Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Michigan · Delivery

Structural steel delivery to Michigan by port and rail

Michigan has no container port on the ocean, so steel from our plant arrives the way most goods from Asia do: through a West Coast port and by rail through Chicago to Detroit, Lansing or Grand Rapids, or through an East Coast port and then by rail or truck. Members are packed in erection order so each load matches the next area to erect.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port and rail to your Michigan site.

Spec plateRail and ports

West Coast
Los Angeles and Long Beach
East Coast
New York–New Jersey
Inland
Rail through Chicago
Our part
Packed in erection order
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.

The route

How steel reaches a Michigan site

Ports of Los Angeles and Long Beach

The largest West Coast gateway, with daily intermodal trains east to Chicago.

Port page →

Port of New York–New Jersey

The main East Coast gateway, with rail and truck routes west.

Port page →

Rail through Chicago

Intermodal trains to Detroit, Lansing and Grand Rapids.

Truck to site

The last leg, with loads matched to the erection area.

How we pack

Packed for the trip and the erector

Erection order

Each load holds the members for the next area.

Piece marks

Every member marked to match the erection drawings.

Protected bundles

Bundled and protected for rail and truck.

Live tracking

Loading and shipping followed in PEB Studio.

Michigan

Michigan ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Michigan contractors

Michigan contractors: let’s win the next project together

If your next bid involves rail and ports, World Steel wants to be your long-term, win-win steel partner in Michigan. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Michigan project is cut, welded, inspected and packed.

Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Seaside industrial site with a steel warehouse at its center, wide drone shot
Wide aerial of a World Steel warehouse on a seaside site outside the US.

Q&A

What Michigan buyers ask

Which port is best for Michigan?

It depends on the site, the rail service available and the schedule. We plan the route with your logistics team.

Can you deliver to the site?

We can quote delivery terms from the plant to the port of discharge or further. See Incoterms explained for the options.

How are members packed?

In erection order, with piece marks and protected bundles, so each load matches the next area to erect.

Official sources: Michigan Department of Transportation, rail

Michigan solutions

Every Michigan guide

Related pages

Code facts on this page summarize Michigan practice, the Michigan Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the code and edition in force for your permit.

Building in Michigan?

Send the drawings or the site address, size and use. We set the Michigan design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the port and rail trip to your site.