Aerospace halls
Denver, Boulder, Littleton and Colorado Springs
Tall column-free assembly and test halls, crane runways and large door openings, designed for snow and downslope wind.
Hangar, Thailand: long-span World Steel structure
Six trail markers
From the rail yards of Denver to the plants on the plains and the resorts in the high country, Colorado’s large projects sit at very different elevations. The elevation sets the snow, and the snow sets the steel.
Data centers, distribution and the rail yards that bring steel to the state.
Aerospace, research and advanced manufacturing along the foothills, in downslope wind.
Aerospace and space-industry campuses and the plants that serve them.
Food and meat plants, energy and wind-tower manufacturing on the plains.
Steel, wind-tower and heavy plants on the Arkansas River.
Resort, utility and public buildings under the heaviest snow in the state.
Food, farm and energy buildings in wind and hail, with lighter snow.
Data centers, distribution and multi-story buildings around the rail hub.
Aerospace, research and food plants from Boulder to Fort Collins, in downslope wind.
Aerospace campuses in Colorado Springs and heavy plants in Pueblo.
Resort, utility and public buildings designed to county snow tables.
Energy, farm and distribution buildings from Grand Junction to the basins.
Colorado guides
One guide per Colorado condition: local codes, snow by elevation and Front Range wind and hail, and the aerospace, energy, food and beverage, rail logistics and data center projects that drive the market.
Ready for Colorado
2,500 metric tons of structural steel a month from our own plant, released area by area.
Large-project program →Calculations and drawings that state the code edition your county or city enforces.
Local codes guide →Ground snow from the county table or ASCE 7 for the site, with drift on every roof.
Snow by elevation guide →Downslope wind on the foothills and hail on the plains, for frames, doors and cladding.
Wind and hail guide →The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.
IAS AC472 accreditation →Tekla shop and erection drawings for every Colorado project at no extra cost, ready for approval.
Shop drawings, included →Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.
PEB Studio tracking →Packed in erection order for the rail leg from the West Coast to Denver and on to your site.
Denver rail guide →Solution advisor
Structural steel for the project types Colorado builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Denver, Boulder, Littleton and Colorado Springs
Tall column-free assembly and test halls, crane runways and large door openings, designed for snow and downslope wind.
Hangar, Thailand: long-span World Steel structure
Pueblo, Brighton, Windsor and Weld County
Heavy crane bays, long assembly halls and yard steel for tower, blade, solar and energy equipment plants.
GPPD energy factory, Vietnam: plant steel by World Steel
Greeley, Fort Morgan, Golden and Fort Collins
Process halls with washable details, cold rooms and roof plant steel, designed for snow and hail.
CPV Food plant, Vietnam: 2,500 t of World Steel structural steel
Aurora, Denver and the northern Front Range
Data hall frames, roof and yard equipment steel and phased campus packages near power.
JRI factory, Thailand: World Steel frames
Denver, Aurora, Commerce City and I-25
Clear-span and multi-span frames with tall clear heights and long dock walls, released area by area.
Warehouse 50 × 140 m, Thailand: clear-span World Steel frames
Summit, Grand, Pitkin and Routt counties
Frames, purlins and roof steel for heavy county snow loads, with drift and sliding snow checked.
Montaki warehouse, Japan: World Steel frames for a snow climate
Weld County, the DJ Basin and the Western Slope
Equipment shelters, process structures and pipe racks, with coatings for the service.
Long Son petrochemical complex, Vietnam: 2,000 t of World Steel structural steel
Denver, Boulder and Colorado Springs
Multi-story steel frames with composite floors and braced cores, coordinated with your Engineer of Record.
Southgate Tower, Vietnam: multi-story steel by World Steel
The Colorado ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large Colorado structures, beyond metal buildings.
Complete buildings engineered for Colorado sites.
Members and parts made in our Vietnam plant.
The design basis your local reviewer checks.
How you buy and follow your steel.
From the plant in Vietnam to your Colorado site.
Open call · Colorado contractors
Aerospace halls from Denver to Colorado Springs, energy and wind-tower plants on the plains, food and beverage plants in Weld County and data centers around Denver are large steel packages. You win the job and run the site; World Steel designs and fabricates the structural steel, 2,500 t a month from its own plant, designed for your elevation and railed to Denver in erection order.
Where Colorado partners win with us
Buying steel from outside the US
The questions Colorado owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant, the intake yard, the shop floor, fit-up, stiffened members, blasting, painted steel and packed members. None is shown as a Colorado site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from Colorado buyers
Colorado has no single building code for every private building. Counties and home-rule cities adopt an edition of the IBC with their own amendments, and many mountain counties publish their own snow loads. We confirm the code, the edition and the local snow and wind values with your Engineer of Record before modeling.
A great deal. A roof on the plains near Greeley and a roof in Summit County can carry several times different ground snow. Where the county publishes a value by elevation, the design follows it; otherwise ASCE 7 sets it for the site.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to follow your erection sequence.
Usually through the ports of Los Angeles and Long Beach, then by rail to Denver, or through Houston and north by truck and rail. Members are packed in erection order for the last leg to your site.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, snow, wind and delivery questions for your site.
Honest status. World Steel designs and fabricates to the IBC edition your Colorado county or city adopts, its snow table and ASCE 7. We hold no state or local approval and no Colorado engineering license, and we do not apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, elevation, size and use. We set the Colorado design basis with your Engineer of Record, design or detail the steel to your local code, snow table and wind, and quote it made in our plant in Vietnam, packed in erection order for the rail trip to your site.