Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Inspector walking a line of painted built-up members on the shop floor

Engineering & standards · Welding

Every structural weld made in our Vietnam plant, every weld on record

None of the structural welding on a World Steel building happens on your jobsite. It all takes place in our factory, where procedures, welders and inspection are under control. On US-code work we meet your specification's welding requirements, usually AWS D1.1, through qualified procedures, qualified welders and an inspection plan you can witness on the shop floor or from your desk.

Fabrication accreditation
IAS AC472 Part A covering welded fabrication, current to 1 Aug 2027
Welding quality system
Bureau Veritas certification to EN ISO 3834-2
Web-to-flange welds
Automated submerged arc welding
Weld inspection
Every weld visually checked; UT, MT or PT added to the extent your specification sets

Three joints, five documents

What gets welded in a steel frame, and the paper trail behind every weld

Almost every structural weld in a World Steel building is one of three joint types. Each is made to a written, tested procedure by a qualified welder, then inspected and filed under its piece mark.

Fillet weld

Stiffeners, clips, end plates on lighter members, brackets.

Complete-joint-penetration groove

Flange splices, moment end plates where the design requires full strength, crane brackets.

Web-to-flange seam

The long welds that build a plate girder or tapered frame, run on automated submerged arc lines.

  1. WPS

    Welding Procedure Specification: process, filler, joint, position, preheat and settings.

  2. PQR

    Procedure Qualification Record: test coupons that prove the WPS works before your steel.

  3. Welder qualification

    Each welder tested by process and position for the joints they weld.

  4. Inspection and Test Plan

    Which welds get visual, UT, MT or PT, and where you can stop and witness.

  5. Weld record

    Procedure, welder and result under the piece mark, closed into the Manufacturing Data Record.

14 answers from our engineers

AWS D1.1 questions and answers

What owners, inspectors and engineers ask about structural welding in our Vietnam plant: procedures, welders, inspection and testing, witnessing from the US and the records you receive.

Not answered here?Send your AWS D1.1 question with the drawings. An engineer replies in writing.

Procedures and welders 4 answers

What is the difference between a prequalified and a qualified WPS?

AWS D1.1 lists joint details, processes and filler combinations that are prequalified: proven by long experience, so no procedure test is needed if every limit is respected. Anything outside those limits needs a WPS qualified by test, backed by a PQR.

Which welding processes does your plant use?

Submerged arc welding on automated lines for long web-to-flange seams, and flux-cored or gas metal arc welding for fittings, stiffeners and end plates. Each process has its own procedures and welder qualifications.

How often are welders re-qualified?

A welder's qualification stays valid while they keep using the process; AWS D1.1 requires a re-test if they have not used it for six months or if there is a reason to question their skill. Our records track that for every welder.

Do you preheat thick steel before welding?

Yes, when the steel thickness, grade and process call for it. Minimum preheat comes from the WPS, following AWS D1.1, and is checked before welding starts on thick plates and heavy sections.

Inspection and testing 4 answers

Are your welds tested?

All of them are inspected visually. UT, MT or PT is added to the extent your specification and the code call for, and that extent is written into the Inspection and Test Plan.

What do UT, MT and PT each find?

Ultrasonic testing (UT) looks inside groove welds for lack of fusion, cracks and porosity. Magnetic particle testing (MT) finds surface and near-surface cracks. Penetrant testing (PT) shows surface-breaking defects. Each suits different joints, as the code and your specification set.

Who performs the non-destructive testing?

Technicians qualified for each method, working to written NDT procedures. Their qualifications are part of the submittal, and your special inspector can review results or witness the tests.

What happens when a weld fails inspection?

It is marked, repaired to a repair procedure, and inspected again by the same method. The original result, the repair and the re-test all stay in the record under the piece mark.

Witnessing from the US 3 answers

May our inspector watch the weld checks?

Yes, either at the plant in person or online over Zoom or Microsoft Teams, with video kept on file. A third-party agency can do the same.

Can IAS AC472 stand in for special inspection?

Only for the shop portion, and only if your building official agrees under IBC §1704.2.5. Everything inspected in the field is still inspected.

Can we see the welding records in PEB Studio?

Yes. Weld reports are filed per component, and a report will not close unless the WPS, PQR and welder qualification check out. You can open a member and export its full record to PDF.

On your site 3 answers

Is any welding done on our jobsite?

The frame arrives ready to bolt, so its connections need no welding on site. If another trade welds embed plates or similar items, that work sits outside our contract.

What if the field crew needs to weld something to our steel?

Ask before they do. Welding to a member can damage coatings, add heat to a stressed area or land in a protected zone on seismic frames. We check the request and issue a detail if it is acceptable.

How do the welds survive shipping across the Pacific?

Welds are inspected before blasting and painting, then members are bundled with timber dunnage and strapped to avoid knocks. Coating touch-up materials ship with the steel for any transit damage.

More answers on every US code we design to: search all standards questions.

The code in brief

What AWS D1.1 asks of a fabricator

AWS D1.1, the Structural Welding Code for steel, sets out how welded joints are designed, which procedures are allowed and how they are proven, how welders show they can make the weld, and how finished welds are inspected and accepted. AISC 360 refers to it for welded steel buildings, and most US specifications name it outright. AWS D1.3 covers sheet steel, and designated welds in seismic systems add the AWS D1.8 seismic supplement.

Buyers can boil it down to a short test. Before production there should be a written procedure for each weld type, test results proving it, and evidence that every welder using it is qualified. During and after welding, inspection should follow acceptance criteria you agreed to, and all of it should be on file.

On the shop floor

How we control welding on your job

  1. Read your spec

    Your welding and inspection requirements are reviewed and confirmed in our proposal.

