Data center steel · Roof plant and hung services

A data center roof carries a plant room, not just weather

Cooling units, dry coolers, exhaust fans and their screens often sit on the roof, while cable tray, busway, ducts and sprinkler mains hang below it. All of it lands on the same frame. We model the plant and the services with the steel, so the roof is designed once for what it really carries.

Four load sources

What the roof steel has to carry

Equipment weight

Operating weights of cooling units and fans, with their curbs, rails and isolation bases, from the equipment schedule.

Wind on equipment and screens

ASCE 7-22 rooftop structure and equipment provisions apply to the units and to screen walls, which can carry more wind than the unit behind them.

Snow drift

Screens and large units cause drifts on the roof around them, designed to ASCE 7-22 Chapter 7 for the ground snow at your site.

Seismic forces on equipment

In seismic regions the supports carry the ASCE 7-22 Chapter 13 forces on nonstructural components, with the anchorage your EOR specifies.

Dunnage done once

Dunnage that matches the equipment you actually buy

Rooftop dunnage is often drawn late, after the equipment is selected, and then field-welded to fit. We prefer to set it out from the equipment schedule as soon as the units are chosen, model it with the frame in Tekla and fabricate it with the roof steel, so the supports arrive cut, drilled and marked for the unit they carry.

If the equipment changes, the model shows which supports move. Dunnage is bolted where possible so a unit can be replaced in future without cutting the roof frame.

Below the roof

Hung services and how the frame takes them

ServiceTypical supportWhat we coordinate
Cable tray and ladder rackThreaded-rod hangers or strut from purlins and secondary steelHanger module and allowance per run from your electrical model
BuswayHanger steel at fixed centersDeflection limits from the busway maker, agreed with your EOR
Ducts and air handlingTrapeze supports and framed openingsOpenings, headers and duct weights from your mechanical model
Sprinkler and pre-action mainsHangers to the roof structurePipe weights and hanger points from your fire protection engineer

How we coordinate it

From an equipment schedule to steel on the roof

  1. Equipment schedule in

    Weights, footprints, curb types and isolation from your MEP engineers.

  2. Loads agreed

    Operating, wind, snow and seismic cases confirmed with your Engineer of Record.

  3. Modeled with the frame

    Dunnage, screens, walkways and hanger steel in one Tekla model, checked against your MEP model.

  4. Marked for the unit

    Each support piece-marked for the equipment it carries and packed with its roof area.

Who does what

World Steel supplies the steel. Your contractor builds.

World Steel, from our plant in Vietnam

  • Dunnage, screens and walkways designed with the roof frame
  • Clash check of supports against your MEP model
  • Hanger steel detailed and drilled in the shop
  • Galvanizing or coating for exposed rooftop steel

The US contractor, our customer, and others

  • Equipment selection, isolation and anchorage hardware
  • Roofing installation and waterproofing at curbs
  • Erection of steel and setting of equipment
  • Drawing approval, PE seal and permit

Real photos

From World Steel’s plant and jobs

Our own shop floors and past work, shown for the kind of steel on this page. Not stock images, and not a data center.

Pair of red truss assemblies with bolted connection plates inside the shop Photo
Two trusses finished in red primer at World Steel in Vietnam.
Space-truss roof being erected over a large food processing hall Photo
Space-truss roof under erection on a World Steel job in southern Vietnam.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related pages

Questions from US contractors

Heavy roof & MEP loads: questions we hear

Do you supply the cooling equipment?

No. Cooling units, fans and their isolators are designed by your MEP engineers and procured separately. We design and fabricate the steel they stand on and the steel the services hang from.

Can rooftop dunnage be galvanized?

Yes. Exposed rooftop steel can be hot-dip galvanized or coated with a system chosen for the exposure at your site.

What if the equipment changes after design?

The Tekla model shows which supports are affected. Changes are priced and scheduled with you before anything already in fabrication is touched.

Does World Steel provide shop drawings for data center steel?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure; the US contractor and their Engineer of Record review and approve the calculations and drawings, and handle the PE seal and the permit.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and the owner’s design criteria govern, and your Engineer of Record confirms them for each project.

Talk to our data center steel team

Send the campus plan, the owner’s design criteria and the phase you are pricing. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.