South Carolina adopts the International Building Code statewide through the South Carolina Building Codes Council, with state modifications. Counties and cities must enforce the adopted codes and can make only limited local modifications, approved by the Council. The edition is the same across the state; the plan reviewer is your local building department.
Why it matters
One state code, local reviewers
Statewide adoption keeps the design basis consistent from Greenville to Charleston. The adopted IBC edition decides which ASCE 7 edition sets the wind and seismic loads, and those loads differ sharply between the Upstate and the coast.
We state the code edition, the jurisdiction and the loads on the first sheet of the calculations. Your Engineer of Record confirms them, and the steel design, connections and drawings follow from there.
Who does what
The permit path, split clearly
World Steel prepares
- Steel design to the adopted IBC and ASCE 7
- Design calculations and drawings for review
- Tekla shop and erection drawings, included
- Anchor bolt layouts and foundation reactions
- Mill certificates and fabrication records
The US contractor arranges
- Engineer of Record review, approval and PE seal
- Submittal to the county or city building department
- Special inspections on site under IBC Chapter 17
- Foundations, erection and site work
- The building permit and certificate of occupancy
What we check first
Four questions before the first calculation
Which jurisdiction?
The county or city that reviews and inspects your site.
Which edition?
The IBC edition in force and its ASCE 7 edition.
Wind or seismic?
Coastal wind speed and the Seismic Design Category.
Which inspections?
Special inspections the reviewer expects for the steel.
What we do not claim
World Steel holds no South Carolina approval, registration or engineering license. Drawing approval, the PE seal, plan review and the permit stay with the US contractor and the Engineer of Record.
South Carolina ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.