  2. Procedures in place

    Before production, each joint type on your job has a written procedure backed by a test record, and only qualified welders use it.

  3. Machine-welded main seams

    Built-up frames get their web-to-flange welds on automated submerged arc lines for steady penetration along the whole member.

  4. Inspection

    Every weld is inspected visually. On top of that, UT, MT or PT is applied to the welds your specification or the code singles out.

  5. Witness points

    Hold points can be witnessed in person at the plant or remotely over Zoom or Microsoft Teams, by you, your inspector or a third-party agency, and the video is archived.

  6. Records

    Results are filed under the piece mark and later assembled into the Manufacturing Data Record.

Why this helps at permit time

Welded under a roof, bolted on site

No structural field welds

Field joints are bolted, so the welds that carry wind, snow and seismic load are made and checked in the factory, not from a lift in bad weather.

Shop inspection waiver

IBC §1704.2.5 allows the building official to waive special inspection of shop fabrication for an approved fabricator. IAS AC472 is a recognized approval program, and your building official decides how it applies.

Seismic welds

When your lateral system falls under AISC 341, welds in that system meet it and the AWS D1.8 supplement.

Witness from the US

A video link puts your inspector on our shop floor during a hold point, with no flight to Vietnam.

Open the weld records

Quality history, one component at a time

A weld report in PEB Studio will not close unless the WPS, PQR and welder qualification check out, and acceptance follows whatever criteria your project names, AWS D1.1 among them. Any component's full record exports to PDF.

PEB Studio quality history for one member, listing stages and inspection attempts (demonstration data) Demonstration data

Quality

Each inspection attempt kept on file

Every member carries its own quality log: date and result for each stage, the welding procedure applied and every inspection attempt, failed ones and post-repair re-inspections included.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Request these

Welding records for your submittal

  • Procedure specifications and their qualification records for your joints
  • Qualification records for the welders
  • The Inspection and Test Plan, with every stop point marked
  • NDT procedures and the qualifications of the technicians
  • Pass or fail on each inspected weld, sorted by piece mark
  • The Manufacturing Data Record once fabrication is complete

Who does what under AWS D1.1

The fabricator welds and inspects; your team specifies and verifies

AWS D1.1 separates the contractor's inspection, done by the fabricator, from verification inspection on behalf of the owner. On a World Steel job the split looks like this.

World Steel

  • Qualifies each WPS, prequalified or backed by a PQR
  • Qualifies welders by process and position and keeps their qualifications current
  • Makes every structural weld in the plant; field joints are bolted
  • Inspects every weld visually and adds UT, MT or PT to the extent your specification sets
  • Files each result under its piece mark in PEB Studio

US contractor and Engineer of Record

  • Name the weld categories and the extent of NDT in the specification or on the drawings
  • Approve shop drawings with the weld symbols
  • Decide on any change to procedures or acceptance criteria

Owner's inspector and building official

  • Perform verification inspection, or accept a waiver for an approved fabricator under IBC Chapter 17
  • Witness hold points at the plant or over a video link
  • Review the weld records before the steel is released

What an inspector asks

Six welding questions an inspector asks, and the record that answers each

Each question is answered by a document that exists before the steel ships, not by a promise.

AWS D1.1 Clauses 5 and 6

Is this WPS prequalified or qualified by test?

Each WPS states its basis; a WPS qualified by test comes with its PQR attached.

AWS D1.1 Clause 6

Who welded this piece, and are they qualified?

The welder's ID is recorded against the piece mark, with the qualification record by process and position.

AWS D1.1 Clause 5

What preheat was used on the thick plate?

Preheat and interpass temperatures are set in the WPS by steel grade and thickness, and checked at the joint.

AWS D1.1 Clause 8

Which welds got NDT, and to what criteria?

NDT extent per your specification, method and acceptance criteria named, results by piece mark, technician qualifications attached.

AWS D1.1 Clause 7

How was a rejected weld repaired?

A nonconformance report with the repair procedure, the re-inspection result and the sign-off.

AWS D1.1 Clause 5

Does the filler metal match the base metal?

The consumable and its classification are named in each WPS for the ASTM grades being joined.

Go deeper

Four guides behind a D1.1 weld record

Each step of the weld record has its own page, with the documents and the checks explained in full.

Real photos from World Steel

Where the welding on your steel is done and checked

Photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.

Two welders operating a submerged-arc welding station on a member Photo
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Long shop floor of built-up members, overhead cranes and a center walkway Photo
One of the World Steel fabrication halls in Vietnam where US orders are built.
Fabricated members lined up along a railed walkway Photo
Fabricated members lined up in a World Steel shop, Vietnam.
Fabricated steel assemblies being lifted onto transport for export Photo
Exported steel in place in Malaysia: a World Steel job abroad, shown for the building type rather than a US site.

AWS D1.1 never works alone

The standards and guides it works with

Each link opens the full page, with its own questions and answers.

Honest status

Two credentials stand behind our welding: EN ISO 3834-2 certification of the welding quality system and IAS AC472 Part A accreditation of fabrication. For AWS D1.1, the evidence is project-specific: the procedures, welder qualifications and inspection plan your engineer reviews; no AWS certification is claimed here.

Who does what

World Steel designs, fabricates and supplies the steel structure from its own plant in Vietnam. The US contractor, our customer, erects it, has the drawings approved and sealed by their Engineer of Record and pulls the permit.

Details confirmed in quote Edition: Per project specification

Source record: https://worldsteelgroup.com/

Last checked: November 8, 2026. Editions change on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.

All US codes & standards

Want to see the welding records before you order?

Ask for sample WPS, PQR and inspection records for the joints on your job. We send them with the proposal, and your inspector can witness hold points live.