Ventilation & services support

Tell us the weight early. We frame for it.

Louvers, ventilators and the support steel that carries rooftop units, fans, ducts and cable trays. When unit weights and locations reach us early, frames and purlins are designed to carry them, and the support steel ships with the 2,500 t a month our plant fabricates.

Inside a tall steel frame with roof purlins and bracing by World Steel Rooftop unit · 1,200 kg (2,650 lb) Exhaust fan · 180 kg (400 lb) Cable tray · 45 kg/m (30 lb/ft) Duct hanger line
Example weights

Status board

What we frame, and what stays with MEP

Rooftop unit curbs and frames

Frame and purlins sized for the unit weight and position.

We frame it

Fan and louver openings

Openings framed between girts with flashings.

We frame it

Duct support steel

Hanger beams and brackets on the shop drawings.

We frame it

Cable tray support steel

Support frames along the tray route.

We frame it

HVAC equipment itself

Supplied only by agreement, from third-party makers.

By MEP

MEP design, permits and installation

Licensed designers and contractors in your state.

By MEP

How we engineer it

Supply versus support

World Steel fabricates the support steel. Fans, rooftop units and other HVAC equipment are third-party products supplied only by agreement.

Coordination

Unit weights and locations are needed early so frames and purlins are designed to carry them.

Before the frame is sized

Send these four things early

Unit weights and locations change frame and purlin sizes. The earlier they reach us, the less re-detailing later.

  • Unit weights, operating and empty
  • Locations on the roof or floor plan
  • Curb and opening sizes
  • Vibration or isolation needs

Equipment-heavy plants

Frames that carry process and service loads

Feed and process plants hang heavy equipment on the steel. Tap a photo to open it full size.

Multi-level steel equipment frame at the Tongwei feed factory Photo
Tall steel process tower framed by World Steel at Tongwei Photo
Aerial view of steel port structures with service frames Photo

Projects outside the US, shown for the structure type; they are not US sites.

Large-project capacity

Service loads on plants this size

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

In the catalog

Services support items in the catalog

Where it meets the other systems

Primary Structural System

Support steel for equipment bolts to the frames or picks up on the purlins.

Design limit: Unit weights and positions have to be known before the frame design is closed out. · What gets checked: Check the support connections against the shop drawings.

Roofing System

Ventilators and other roof penetrations are flashed into the roof sheets.

Design limit: Curbs and flashings are shaped to the exact rib profile of the roof panel. · What gets checked: Water test around each penetration.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Frames and purlins designed for the equipment weights and positions you send
  • Support steel for units, fans, ducts and cable trays, fabricated and coated in our plant
  • Louvers and wall ventilators, with framed and flashed openings
  • HVAC equipment from third-party makers, only by agreement

The US contractor, our customer

  • HVAC and MEP engineering by separately qualified designers
  • Equipment installation, connections and permits by licensed contractors in your state
  • Drawing approval, the PE seal and the permit with your Engineer of Record

Questions from US contractors

Services support questions and answers

6 answers, grouped by topic.

What we supply 2 answers

Do you supply the HVAC equipment?

World Steel fabricates the support steel. Fans, rooftop units and other HVAC equipment are third-party products, supplied only by agreement.

Which support steel can you make?

Equipment frames and platforms, duct and cable tray supports, hanger beams and lighting supports, all on the shop drawings with the main steel.

Coordination 3 answers

When do you need equipment weights?

As early as possible, ideally with the first design. Unit weights and locations change frame and purlin sizes, and late changes can mean re-detailing.

What if the equipment changes after design?

Send the new weights and positions before fabrication. We check the frames and purlins again and update the shop drawings.

Who designs the MEP systems?

Separately qualified HVAC and MEP designers. Their systems are permitted and installed by licensed contractors in your state.

Large projects 1 answer

Do you have experience with equipment-heavy plants?

Yes. Feed and food plants such as Tongwei, about 1,500 t in phase 1, and CPV Food, about 2,500 t, carry heavy process and service equipment on World Steel frames.

Keep reading

Related pages

Covered in our state guides

Price it or partner with us

Send the equipment list with weights.

We design the frames and purlins for it and fabricate the support steel with the building, ready for your MEP contractors.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Have this system engineered for your site

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details