Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Wyoming · Data centers

Structural steel for Cheyenne data center campuses

Cheyenne’s cool, dry climate, power and fiber have drawn some of the largest data center campuses in the Mountain West. Campuses grow hall by hall with repeat frames, mezzanines and roof plant steel, all in special wind regions with drifting snow. We fabricate them as phased releases.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail along I-80 for your Wyoming site.

Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.
Hub
Cheyenne
Pattern
Repeat halls
Loads
Wind and drift
Release
Hall by hall

Why it matters

Cool air, hard wind

Each hall repeats the frames, electrical galleries and roof plant of the last, and the schedule depends on releasing the next hall while the last is erected. Roof plant and screens must be checked for wind and drift.

We keep repeat drawings, pack each hall in erection order and track every member in PEB Studio, so the site sees what ships next.

What we design and fabricate

Steel for data halls

Hall frames

Long-span frames that repeat from hall to hall.

Mezzanines and decks

Electrical rooms and galleries on composite or steel deck.

Roof plant steel

Platforms and screens for cooling units.

Cable and duct supports

Tray, duct and equipment support steel by system.

Who does what

Data campus steel, split clearly

World Steel supplies

  • Hall frames, mezzanines and roof plant steel
  • Repeat drawings and phased releases
  • Steel packed in erection order by hall
  • Live production tracking in PEB Studio
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Campus design with the owner’s Engineer of Record
  • Engineer of Record approval and PE seal
  • Foundations, slabs and utilities
  • Mechanical, electrical and controls
  • Erection and site work

Wyoming

What we do not claim

World Steel names no Wyoming data center owner as a customer and claims no completed Wyoming project. Photos show World Steel projects abroad and our plant in Vietnam.

Wyoming ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Wyoming contractors

Wyoming contractors: let’s win the next project together

If your next bid involves Cheyenne data centers, World Steel wants to be your long-term, win-win steel partner in Wyoming. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Wyoming project is cut, welded, inspected and packed.

Hot-dip galvanized welded steel frames laid on trestles in a fabrication shop
Galvanized welded frames back from the kettle, laid out on trestles in the shop, Vietnam.
Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.

Q&A

What Wyoming buyers ask

Can you repeat a hall design?

Yes. We keep repeat drawings and release hall by hall.

Do you check rooftop units for wind and drift?

Yes. Screens and platforms are checked for both.

Do you name data center owners?

No. World Steel names no company as a customer on this site.

Official sources: Wyoming Business Council

Wyoming solutions

Every Wyoming guide

Related pages

Code facts on this page summarize Wyoming practice, the code that applies at your site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Wyoming?

Send the drawings or the site address, size and use. We set the Wyoming design basis with your Engineer of Record, design or detail the steel for Wyoming wind, drifting snow and northwest seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail along I-80 for the truck to your site.