Engineering & standards · Connection design

Connection design responsibility, settled before the first drawing

On US work, the question of who designs the steel connections is answered in the contract, and the AISC Code of Standard Practice offers three answers. For a World Steel metal building, we design the connections that belong to our system and submit them for your Engineer of Record to review, so there is no gap in responsibility.

Standards
AISC 360-22 and the RCSC Specification, with AISC 341 where it applies
Contract framework
The connection design options in the AISC Code of Standard Practice
World Steel scope
Every connection in our building system, calculations included
On site
Field connections are bolted, without exception

AISC Code of Standard Practice

Three ways to assign connection design, and how a World Steel job runs

The Code of Standard Practice gives the contract three choices. Each row shows who does the work; the last column shows the World Steel arrangement for a metal building or structural steel package.

Option 1Connections fully designed in the contract documents
Designs every connection
—
Draws them as designed
Common in design-bid-build. We detail and fabricate exactly as drawn and raise RFIs on anything hard to build or ship.
Option 2Connections selected from tables or schematics
Provides tables and loads
—
Completes details from the tables
Used for simple framing. We complete the details in Tekla and submit them for review.
Option 3Connection design delegated to the steel supplier
Reviews and approves
Design the connections
Draws them in Tekla
The usual arrangement on a World Steel job: our engineers design every connection in our system; the US contractor's Engineer of Record reviews, approves and seals where required.

11 answers from our engineers

Connections questions and answers

Who designs the connections, who reviews them, what the calculations show and how changes are handled: the questions contractors and Engineers of Record ask before they sign a steel contract.

Not answered here?Send your Connections question with the drawings. An engineer replies in writing.

Responsibility 4 answers

On a metal building, whose job is the connection design?

Ours, in the usual arrangement: the supplier engineers its system including every joint, and your Engineer of Record reviews it. Write that split into the contract so nobody is left guessing.

What if our engineer would rather detail the joints?

That works too. We build the joints in Tekla exactly as your engineer drew them and raise an RFI wherever a detail would be hard to fabricate or ship.

Does World Steel seal its connection calculations?

No. World Steel designs the connections and submits calculations for review; the US contractor's Engineer of Record reviews and approves them and applies any seal the jurisdiction requires.

Who designs connections between our steel and another trade's?

Interfaces such as steel to concrete embeds, to masonry or to another supplier's framing are agreed at the start. We design our side and give loads; the other trade or your Engineer of Record designs theirs.

Calculations and checks 4 answers

Where do the connection design forces come from?

From the SAP2000 model of the whole structure, for every load combination. Each joint is designed for its governing forces, not a generic table value, and the calculation shows which combination governs.

Which limit states do you check at a bolted end plate?

Bolt tension and shear, plate bending, prying action, column flange and web local effects, weld strength at the plate and stiffener needs, following AISC 360 and the AISC Design Guides for end plates.

Do you check base plates and anchor rods?

Yes, the steel side: plate bending, anchor rod tension and shear, and bearing. Concrete breakout, embedment and the footing are checked by your foundation engineer from our reactions.

Are seismic connections designed differently?

Yes. In an AISC 341 system, connections are designed for the force the yielding member can actually deliver, not just the analysis force, and moment connections follow AISC 358 or a tested detail.

Field joints and changes 3 answers

Are any connections welded on site?

No. Field connections on a World Steel frame are bolted, without exception. All structural welding is done and inspected in our plant.

What if a field joint does not fit?

Stop and call us before cutting, reaming or welding. We check the cause with photos and measurements and issue a fix. Field changes made without approval sit outside our design.

How are design changes after approval handled?

The connection is redesigned in the model, the affected drawings are reissued under a new revision and the change is logged, so the as-built record matches what was made and shipped.

More answers on every US code we design to: search all standards questions.

Our method

Connection design on a World Steel job, step by step

  1. Whole-building forces

    Design forces for each joint are taken from the SAP2000 model of the complete structure.

  2. Design and model

    Each joint is checked to AISC 360 and RCSC, then built in Tekla Structures.

  3. Submittal

    The calculations and details travel with the approval drawings to your Engineer of Record.

  4. Make and log

    Approved joints go to the shop floor, where each is made, checked and logged under its piece mark.

Who does what with connections

Every connection has an owner before the first drawing

The AISC Code of Standard Practice lets a contract assign connection design in more than one way. On a World Steel building, the split is settled in the proposal.

World Steel

  • Designs every connection in our building system, with calculations
  • Welds shop connections in the plant and details field joints as bolted
  • Shows each connection, plate and bolt on the shop drawings

US contractor and Engineer of Record

  • Review and approve the connection design
  • Design connections to anything outside our system, such as the foundation or existing work
  • Make the field bolted connections to the drawings

Inspector

  • Checks the shop welds and the field bolting the specification calls for
  • Confirms plates, bolts and hole types against the drawings
  • Reports any field modification before it is accepted

What a reviewer looks for

Five connection checks a reviewer looks for

Each check has a calculation and a detail, and the two agree because both come from one model.

The reviewer checksWhere it comes fromWhat our package shows
End-plate moment connectionsAISC 360 Chapter J with Design Guide 16Plate bending, bolt tension and prying checked for each typical knee and ridge.
Base plates and anchor rodsAISC Design Guide 1Bearing, plate bending and anchor rod forces reported, with reactions for the foundation engineer.
Bracing connectionsAISC 360 Chapter JGusset, weld and bolt checks for rod and angle bracing.
Seismic connectionsAISC 341Where the system is seismic, connections designed to its required strengths.
Bolt grades and joint typesRCSC SpecificationEach bolted joint labeled snug-tight, pretensioned or slip-critical.

Go deeper

Four pages behind a connection

From the bolts to the plates, each part of a connection has its own page.

Real photos from World Steel

Connections made in the plant, bolted on site

Photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.

Members in gray finish paint laid out in the paint hall Photo
Gray finish coat applied in the Vietnam paint hall.
Steel stair tower attached to the side of a multi-story frame Photo
Stair tower on a multi-story World Steel frame in southern Vietnam.
Port structures several stories high under construction, drone view Photo
Exported steel in place in Singapore: a World Steel job abroad, shown for the building type rather than a US site.
Crew loading steel parts onto the shot-blasting conveyor Photo
Parts going into the blaster ahead of primer, World Steel, Vietnam.

Connections never works alone

The standards and guides it works with

Each link opens the full page, with its own questions and answers.

Approval

Our connection calculations go to your Engineer of Record for review and approval. Any PE seal your jurisdiction requires stays with the US contractor, our customer, and their engineer.

Who does what

World Steel designs, fabricates and supplies the steel structure from its own plant in Vietnam. The US contractor, our customer, erects it, has the drawings approved and sealed by their Engineer of Record and pulls the permit.

Details confirmed in quote Edition: As your project specifies

Source record: https://worldsteelgroup.com/pre-engineered-buildings/

Last checked: November 8, 2026. Editions change on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.

All US codes & standards

Want the connection responsibility settled in writing?

Send your specification or contract draft. We confirm which option applies, what our engineers design and what goes to your Engineer of Record for review.