisiana · Petrochemical

Structural steel for Louisiana refining and chemical plants

Between Baton Rouge and New Orleans, refineries and chemical complexes line both banks of the Mississippi, and Lake Charles has its own cluster near the Gulf. Their expansions and new units need pipe racks, process structures, platforms and plant buildings, fabricated to the owner’s specification, coated for humid, corrosive air and designed for hurricane wind.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to your Louisiana site through the Port of New Orleans and the river ports.

Market
Refining and chemicals
Steel
Racks, process structures, platforms
Standard
Owner specification and the code
Reference
Long Son complex, 2,000 t
Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.

Why it matters

Process steel to the owner’s rules

Process plants buy steel to their own specifications: material grades, bolting, welding, coating systems and inspection plans set by the owner and the engineering contractor. The structures carry piping, equipment and wind, and must be erected inside running plants or tight construction sites.

World Steel fabricated 2,000 t of structural steel for the Long Son petrochemical complex in Vietnam. We fabricate to your specification and drawings, with mill certificates by heat and an inspection and test plan agreed with you.

What we design and fabricate

Steel for process plants

Pipe racks

Multi-level racks and bridges between units.

Process structures

Framed structures carrying equipment and piping.

Equipment platforms

Platforms, stairs and ladders for access.

Plant buildings

Control, electrical and maintenance buildings.

Coating systems

Galvanizing or multi-coat paint to your specification.

Inspection plans

ITP agreed with you, records by heat.

Typical choices

Steel by plant area

Final choices follow the owner’s specification and your drawings.

AreaTypical steelNotes
Units and racksRolled and built-up framesGalvanized or painted, bolted connections
Equipment structuresBraced frames and platformsVibration and maintenance access
Plant buildingsClear-span framesHurricane wind, blast design by others

Louisiana

What we do not claim

World Steel names no refiner or chemical company as a customer, claims no Louisiana plant as a completed project and performs no blast design. We fabricate to the drawings and specifications your team approves.

Louisiana ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Louisiana contractors

Louisiana contractors: let’s win the next project together

If your next bid involves petrochemical plants, World Steel wants to be your long-term, win-win steel partner in Louisiana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Louisiana project is cut, welded, inspected and packed.

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Row of columns ending in drilled square base plates
Base plates with their bolt holes on a run of columns, World Steel, Vietnam.
Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.

Q&A

What Louisiana buyers ask

Can you fabricate to our plant specification?

Yes. Grades, bolting, welding, coating and inspection follow your specification and drawings.

Do you galvanize?

Galvanizing is arranged with a galvanizer when the specification calls for it.

Can you agree an inspection and test plan?

Yes. We have a sample ITP; items and rates are agreed with you per project.

Official sources: Louisiana Economic Development: chemicals

Louisiana solutions

Every Louisiana guide

Related pages

Code facts on this page summarize Louisiana practice, the Louisiana State Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.

Building in Louisiana?

Send the drawings or the site address, size and use. We set the Louisiana design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.