Distribution and logistics
Joliet, Elwood, Minooka and the I-55 and I-80 corridors
Clear-span and multi-span frames with tall clear heights, long dock walls and roofs designed for snow drift.
Warehouse 50 × 140 m, Thailand: clear-span World Steel frames